68Index
Index |
|
Additional Items Required | 7 |
Air Shutter Adjustment | 44 |
Altitude Considerations | 21 |
Approved Vent Configurations | 23 |
Approved Vent | 22 |
Clearances | 11 |
Converting the Fireplace to Top Vent Configuration | 9 |
Corner Installations - Rear Vent Configuration | 15 |
Corner Installations - Top Vent Configuration | 16 |
Diffuser Plate Adjustment | 25 |
Dimensions | 6 |
Drywall Installation | 33 |
Electrical Connection (required) | 19 |
Exhaust Restrictor Adjustment | 23 |
Facing Overview | 34 |
Facing Requirements | 33 |
Features | 6 |
Fireback and Grate Installation | 47 |
Fireplace Placement Requirements | 11 |
Fuel | 17 |
Gas Inlet Pressure | 17 |
Gas Line Connection | 17 |
Gas Line Location | 17 |
Gas Line Requirements | 17 |
Glass Frame Removal and Installation | 45 |
Grill Installation | 55 |
Hearth Requirements | 32 |
Heating Specifications | 6 |
Index | 68 |
Installation Example - | |
Installation Options | 6 |
Installation Overview | 7 |
Intake Restrictor Adjustment | 24 |
Listing Details | 2 |
LP Conversion Instructions | 47 |
Mantel Requirements | 40 |
Massachusetts Requirements | 8 |
Minimum Framing Dimensions - Rear Vent Configuration | 12 |
Minimum Framing Dimensions - Top Vent Configuration | 13 |
Nailing Brackets | 14 |
Overview | 2 |
Packing List | 7 |
Pilot Flame Inspection | 43 |
Extra Room Power Heat Duct | 57 |
Raised Fireplaces | 11 |
Rear Vent Configuration with Horizontal Termination (no vertical rise) | 26 |
Rear Vent Configuration with Horizontal Termination (with vertical rise) | 27 |
Rear Vent Configuration with Vertical Termination | 28 |
Recommended Installation Procedure | 7 |
Remote Control Receiver Installation (2 Options) | 56 |
Restrictor Position | 23 |
Safety Precautions | 4 |
Starting the Pilot Flame | 43 |
Steps for Finalizing the Installation | 43 |
Termination Requirements | 31 |
Thick Facing Installation with FPX Arched Faces | 38 |
Thick Facing Installation | 37 |
Thin Facing Installation | 35 |
Top Vent Configuration with Horizontal Termination | 29 |
Top Vent Configuration with Vertical Termination | 30 |
Vent Clearances | 21 |
Vent Installation | 22 |
Vent Requirements | 21 |
Wall Switch Installation | 20 |
Wall Switch or Thermostat Installation | 20 |
Wiring Diagram (Blower and Power Heat Duct) | 62 |
Wiring Diagram (Millivolt System) | 20 |
Travis Industries | 4070201 |