Desa SDVBNC, SDVBPC Cathedral Ceiling Installation, Vertical Termination Configurations

Page 17

VENTING INSTALLATION

Installation for Vertical Termination (Cont.)

17

VENTING INSTALLATION

Continued

6.Continue to add pipe sections until the height of the vent cap meets the minimum building code requirements described in Figure 21 on page 11. Note: You must increase vent height for steep roof pitches. Nearby trees, adjoining rooflines, steep pitched roofs, and other similar factors may cause poor draft or down-drafting in high winds. Increasing the vent height may solve this problem.

7.Twist-lock the vent cap onto the last section of vent pipe and seal outer pipe connection with high temperature silicone seal- ant as specified in the second warning statement on page 12.

Note: If the vent pipe passes through any occupied areas above the first floor, including storage spaces and closets, you must enclose pipe. You may frame and sheetrock the enclosure with standard construction material. Make sure and meet the minimum allowable clearances to combustibles. Do not fill any of the required air spaces with insulation.

Cathedral Ceiling Installation

1.Remove shingles or other roof covering as necessary to cut the rectangular hole for the support box. Mark the outline of the cathedral ceiling support box on the roof sheathing using the locating hole as a center point.

2.Cut the hole 1/8" larger than the support box outline (see Figure 34).

3.Lower the support box through the hole in the roof until the bottom of the box extends at least 2" below the ceiling (see Figure 34). Align the support box vertically and horizontally using a level. Temporarily tack the support box in place through the inside walls and into the roof sheathing.

4.Using tin snips, cut the support box from the top corners down to the roofline and fold the resulting flaps over the roof sheath- ing (see Figure 35). Apply a bead of nonhardening mastic around the top edges of the support box to make a seal between the box and the roof. Nail in place with roofing nails. Remove any com- bustible material that might be inside of the support box.

5.Complete the cathedral ceiling installation by following the same procedures outlined in steps 2 through 7 for Flat Ceiling Instal- lation, starting page 16.

Level

Cathedral Ceiling

Support Box

2" minimum below finished ceiling

Cut hole 1/8" larger than support box when projected onto roofline

Figure 34 - Cathedral Ceiling Support Box Installation

Nonhardening mastic under all edges of support box before nailing

Figure 35 - Installed Cathedral Ceiling Support Box

Vertical Termination Configurations

Figure 36 through 39 show four different configurations for vertical termination. All connections must be sealed with high temperature silicone sealant as specified in the second warning statement on page 12.

Venting with One 90° Elbow

Vertical (V)

Horizontal (H)

5' min.

2' max.

6' min.

4' max.

7' min.

6' max.

8' min.

8' max.

20' max.

8' max.

Note: Install restrictor into 4" collar of burner system as shown.

Figure 36 - Vertical Venting Configuration Using One 90° Elbow

For morevisit www..com

107304-01D

Image 17
Contents For Your Safety What to do if YOU Smell GAS OWNER’S Operation and Installation ManualFor Your Safety Safety Information Table of ContentsON/OFF Product IdentificationGlossary of Terms PRE-INSTALLATION Preparation Product FeaturesLocal Codes Stove Body Assembly PRE-INSTALLATION PreparationCast Iron Stove and DIRECT-VENT Burner System Assembly Removing Pallet Wood From The Bottom of The Stove Attaching Lower Stove Door Panel Installing Optional Blower Accessory Installing the Blower Installing DIRECT-VENT Burner System Into Stove BodySecurely in place before venting pipes are installed Installing Rear CoverLocation of Vent Termination General VentingGeneral Venting Installation Planning Venting InstallationInstallation Precautions Installing Vent System in a Chase Installation for Horizontal TerminationInstalling Horizontal Vent Cap Noncombustible Exterior Horizontal Venting Horizontal Termination ConfigurationsFlat Ceiling Installation Installation for Vertical TerminationVertical Termination Configurations Cathedral Ceiling InstallationVenting with Two Elbows Parts Lists for Venting Kits and Components High Altitude InstallationInstalling GAS Piping to STOVE/ Burner System Location Stove and DIRECT-VENT Burner System InstallationInstallation Items Needed Check GAS TypeChecking GAS Connections Connecting STOVE/BURNER System to GAS SupplyPressure Testing Gas Supply Piping System Pressure Testing Burner System Gas Connections Installing Optional Wall Mount Switch GWMS2Installing Remote Receiver and 9-volt Alkaline Battery Installing Optional Wall Mounted Thermostat GWMT1REMOVING/REPLACING Glass Door Installing Remote ReceiverInstalling Log No Installing Log No Installing LOGS, Lava Rock and Glowing EmbersOperating Stove with Burner System For Your Safety Read Before LightingLighting Instructions To Turn OFF GAS To ApplianceOptional Remote Operation Manual Lighting ProcedureThermostat Control Operation Ghrcta Series OperationPilot Assembly Operating Optional Blower AccessoryInspecting Burners Operating Optional GWMT1 Wall Mounted ThermostatGlass Door Cleaning and MaintenancePilot and Burners LogsObserved Problem Possible Cause TroubleshootingObserved Problem Possible Cause Remedy Gas leak. See Warning statement Wiring Diagram SpecificationsReplacement Parts Parts Under WarrantySdvbnc Sdvbpc Illustrated Parts BreakdownKEY Sdvbnc Sdvbpc Description QTY Parts ListIndicates Color Suffix Designation Amity Stove Chassis SCIVFC* Series PSCIVFC* SeriesKEY Part Description QTY Accessories Technical ServiceService Hints Owners Registration Form Postage Required 107304-01D Warranty Information