Table of Contents | 3 |
Introduction |
|
Overview | 2 |
Listing Details | 2 |
Safety Precautions |
|
Safety Precautions | 4 |
Features and Specifications |
|
Features | 6 |
Installation Options | 6 |
Heating Specifications | 6 |
Dimensions | 6 |
Installation |
|
Packing List | 7 |
Additional Items Required | 7 |
Installation Overview | 7 |
Recommended Installation Procedure | 7 |
Massachusetts Requirements | 8 |
Converting the Fireplace to Top Vent Configuration | 9 |
Fireplace Placement Requirements | 11 |
Clearances | 11 |
Raised Fireplaces | 11 |
Min. Framing Dims. - Rear Vent Configuration | 12 |
Min. Framing Dims. - Top Vent Configuration | 13 |
Nailing Brackets | 14 |
Corner Installations - Rear Vent Configuration | 15 |
Corner Installations - Top Vent Configuration | 16 |
Gas Line Requirements | 17 |
Fuel | 17 |
Gas Line Connection | 17 |
Gas Inlet Pressure | 17 |
Gas Line Location | 17 |
Electrical Connection (required) | 19 |
Wall Switch or Thermostat Installation | 20 |
Wiring Diagram (Millivolt System) | 20 |
Wall Switch Installation | 20 |
Vent Requirements | 21 |
Vent Clearances | 21 |
Altitude Considerations | 21 |
Approved Vent | 22 |
Vent Installation | 22 |
Approved Vent Configurations | 23 |
Restrictor Position | 23 |
Exhaust Restrictor Adjustment | 23 |
Intake Restrictor Adjustment | 24 |
Diffuser Plate Adjustment | 25 |
Rear Vent Config. W Horizontal Term. (no vertical rise) . 26 | |
Rear Vent Config. W Horizontal Term. (w vertical rise) ... | 27 |
Rear Vent Configuration with Vertical Termination | 28 |
Top Vent Configuration with Horizontal Termination | 29 |
Top Vent Configuration with Vertical Termination | 30 |
Termination Requirements | 31 |
Installation (continued) |
|
Hearth Requirements | 32 |
Facing Requirements | 33 |
Drywall Installation | 33 |
Facing Overview | 34 |
Optional Faceplates – Sizing Chart | 34 |
Thin Facing Installation | 35 |
Thick Facing Installation | 37 |
Thick Facing Installation with FPX Arched Faces | 38 |
Mantel Requirements | 40 |
Install Example - | 41 |
Install Example - | 42 |
Finalizing the Installation |
|
Steps for Finalizing the Installation | 43 |
Starting the Pilot Flame | 43 |
Pilot Flame Inspection | 43 |
Air Shutter Adjustment | 44 |
Glass Frame Removal and Installation | 45 |
Fireback and Grate Installation | 47 |
Log Set Installation | 48 |
LP Conversion Instructions | 52 |
Optional Equipment |
|
Grill Installation | 55 |
Remote Control Receiver Installation (2 Options) | 56 |
Extra Room Power Heat Duct | 57 |
Accent Light Installation (sku 94400100) | 64 |
Index |
|
Index | 68 |
© Travis Industries | 4070201 |