North Star 864 HH installation manual Minimum Framing Dimensions Top Vent Configuration

Page 13

Installation (for qualified installers only)

13

Minimum Framing Dimensions - Top Vent Configuration

Minimum 49” Fireplace

Enclosure Height

Route the

electrical line to

a position to the

left rear of the

fireplace.

38-1/2"

41-1/4"

20"

The on/off switch/thermostat wire (if used) should be routed to a location near the right front of the fireplace.

© Travis Industries

4070201

100-01182_002

Image 13
Contents 864 HH Fireplace Listing Details OverviewTable of Contents Safety Warnings Safety PrecautionsSafety Precautions Heating Specifications Installation OptionsDimensions Recommended Installation Procedure Installation OverviewPacking List Additional Items RequiredRequirements for the Commonwealth of Massachusetts Massachusetts RequirementsConverting Fireplace to Top Vent Configuration Top Vent or Rear Vent ConfigurationDo not Over Tighten Screws Converting the Fireplace to Top VentClearances Fireplace Placement RequirementsRaised Fireplaces Minimum 49 Fireplace Enclosure Height Minimum Framing Dimensions Rear Vent ConfigurationMinimum Framing Dimensions Top Vent Configuration Nailing Brackets Corner Installations Rear Vent Configuration Corner Installations Top Vent Configuration Fuel Gas Line RequirementsGas Line Connection Gas Inlet PressureLeft Side Gas Inlet preferred Gas Line LocationElectrical Connection required Wiring Diagram Millivolt System Wall Switch or Thermostat InstallationWall Switch Installation Vent Clearances Vent RequirementsAltitude Considerations Approved Vent Vent InstallationExhaust Restrictor Adjustment Approved Vent ConfigurationsRestrictor Position Intake Restrictor Adjustment Diffuser Side View Diffuser Plate AdjustmentExhaust Restrictor Removal 0feet 5feet 22 max Feet 10feet 15feet Rear Vent Configuration with Vertical Termination Feet 21 max 5feet 10feet 15feet Top Vent Configuration with Horizontal TerminationMay use 8 or 6-5/8 Diameter vent see page for Details Top Vent Configuration with Vertical TerminationTermination Requirements Floor Mounted Fireplaces Hearth RequirementsFacing Requirements Drywall InstallationFacing Overview Optional Faceplates Sizing ChartFront View Raised Fireplace with no Hearth Front View Thick Facing with Fireplace Xtrordinair FPX Arched Faces Floor-Mounted Fireplace with Hearth Thick Facing Installation SideMantel Requirements Side View Horizontal Termination Section Firestop Installation Example Build-In with Horizontal TerminationStarting the Pilot Flame Steps for Finalizing the InstallationPilot Flame Inspection Air Shutter Adjustment Finalizing the Installation for qualified installers onlyBased upon the face being used, either Glass Frame Removal and InstallationFinalizing the Installation for qualified installers only Fireback and Grate Installation Rear Log Installation Log Set InstallationRight Log Installation Left Log Installation Verify Rear LOG Position Right Twig InstallationFront Twigs Installation Center Twig InstallationEmber Installation LP Conversion Instructions Follow the directions below to replace the orifices Slotted Screwdriver Or T-20 Torx Upper Grill Installation Grill InstallationOption # 1 Remote Thermostat Remote Control Receiver Installation 2 OptionsOption # 2 Remote Thermostat New Wire Hook-Up Extra Room Power Heat Duct skuSpecial Instructions for 864 HH Length = Installation OverviewLength Duct Installation InstructionsFloor Mounting Attach the grill and wall adapter, if necessary Wiring Diagram -864TRV OFF Operating InstructionsAccent Light Installation sku Optional Equipment for qualified installers only Accent Light Operation Optional Wall-Mounted RheostatOptional Equipment for qualified installers only Index 68Index