Desa SDVBPC, SDVBNC installation manual Venting with Two Elbows

Page 18

18

VENTING INSTALLATION

Installation for Vertical Termination (Cont.)

VENTING INSTALLATION

Continued

Venting with Two 90° Elbows

Vertical (V)

Horizontal (H1) +

 

Horizontal (H2)

5' min.

2' max.

6' min.

4' max.

7' min.

6' max.

8' min.

8' max.

20' max.

8' max.

Note: Install

restrictor into 4"

collar of burner system as shown.

Venting with Two

90° Elbows

Vertical (V1)

Horizontal (H)

5' min.

6' max.

6' min.

12' max.

7' min.

18' max.

8' min.

20' max.

Note: Vertical (V1) + Vertical (V2) = 20' max.

Note: Install restrictor into 4" collar of burner system as shown.

Figure 37 - Vertical Venting Configuration Using Two 90° Elbows with Two Horizontal Runs

Figure 38 - Vertical Venting Configuration Using Two 90° Elbows

For..com

107304-01D

Image 18
Contents OWNER’S Operation and Installation Manual For Your SafetyFor Your Safety What to do if YOU Smell GAS Table of Contents Safety InformationProduct Identification ON/OFFPRE-INSTALLATION Preparation Product Features Local CodesGlossary of Terms PRE-INSTALLATION Preparation Cast Iron Stove and DIRECT-VENT Burner System AssemblyStove Body Assembly Removing Pallet Wood From The Bottom of The Stove Attaching Lower Stove Door Panel Installing DIRECT-VENT Burner System Into Stove Body Installing Optional Blower Accessory Installing the BlowerInstalling Rear Cover Securely in place before venting pipes are installedGeneral Venting Location of Vent TerminationGeneral Venting Venting Installation Installation PrecautionsInstallation Planning Installation for Horizontal Termination Installing Vent System in a ChaseInstalling Horizontal Vent Cap Noncombustible Exterior Horizontal Termination Configurations Horizontal VentingInstallation for Vertical Termination Flat Ceiling InstallationCathedral Ceiling Installation Vertical Termination ConfigurationsVenting with Two Elbows High Altitude Installation Parts Lists for Venting Kits and ComponentsInstallation Items Needed Stove and DIRECT-VENT Burner System InstallationInstalling GAS Piping to STOVE/ Burner System Location Check GAS TypeConnecting STOVE/BURNER System to GAS Supply Pressure Testing Gas Supply Piping SystemChecking GAS Connections Installing Optional Wall Mount Switch GWMS2 Pressure Testing Burner System Gas ConnectionsInstalling Optional Wall Mounted Thermostat GWMT1 Installing Remote Receiver and 9-volt Alkaline BatteryInstalling Remote Receiver REMOVING/REPLACING Glass DoorInstalling LOGS, Lava Rock and Glowing Embers Installing Log No Installing Log NoLighting Instructions For Your Safety Read Before LightingOperating Stove with Burner System To Turn OFF GAS To ApplianceThermostat Control Operation Manual Lighting ProcedureOptional Remote Operation Ghrcta Series OperationInspecting Burners Operating Optional Blower AccessoryPilot Assembly Operating Optional GWMT1 Wall Mounted ThermostatPilot and Burners Cleaning and MaintenanceGlass Door LogsTroubleshooting Observed Problem Possible CauseObserved Problem Possible Cause Remedy Gas leak. See Warning statement Replacement Parts SpecificationsWiring Diagram Parts Under WarrantyIllustrated Parts Breakdown Sdvbnc SdvbpcParts List KEY Sdvbnc Sdvbpc Description QTYAmity Stove Chassis SCIVFC* Series PSCIVFC* Series Indicates Color Suffix DesignationKEY Part Description QTY Technical Service Service HintsAccessories Owners Registration Form Postage Required 107304-01D Warranty Information