Heat & Glo LifeStyle ST-36TRB-IPI owner manual Vent Diagrams, To SLP series vent pipe, if desired

Page 26

E. Vent Diagrams

To replace the first starter elbow with two 45° elbows, refer to Figure 7.3. All other 90° elbows can be replaced with two 45° elbows.

General Rules:

A maximum of three 90° elbows (or six 45° elbows) may be used in any vent configuration. Some elbows may be installed horizontally. See Figure 7.6.

Elbows may be placed back to back anywhere in the system as long as the first 90° elbow is a starter elbow except as shown in Figure 7.3.

When penetrating a combustible wall, a wall shield firestop must be installed.

When penetrating a combustible ceiling, a ceiling firestop must be installed.

Horizontal runs of vent do not require vertical rise; horizontal runs may be level.

Note: The Multi-Sided series fireplaces can adapt

to SLP series vent pipe, if desired.

When venting off the top of the unit, attach a DVP-2SLadapter to the appliance starting collar, immediately followed by a minimum 48 inch vertical section of SLP series vent pipe.

After the 48 inch vertical section, the venting table rules must be followed. The first 48 inch vertical section is NOT counted as part of the vertical components in the table. It is still counted as part of the overall maximum run. All venting table rules for the vent run must still be followed.

Example: DVP pipe 3 ft. min. vertical = 11 ft. max. horizontal SLP pipe 7 ft. min. vertical = 11 ft. max. horizontal

Top Vent—Horizontal Termination—Two 45° Elbows

 

Note: Reference Figure 7.14 for

Installation requirements to replace the first 90° elbow with two 45° elbows:

special instructions for use of 45º

 

elbow on rear vent appliances.

4 ft min.

(1.22 m)

16 ft max.

(4.87 m)

Figure 7.3

26

Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI2128-900 Rev. H • 8/11

Image 26
Contents Hot glass will cause burns What to do if you smell gasHOT Surfaces Congratulations Homeowner Reference InformationTable of Contents User GuideFinishing Appliance SetupTroubleshooting Reference Materials B. Limited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Remote Controls, Wall Controls and Wall Switches Blower InstallationFixed Glass Assembly Blower Kit optionalWhat to do if YOU Smell GAS Lighting Instructions IPIFinal inspection by GAS ValveAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Glass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Remote ControlVenting Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsBurner Ignition and Operation IPI Pilot Flame PatternsGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesRCOR-36TRB-IPI See-Through Non-Combustible Mantel Mantel and Wall Projections See-Through Combustible MantelPIER/LCOR/RCOR Combustible Mantel PIER/LCOR/RCOR Non-Combustible MantelTOP View Gas, Wood or Fuel Oil Termination Cap Termination LocationsVent Termination Minimum Clearances Covered Alcove Applications Vent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsTop Vent-Horizontal Termination-Two 45 Elbows Vent DiagramsTo SLP series vent pipe, if desired Elbow on rear vent appliancesV1 Minimum H1 Maximum Top Vent Horizontal Termination One ElbowTwo Elbows V1 Minimum H1 + H2 Maximum305 mm Top Vent Horizontal Termination Three Elbows152 mm Exhaust restrictor Instructions Break Here 15 ft 20 ft 25 ft 30 ft 35 ft 40 ft 45 ft 50 ft 55 ft12 ft 18 ft V1 + V2 + H1 = 50 ft 15.2 m Maximum Two Elbows Three ElbowsMaximum + V 2 Minimum H1+ H2 V1 + V2 Minimum H1+ H2 MaximumPage H1 Maximum V1 Minimum H2+ H3 H1+ H2+ H3 Rear Vent Horizontal Termination Two ElbowsH1 Maximum V1 Minimum H2 Maximum H1+ H2 Maximum V1+ H1 = 40 ft 12.2 m Maximum Rear Vent Vertical Termination One ElbowV1 Minimum H1 Maximum Minimum + H 2 MaximumV1 Minimum H1+ H2+ H3 Maximum Rear Vent Vertical Termination Three ElbowsH1 Maximum V1 Minimum H1+ H2 Maximum Continue Adding Vent Components Vent Clearances and FramingPipe Clearances to Combustibles Non-Combustible Wall Penetration Wall Penetration FramingCombustible Wall Penetration CorrectVertical Penetration Framing Pipe DVP SLPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Proceed to . C Appliance PreparationTop Vent Rear Vent Cut the metal retaining bandSecuring and Leveling the Appliance Attach Nailing Tab to Front Corner of UnitAssemble Vent Sections DVP Pipe Only Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Pipe Sections DVP Pipe OnlyAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only Important Notice Heat shields may not be field constructedInstall Horizontal Termination Cap DVP and SLP Pipe DVP-HPC1 DVP-HPC2Gas Pressure Gas InformationFuel Conversion Gas ConnectionElectrical Information Wiring RequirementsOptional Accessories Requirements Intellifire Ignition Wiring Diagram with Remote Receiver Junction Box Installation Wall Switch Installation for Fan OptionalSplatter Guard To install the Splatter GuardFinishing To Close the Lower Access Panel To Remove the Splatter GuardMantel and Wall Projections See-Through Mantel Projection PIER/LCOR/RCOR Mantel ProjectionStop finishing material flush with opening Facing MaterialFinishing Material Finishing materials over 1 inch thick Finishing material between 1 and 2 inches thickElevated Hearth Systems Appliance Setup Install the Log Assembly 2128-935Indentations Air Shutter Settings Install Trim Kits and SurroundsAir Shutter Setting Intellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action flame rectification has Location Inches Millimeters Appliance Dimension DiagramReference Materials Electrical Access GAS Line Left View Front View Right View Pier Dimensions24-1/2 Left View Front View Electrical Access GAS Line Right View40-1/2 33-1/2Vent Components Diagrams DVP-AS2DVP-TRAP Horizontal Termination CapDVP-TRAPFL RF6M RF12MBEK DVP-BEK2 COOL-ADDDVP-TV PVI-SLP Optional Wire HarnessPower Vent Inline SLP-LPCSupport ElbowCeiling Firestop SLP-WSSLP-DCF-BK SLP-SNKD SLP-CCS-BKDVP-FBHT At Depot Service PartsLog Set Assembly See Through Direct Vent Gas FireplacePIER-36TRB-IPI Pier Direct Vent FireplaceLCOR-36TRB-IPI Left Corner Direct Vent FireplaceRCOR-36TRB-IPI Right Corner Direct Vent Fireplace#15 Valve Assembly StockedService Parts List LPK-DXVContact Information