Sierra Monitor Corporation IZS31 operation manual Power supply cable connection circuit

Page 23

4-4. Power supply cable connection circuit

NPN

Note) Because the sensor monitor output OUT4Dark Greenis not insulated from the internal circuit of the ionizer, It is grounded. (It is connected to FG).

22

Image 23
Contents Doc. No.IZ*-OMK0015 B IZS31 SeriesInstallation of Ionizer body ・・・・・・・・・・・・・・・・・・・・・・・・・・・・・ Safety instructions To 1.5 Nm InstallationWiring and piping Environment Attached M4 threads InstallationInstallation of Ionizer body M5 threads Intermediate bracketM3 screws Installation of sensorInstallation of sensor head Metal plate Function description Operation modeDetection of the dirt on the electrode needle See the selection of models and setting.Sensing DC mode .Selection and setting of equipmentOUT4 „ Connection with the power supply for I/O signal„ ION LED ・・・ The charged condition of the work is displayed „ Alarm LED ・・・ Failure of the ionizer is displayedTiming chart „ Timing chart with a normal operation AlarmAuto Manual Pulse DC modeIonizer drive Power supply cable for„ Connection power supply for I/O signal FunctionGoes out „ Alarm LED ・・・ Failure of the ionizer will be indicated(b)W/o auto balance sensor ② Auto operation.DC mode „ ION LED ・・・ The discharged ion polarity is displayed Power supply cable connection circuit PNP 300 380 620 780 1100 1260 1500 1900 2300 .Specifications[Electrode cartridge quantity and weight] .Ionizer„ Detection range of Feedback sensor „ Sensor monitor output When feed back sensor is used.Sensor