Heat & Glo LifeStyle ST-36TRB-IPI owner manual Vent Components Diagrams, DVP-AS2

Page 69

B. Vent Components Diagrams

 

Pipe

Effective Length

 

 

 

 

Inches

Millimeters

10-1/2 in.

 

 

 

 

 

 

Effective

DVP4

4

102

(267 mm)

45 °

 

Height/Length

DVP6

6

152

 

 

 

 

 

 

 

 

DVP12

12

305

4-7/8 in.

 

 

 

DVP24

24

610

 

 

 

( 276 mm)

 

 

 

 

 

 

 

 

 

DVP36

36

914

 

10-7/8 in.

 

DVP Pipe (see chart)

DVP48

48

1219

 

(276 mm)

 

DVP6A

3 to 6

76 to 152

DVP45 (45 Elbow)°

 

 

 

 

DVP12A

3 to 12

76 to 305

 

 

 

 

DVP12MI

3 to 12

76 to 305

 

 

 

 

DVP24MI

3 to 24

76 to 610

 

 

 

 

 

 

 

 

11-3/8 in.

 

 

 

 

 

 

(289 mm)

 

 

10 in.

1 in.

 

 

 

 

(254 mm)

 

 

 

 

(25 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7-3/8 in.

 

 

 

 

 

 

(187 mm)

 

10 in.

 

 

 

 

1-1/4 in. (32 mm)

 

(254 mm)

 

 

9-1/4 in.

 

 

Assembled

 

 

 

 

 

 

 

 

(235 mm)

1/2 in. TYP

 

Height: 24 in./610 mm

 

 

 

13-1/4 in.

(13 mm)

 

Diameter: 10 in./254 mm

 

 

 

 

 

 

 

 

(337 mm)

 

 

 

 

 

 

 

 

DVP-AS2

DVP-FS (Ceiling Firestop)

DVP90ST (90° Elbow)

 

 

 

 

 

 

 

 

 

 

12 in.

1 in.

 

 

 

 

 

(305 mm)

(25 mm)

 

10 in.

1- 1/2 in.

 

 

 

8 in.

 

 

 

 

(203 mm)

 

(254 mm)

(38 mm)

 

14 in.

 

 

 

 

 

 

 

 

 

UP

 

 

(356 mm)

 

 

 

 

 

 

 

 

5 in.

12 in.

 

 

 

 

 

(127 mm)

(305 mm)

 

 

 

 

 

 

 

 

 

6 in.

 

 

 

 

 

 

(152 mm)

 

 

DVP-HVS (Vent Support)

 

 

 

DVP-WS (Wall Shield Firestop)

 

Figure 16.4 DVP vent components

 

 

 

 

 

 

Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI2128-900 Rev. H • 8/11

69

Image 69
Contents What to do if you smell gas HOT SurfacesHot glass will cause burns Homeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupFinishing Reference MaterialsLimited Lifetime Warranty  B. Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Fixed Glass Assembly Blower InstallationRemote Controls, Wall Controls and Wall Switches Blower Kit optionalFinal inspection by Lighting Instructions IPIWhat to do if YOU Smell GAS GAS ValveFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Maintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Remote ControlGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianVenting LogsIPI Pilot Flame Patterns Burner Ignition and OperationTypical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Any such action may cause a fire hazardSelecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseRCOR-36TRB-IPI PIER/LCOR/RCOR Combustible Mantel Mantel and Wall Projections See-Through Combustible MantelSee-Through Non-Combustible Mantel PIER/LCOR/RCOR Non-Combustible MantelTOP View Termination Locations Vent Termination Minimum ClearancesGas, Wood or Fuel Oil Termination Cap Covered Alcove Applications Approved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsTo SLP series vent pipe, if desired Vent DiagramsTop Vent-Horizontal Termination-Two 45 Elbows Elbow on rear vent appliancesTwo Elbows Top Vent Horizontal Termination One ElbowV1 Minimum H1 Maximum V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Three Elbows 152 mm305 mm Exhaust restrictor Instructions 15 ft 20 ft 25 ft 30 ft 35 ft 40 ft 45 ft 50 ft 55 ft Break HereMaximum + V 2 Minimum Two Elbows Three Elbows12 ft 18 ft V1 + V2 + H1 = 50 ft 15.2 m Maximum H1+ H2 V1 + V2 Minimum H1+ H2 MaximumPage Rear Vent Horizontal Termination Two Elbows H1 Maximum V1 Minimum H2 Maximum H1+ H2 MaximumH1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 V1 Minimum H1 Maximum Rear Vent Vertical Termination One ElbowV1+ H1 = 40 ft 12.2 m Maximum Minimum + H 2 MaximumRear Vent Vertical Termination Three Elbows H1 Maximum V1 Minimum H1+ H2 MaximumV1 Minimum H1+ H2+ H3 Maximum Vent Clearances and Framing Pipe Clearances to CombustiblesContinue Adding Vent Components Combustible Wall Penetration Wall Penetration FramingNon-Combustible Wall Penetration CorrectPipe DVP SLP Vertical Penetration FramingInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentProceed to . C Cut the metal retaining band Rear VentAttach Nailing Tab to Front Corner of Unit Securing and Leveling the ApplianceAttach Vent to the Firebox Assembly Installing Vent Pipe DVP and SLP PipeAssemble Vent Sections DVP Pipe Only Assemble Pipe Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingInstall Decorative Wall Components SLP only Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Important Notice Heat shields may not be field constructedDVP-HPC1 DVP-HPC2 Install Horizontal Termination Cap DVP and SLP PipeFuel Conversion Gas InformationGas Pressure Gas ConnectionWiring Requirements Optional Accessories RequirementsElectrical Information Intellifire Ignition Wiring Diagram with Remote Receiver Wall Switch Installation for Fan Optional Junction Box InstallationTo install the Splatter Guard FinishingSplatter Guard To Remove the Splatter Guard To Close the Lower Access PanelPIER/LCOR/RCOR Mantel Projection Mantel and Wall Projections See-Through Mantel ProjectionFacing Material Finishing MaterialStop finishing material flush with opening Finishing material between 1 and 2 inches thick Finishing materials over 1 inch thickElevated Hearth Systems Appliance Setup 2128-935 Install the Log AssemblyIndentations Install Trim Kits and Surrounds Air Shutter SettingAir Shutter Settings Troubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System flame rectification has Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters Pier Dimensions Electrical Access GAS Line Left View Front View Right View40-1/2 Left View Front View Electrical Access GAS Line Right View24-1/2 33-1/2DVP-AS2 Vent Components DiagramsHorizontal Termination Cap DVP-TRAPBEK DVP-BEK2 RF6M RF12MDVP-TRAPFL COOL-ADDDVP-TV Power Vent Inline Optional Wire HarnessPVI-SLP SLP-LPCCeiling Firestop ElbowSupport SLP-WSSLP-SNKD SLP-CCS-BK DVP-FBHTSLP-DCF-BK Log Set Assembly Service PartsAt Depot See Through Direct Vent Gas FireplacePier Direct Vent Fireplace PIER-36TRB-IPILeft Corner Direct Vent Fireplace LCOR-36TRB-IPIRight Corner Direct Vent Fireplace RCOR-36TRB-IPIStocked #15 Valve AssemblyLPK-DXV Service Parts ListContact Information