North Star 864 HH Steps for Finalizing the Installation, Starting the Pilot Flame

Page 43

Finalizing the Installation (for qualified installers only)

43

Steps for Finalizing the Installation

1.Remove the glass (see page 45).

NOTE: If using propane (LP) convert the appliance prior to installing the logs.

2.We recommend you purge the gas line at this time (with the glass removed). This allows gas to be detected once it enters the firebox, ensuring gas does not build up.

3.Install the logs (see page 47).

4.Turn on the gas to the fireplace. Turn on gas to the heater. Leak test all gas joints prior to starting the appliance. Start the pilot.

Starting the Pilot Flame

WARNING: When lighting or re-lighting the pilot, the glass must be removed (see page 43).

aRemove the glass.

bPush the gas control knob in slightly and turn it to the "OFF" position. The knob will not turn from "ON" to "OFF" unless the knob is depressed slightly. Wait five minutes to let any gas that may have accumulated inside the firebox escape. If you smell leaking gas, follow the directions on the cover "IF YOU SMELL GAS".

cTurn the gas control knob to the "PILOT" position and press the knob in, this will allow gas to flow to the pilot light. Press the button on the pilot igniter repeatedly until you see the pilot light.

WARNING:

If the pilot does not light after 15 seconds, release the knob and call your dealer

 

for service. Do not attempt to light pilot until service has been performed.

NOTE:

 

You may wish to remove the log set to gain a better view of the pilot (see page 47).

dKeep the gas control knob depressed for 30 seconds once it is lit.

eRelease the gas control knob. If the pilot goes out, repeat step C. If the pilot refuses to stay lit, call your dealer for service. With the pilot lit, proceed to step “f”.

fReplace the glass.

gTurn the gas control knob counter-clockwise to "ON". The pilot is now lit and the heater can be turned on and off.

5. Check the pilot flame following the directions below.

Pilot Flame Inspection

The pilot flame should look like the illustration below. Adjust the pilot flame if necessary.

To adjust the pilot flame, turn this screw. Clockwise

The pilot flame must contact the thermocouple and

 

lowers the flame while counter-clockwise raises it.

thermopile (see the illustration below). Adjust the pilot up or

 

Standard

down as necessary.

Screwdriver

 

6.Replace the glass.

7.Start the main burner (the main burner circuit is detailed on page 20). Leak test all gas joints again.

© Travis Industries

4070201

100-01182_002

Image 43
Contents 864 HH Fireplace Listing Details OverviewTable of Contents Safety Warnings Safety PrecautionsSafety Precautions Heating Specifications Installation OptionsDimensions Additional Items Required Installation OverviewRecommended Installation Procedure Packing ListRequirements for the Commonwealth of Massachusetts Massachusetts RequirementsConverting Fireplace to Top Vent Configuration Top Vent or Rear Vent ConfigurationDo not Over Tighten Screws Converting the Fireplace to Top VentClearances Fireplace Placement RequirementsRaised Fireplaces Minimum 49 Fireplace Enclosure Height Minimum Framing Dimensions Rear Vent ConfigurationMinimum Framing Dimensions Top Vent Configuration Nailing Brackets Corner Installations Rear Vent Configuration Corner Installations Top Vent Configuration Gas Inlet Pressure Gas Line RequirementsFuel Gas Line ConnectionLeft Side Gas Inlet preferred Gas Line LocationElectrical Connection required Wiring Diagram Millivolt System Wall Switch or Thermostat InstallationWall Switch Installation Vent Clearances Vent RequirementsAltitude Considerations Approved Vent Vent InstallationExhaust Restrictor Adjustment Approved Vent ConfigurationsRestrictor Position Intake Restrictor Adjustment Diffuser Side View Diffuser Plate AdjustmentExhaust Restrictor Removal 0feet 5feet 22 max Feet 10feet 15feet Rear Vent Configuration with Vertical Termination Feet 21 max 5feet 10feet 15feet Top Vent Configuration with Horizontal TerminationMay use 8 or 6-5/8 Diameter vent see page for Details Top Vent Configuration with Vertical TerminationTermination Requirements Floor Mounted Fireplaces Hearth RequirementsFacing Requirements Drywall InstallationFacing Overview Optional Faceplates Sizing ChartFront View Raised Fireplace with no Hearth Front View Thick Facing with Fireplace Xtrordinair FPX Arched Faces Floor-Mounted Fireplace with Hearth Thick Facing Installation SideMantel Requirements Side View Horizontal Termination Section Firestop Installation Example Build-In with Horizontal TerminationStarting the Pilot Flame Steps for Finalizing the InstallationPilot Flame Inspection Air Shutter Adjustment Finalizing the Installation for qualified installers onlyBased upon the face being used, either Glass Frame Removal and InstallationFinalizing the Installation for qualified installers only Fireback and Grate Installation Rear Log Installation Log Set InstallationRight Log Installation Left Log Installation Verify Rear LOG Position Right Twig InstallationFront Twigs Installation Center Twig InstallationEmber Installation LP Conversion Instructions Follow the directions below to replace the orifices Slotted Screwdriver Or T-20 Torx Upper Grill Installation Grill InstallationOption # 1 Remote Thermostat Remote Control Receiver Installation 2 OptionsOption # 2 Remote Thermostat New Wire Hook-Up Extra Room Power Heat Duct skuSpecial Instructions for 864 HH Length = Installation OverviewLength Duct Installation InstructionsFloor Mounting Attach the grill and wall adapter, if necessary Wiring Diagram -864TRV OFF Operating InstructionsAccent Light Installation sku Optional Equipment for qualified installers only Accent Light Operation Optional Wall-Mounted RheostatOptional Equipment for qualified installers only Index 68Index