STOVE AND DIRECT-VENT BURNER SYSTEM INSTALLATION

Installing Optional Wall Mounted Thermostat - GWMT1 Installing Optional Wireless Hand-Held Remote Control Accessories - GHRC and GHRCTA Series

23

STOVE AND DIRECT-VENT BURNER SYSTEM INSTALLATION

Continued

INSTALLING OPTIONAL WALL MOUNTED THERMOSTAT - GWMT1

WARNING: Installation must be done by a qualified installer familiar with low voltage wiring procedures.

WARNING: Do not connect this thermostat to any electrical source! Electrical shock and/or fire hazard will occur.

1.Open lower door panel. The valve is attached to the underside of the burner system assembly.

2.Disconnect from the valve the wires running from the ON/ OFF switch.

3.Connect one terminal of the wire for the wall thermostat to the THTP terminal on the valve. Connect remaining wire terminal to the TH terminal on the valve. Make sure that the wire termi- nals are in the positions on the unit as pictured in Figure 46, page 22. If wires are not connected as shown the thermostat will not work.

4.Route the wire to a convenient location to mount your thermo- stat (no outside wall). IMPORTANT: The wire must not ex- ceed 25 feet in length. The thermostat should be mounted 54" above the floor in a location where there is good air circula- tion. Avoid heat sources such as lamps, direct sunlight, fire- place, or heat and air conditioning ducts.

5.Gently remove the cover of the thermostat from the base. Grasp the sides of the cover firmly and pull to separate from the base.

6.Feed the electrical wires through the rectangular slots (from the back) on each side of the base (see Figure 47).

WARNING: Do not connect this thermostat to a power source. Electrical shock and/or fire hazard will occur.

7.Connect one bare wire end to each terminal (“W” and “R”) of the thermostat base (see Figure 48).

8.Install the base to the wall with screws provided with thermostat.

9.Move the temperature adjustment back and forth to insure the bimetal is free from restrictions.

10.Replace the cover onto the base. (Upon installation, the ther- mostat must be allowed to stabilize at room temperature for a minimum of 30 minutes for proper operation.)

11.Set the temperature adjustment to the desired setting. This ther- mostat has been electronically calibrated at the factory. No ad- justment or leveling is necessary.

Feed wires through rectangular slots

Terminal “W”

W

 

Terminal “R”

 

R

Figure 47 - Back View of

Figure 48 - Thermostat

Thermostat Base

Base Terminal “W” and “R”

INSTALLING OPTIONAL WIRELESS HAND- HELD REMOTE CONTROL ACCESSORIES - GHRC AND GHRCTA SERIES

NOTICE: Use only alkaline batteries (not included).

Installing Remote Receiver and 9-volt Alkaline Battery

1.Open bottom door on stove body.

2.Disconnect wires from THTP and TH on control valve that lead to the switch (see Figure 46, page 22). Discard switch plate, screws, and nuts.

3.Install 9-volt battery (not included) into receiver battery clip and connect to terminals (see Figure 49).

Receiver

9-Volt

BatteryTerminal Wires

Battery Clip

Figure 49 - Installing Battery in Receiver

For morevisit www..com

107304-01D

Image 23
Contents For Your Safety What to do if YOU Smell GAS OWNER’S Operation and Installation ManualFor Your Safety Safety Information Table of ContentsON/OFF Product IdentificationGlossary of Terms PRE-INSTALLATION Preparation Product FeaturesLocal Codes Stove Body Assembly PRE-INSTALLATION PreparationCast Iron Stove and DIRECT-VENT Burner System Assembly Removing Pallet Wood From The Bottom of The Stove Attaching Lower Stove Door Panel Installing Optional Blower Accessory Installing the Blower Installing DIRECT-VENT Burner System Into Stove BodySecurely in place before venting pipes are installed Installing Rear CoverLocation of Vent Termination General VentingGeneral Venting Installation Planning Venting InstallationInstallation Precautions Installing Vent System in a Chase Installation for Horizontal TerminationInstalling Horizontal Vent Cap Noncombustible Exterior Horizontal Venting Horizontal Termination ConfigurationsFlat Ceiling Installation Installation for Vertical TerminationVertical Termination Configurations Cathedral Ceiling InstallationVenting with Two Elbows Parts Lists for Venting Kits and Components High Altitude InstallationCheck GAS Type Stove and DIRECT-VENT Burner System InstallationInstalling GAS Piping to STOVE/ Burner System Location Installation Items NeededChecking GAS Connections Connecting STOVE/BURNER System to GAS SupplyPressure Testing Gas Supply Piping System Pressure Testing Burner System Gas Connections Installing Optional Wall Mount Switch GWMS2Installing Remote Receiver and 9-volt Alkaline Battery Installing Optional Wall Mounted Thermostat GWMT1REMOVING/REPLACING Glass Door Installing Remote ReceiverInstalling Log No Installing Log No Installing LOGS, Lava Rock and Glowing EmbersTo Turn OFF GAS To Appliance For Your Safety Read Before LightingOperating Stove with Burner System Lighting InstructionsGhrcta Series Operation Manual Lighting ProcedureOptional Remote Operation Thermostat Control OperationOperating Optional GWMT1 Wall Mounted Thermostat Operating Optional Blower AccessoryPilot Assembly Inspecting BurnersLogs Cleaning and MaintenanceGlass Door Pilot and BurnersObserved Problem Possible Cause TroubleshootingObserved Problem Possible Cause Remedy Gas leak. See Warning statement Parts Under Warranty SpecificationsWiring Diagram Replacement PartsSdvbnc Sdvbpc Illustrated Parts BreakdownKEY Sdvbnc Sdvbpc Description QTY Parts ListIndicates Color Suffix Designation Amity Stove Chassis SCIVFC* Series PSCIVFC* SeriesKEY Part Description QTY Accessories Technical ServiceService Hints Owners Registration Form Postage Required 107304-01D Warranty Information