Sierra Monitor Corporation IZS31 .DC mode, „ Connection with the power supply for I/O signal

Page 21

4-3DC mode

1.Selection of bar length

Select the length applicable to work size base on static charge elimination area and static charge elimination characteristics.

2.

Installation of body

 

 

Keep the distance between the ionizer and charged objects within 50 to 2000mm. Although the ionizer

 

can be mounted outside of this range, it may not operate properly depending on the operating conditions.

 

Therefore, be sure to check if the ionizer will operate properly.

3.

Installation of the sensor

 

 

[Plus ion discharge] or [minus ion discharge] can be selected.

 

Ion polarity

Switch setting

 

Plus ion discharge

8

 

Minus ion discharge

9

4.Wiring of the power supply cable

Connect dedicated power supply cables.

„Connection with the power supply for ionizer operation

Symbol

Cable

Cable name

Connection

Description

 

 

 

color

 

 

 

 

Brown

Power supply DC24V

Power supply cable for

DC1 +

 

 

 

 

Blue

Power supply GND[FG]

ionizer operation

DC1 -

 

 

 

 

OUT4

 

 

Dark

Sensor monitor output

 

 

 

Green

 

 

 

 

 

 

 

DC Power supply

Brown

Blue

Ground

Be sure to ground DC1(-)Blue.(Resistance between the lead wire and the earth ground should be 100Ωor less.) If not, it may break the ionizer.

„Connection with the power supply for I/O signal

Symbol

Cable

Cable name

Connection

 

color

 

 

DC2+

Red

Power supply DC24V

DC2-

Black

Power supply GND

IN1

Light

Discharge-stop signal

 

 

Green

 

 

 

 

 

 

 

 

 

IN2

Gray

Maintenance start-up

 

 

signal

 

 

 

White

Orange

OUT1

Pink

Completion signal for

 

 

static charge elimination

 

 

 

OUT2

Yellow

Maintenance output

 

 

signal

 

 

 

OUT3

Purple

Signal for failure

 

 

 

 

 

 

 

 

Description

Power supply cable for I/O signal

Signal for starting/ stopping the discharge

NPN specOperation will begin when it is connected with DC2-)[Black.

PNP specOperation will begin when it is connected with DC2+)[Red.

Outputs in case of abnormal high voltage and sensor and/or CPU failure.

(B contact output

Wires that are minimum required to operate the ionizer. △ : Wires that are required to use the functions.

- : Wires that are not necessary with the sensing DC mode. These wires should not be short-circuited with other cables.

5.Air piping

When the piping is only connected to one port, the other unused port should be plugged with the M-5P that is packaged together with the ionizer.

20

Image 21
Contents Doc. No.IZ*-OMK0015 B IZS31 SeriesInstallation of Ionizer body ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ Safety instructions To 1.5 Nm InstallationWiring and piping Environment Installation Installation of Ionizer bodyAttached M4 threads M5 threads Intermediate bracketInstallation of sensor Installation of sensor headM3 screws Metal plate Function description Operation modeDetection of the dirt on the electrode needle See the selection of models and setting.Sensing DC mode .Selection and setting of equipmentOUT4 „ Connection with the power supply for I/O signal„ ION LED ・・・ The charged condition of the work is displayed „ Alarm LED ・・・ Failure of the ionizer is displayedTiming chart „ Timing chart with a normal operation AlarmAuto Manual Pulse DC mode„ Connection power supply for I/O signal Power supply cable forFunction Ionizer driveGoes out „ Alarm LED ・・・ Failure of the ionizer will be indicated(b)W/o auto balance sensor ② Auto operation.DC mode „ ION LED ・・・ The discharged ion polarity is displayed Power supply cable connection circuit PNP [Electrode cartridge quantity and weight] .Specifications.Ionizer 300 380 620 780 1100 1260 1500 1900 2300„ Sensor monitor output When feed back sensor is used .Sensor„ Detection range of Feedback sensor