Sierra Monitor Corporation IZS31 Installation of Ionizer body, Attached M4 threads

Page 7

accident.

3. Do not open the case to disassemble and reconstruct the product.

It may cause electric shock, operation failure and disaster such as fire. In addition, note the product, which is disassembled or reconstructed, may not satisfy the functions and performance in the specifications and is out of guarantee.

4.Do not operate the product with the wet hands. It may cause electric shock or accident.

!WARNING

1.Do not drop, hit to the object and give excessive impact (10G or more) at handling.

Though Ionizer itself doesn’t break, inside construction might be broken and cause malfunction.

2.When cable is mounted or eliminated, pinch modular plug claw with finger and insert or take out the plug itself vertically. If mounted or eliminated to inappropriate direction, mounting part of modular jack might be damaged and finally it leads to operation failure.

2. Installation

2-1. Installation of Ionizer body

Investigate the places where static problem occurs, or process and parts which generate ESD (Electro static discharge), and carefully consider the required conditions to ensure appropriate static charge elimination before installation.

1.Installation height

When the ionizer is installed, keep the distance between charged objects and the ionizer within the

range below.

Ion-production

Distance between the charged objects and ionizer (mm)

frequency

 

 

With air purge (note)

W/o air purge

Hz

 

 

1

400 to 2000

400 to 500

3

300 to 2000

300 to 400

5

300 to 2000

300 to 400

10

200 to 2000

200 to 300

15

200 to 2000

200 to 300

20

150 to 2000

150 to 250

30

50 to 2000

50 to 200

60

50 to 2000

50 to 150

(Note)As the installation height stated above is a standard, check the effect of the static charge elimination before installation.

The minimum installation height should be 200mm or more when the feed back sensor is use, and that for the auto balance sensor should be 100mm or more. When the ionizer is used outside of these conditions, be sure to check if these sensors will operate properly.

2.Mount end brackets on both sides of the ionizer body with the attached M4 threads.

Attached M4 threads

6

Image 7
Contents Doc. No.IZ*-OMK0015 B IZS31 SeriesInstallation of Ionizer body ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ Safety instructions To 1.5 Nm InstallationWiring and piping Environment Installation of Ionizer body InstallationAttached M4 threads M5 threads Intermediate bracketInstallation of sensor head Installation of sensorM3 screws Metal plate Function description Operation modeDetection of the dirt on the electrode needle See the selection of models and setting.Sensing DC mode .Selection and setting of equipmentOUT4 „ Connection with the power supply for I/O signal„ ION LED ・・・ The charged condition of the work is displayed „ Alarm LED ・・・ Failure of the ionizer is displayedTiming chart „ Timing chart with a normal operation AlarmAuto Manual Pulse DC modeIonizer drive Power supply cable for„ Connection power supply for I/O signal FunctionGoes out „ Alarm LED ・・・ Failure of the ionizer will be indicated(b)W/o auto balance sensor ② Auto operation.DC mode „ ION LED ・・・ The discharged ion polarity is displayed Power supply cable connection circuit PNP 300 380 620 780 1100 1260 1500 1900 2300 .Specifications[Electrode cartridge quantity and weight] .Ionizer.Sensor „ Sensor monitor output When feed back sensor is used„ Detection range of Feedback sensor