Sierra Monitor Corporation IZS31 „ Connection with the power supply for I/O signal, OUT4

Page 14

6. Wiring of the power supply cable

Connect dedicated power supply cables.

„Connection with the power supply for ionizer operation

Symbol

Cable

Cable name

Connection

Description

 

color

 

 

 

DC1+

Brown

Power supply DC24V

Power supply cable for

DC1-

Blue

Power supply GND[FG]

ionizer operation

OUT4

Dark

Sensor monitor output

 

Charged potential of the

 

Green

 

work is output with

 

 

 

 

analog signal (1 to 5V)

DC Power supply

Brown

Blue

Ground

Be sure to ground DC1(-)Blue. (Resistance between the lead wire and the earth ground should be 100Ω or less.) If not, it may break the ionizer.

„Connection with the power supply for I/O signal

Symbol

Cable

Cable name

Conne

 

color

 

ction

DC2+

Red

Power supply DC24V

DC2-

Black

Power supply GND

IN1

Light

Discharge-stop signal

 

 

Green

 

 

 

 

 

 

 

 

 

IN2

Gray

Maintenance start-up signal

 

 

 

 

 

 

 

White

Orange

OUT1

Pink

Completion signal for

 

 

 

static charge elimination

 

 

 

 

OUT2

Yellow

Maintenance output signal

 

 

 

 

 

 

 

OUT3

Purple

Signal for failure

 

 

 

 

 

 

 

 

Description

Power supply cable for I/O signal

Signal for starting/ stopping the discharge

NPN specOperation will begin when it is connected with DC2-)[Black.

PNP specOperation will begin when it is connected with DC2+)[Red.

A signal that is input when the maintenance of the electrode needle is necessary.

Outputs when the charged potential of the work is +/-30V or more, and when the dirt on the electrode needle is detected.

Outputs when the maintenance of the electrode needle is necessary.

Outputs in case of abnormal high voltage and sensor and/or CPU failure.

(B contact output

Wires that are minimum required to operate the ionizer. △ : Wires that are required to use the functions.

Wires that are not necessary with the sensing DC mode. These wires should not be short-circuited with other cables.

7.Air piping

When the piping is only connected to one port, the other unused port should be plugged with the M-5P that is packaged together with the ionizer.

13

Image 14
Contents IZS31 Series Doc. No.IZ*-OMK0015 BInstallation of Ionizer body ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ Safety instructions Installation To 1.5 NmWiring and piping Environment Attached M4 threads InstallationInstallation of Ionizer body Intermediate bracket M5 threadsM3 screws Installation of sensorInstallation of sensor head Metal plate Operation mode Function descriptionSee the selection of models and setting Detection of the dirt on the electrode needle.Selection and setting of equipment .Sensing DC mode„ Connection with the power supply for I/O signal OUT4„ Alarm LED ・・・ Failure of the ionizer is displayed „ ION LED ・・・ The charged condition of the work is displayedAlarm Timing chart „ Timing chart with a normal operationPulse DC mode Auto ManualFunction Power supply cable for„ Connection power supply for I/O signal Ionizer drive„ Alarm LED ・・・ Failure of the ionizer will be indicated Goes out② Auto operation (b)W/o auto balance sensor.DC mode „ ION LED ・・・ The discharged ion polarity is displayed Power supply cable connection circuit PNP .Ionizer .Specifications[Electrode cartridge quantity and weight] 300 380 620 780 1100 1260 1500 1900 2300„ Detection range of Feedback sensor „ Sensor monitor output When feed back sensor is used.Sensor