Sierra Monitor Corporation IZS31 operation manual Installation of sensor head, M3 screws

Page 9

6.Be sure to ground the DC1 (-) lead wire [blue] of the power supply cable (Resistance between the lead wire and the earth ground should be 100Ω or less.)

If the lead wire is not grounded, the ion balance will be unstable, and an electric shock may occur. At the same time, the ionizer and power supply might be damaged.

Ground the DC1 (-) lead wire [blue] of the power supply cable

2-2. Installation of sensor

1.Installation of sensor head

DC Power supply

Brown

Blue

Ground

„Feed back sensor

Keep the detecting hole of the sensor head towards the charged object to precisely detect the target’s static charge. Keep the distance between the detecting hole and surface of the charged object within 10 to 50mm to prevent the sensor from coming in contact with the charged object. The detecting range and sensor output will be changed depending on the installation distance.

Mount the sensor head with two pieces of M3 screws (sold separately).

M3 screws

As the sensor head case is connected to the GND, pay great attention to the installation or power supply to prevent

short-circuit between the GND and 24V power supply.Detecting hole The detecting hole is open to detect static electricity. When

foreign substances are intruded into the hole or tools come in contact with the inside of the detecting hole, it leads to a malfunction or damage of the sensor, resulting in an improper detection of the static electricity. Therefore, do not put any foreign substances in the detecting hole or touch it with a tool.

Do not pull a cable out of the sensor head. If the cable is pulled with a strong force, the sensor head might be damaged or its wires might be broken.

8

Image 9
Contents Doc. No.IZ*-OMK0015 B IZS31 SeriesInstallation of Ionizer body ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ Safety instructions To 1.5 Nm InstallationWiring and piping Environment Installation Installation of Ionizer bodyAttached M4 threads M5 threads Intermediate bracketInstallation of sensor Installation of sensor headM3 screws Metal plate Function description Operation modeDetection of the dirt on the electrode needle See the selection of models and setting.Sensing DC mode .Selection and setting of equipmentOUT4 „ Connection with the power supply for I/O signal„ ION LED ・・・ The charged condition of the work is displayed „ Alarm LED ・・・ Failure of the ionizer is displayedTiming chart „ Timing chart with a normal operation AlarmAuto Manual Pulse DC mode„ Connection power supply for I/O signal Power supply cable forFunction Ionizer driveGoes out „ Alarm LED ・・・ Failure of the ionizer will be indicated(b)W/o auto balance sensor ② Auto operation.DC mode „ ION LED ・・・ The discharged ion polarity is displayed Power supply cable connection circuit PNP [Electrode cartridge quantity and weight] .Specifications.Ionizer 300 380 620 780 1100 1260 1500 1900 2300„ Sensor monitor output When feed back sensor is used .Sensor„ Detection range of Feedback sensor