Vent Requirements

The gas appliance and vent system must be vented directly to the outside of the building, and never be attached to a chimney serving a separate solid fuel or gas-burning appliance. Each direct vent gas appliance must use it's own separate vent system.

In addition to the requirements listed here, follow the requirements provided with the vent.

A firestop is required whenever the vent penetrates a wall, floor, or ceiling (passes through framing members). Horizontal vent less than 48" above the fireplace must use the Travis Firestop (sku 93006094 - it incorporates a 3" clearance above, 1" clearance below and to the sides of the vent). Other penetrations only require a 1" clearance and may use a standard firestop (make sure the required 1" clearance is met).

Always use the high-wind termination (if available from the vent manufacturer).

Vent Clearances

The vent must maintain the required clearance to combustible materials to prevent a fire. Do not fill air spaces with insulation.

 

Before 48" Rise

After 48" Rise

Sides

1"

1"

Above

3"

1"

Below Horizontal or 45° Section

1"

1"

Vertical Termination

Use a roof flashing and storm collar whenever passing through the roof

Use a firestop whenever passing through a ceiling

Use a support box on exposed vent

Required Firestop

Min. 1"

Horizontal

Termination

Min. 3"

(1" if a minimum 48" above the fireplace)

Min. 1"

Min. 1"

Altitude Considerations

This heater has been tested at altitudes ranging from sea level to 6,000 feet. In this testing we have found that the heater, with its standard orifice, burns correctly with just an air shutter adjustment.

Failure to adjust the air shutter properly may lead to improper combustion which can create a safety hazard. Consult your dealer or installer if you suspect an improperly adjusted air shutter.

© Travis Industries

4070201

100-01182_002

Image 21
Contents 864 HH Fireplace Listing Details OverviewTable of Contents Safety Warnings Safety PrecautionsSafety Precautions Installation Options Heating SpecificationsDimensions Recommended Installation Procedure Installation OverviewPacking List Additional Items RequiredRequirements for the Commonwealth of Massachusetts Massachusetts RequirementsConverting Fireplace to Top Vent Configuration Top Vent or Rear Vent ConfigurationDo not Over Tighten Screws Converting the Fireplace to Top VentFireplace Placement Requirements ClearancesRaised Fireplaces Minimum 49 Fireplace Enclosure Height Minimum Framing Dimensions Rear Vent ConfigurationMinimum Framing Dimensions Top Vent Configuration Nailing Brackets Corner Installations Rear Vent Configuration Corner Installations Top Vent Configuration Fuel Gas Line RequirementsGas Line Connection Gas Inlet PressureLeft Side Gas Inlet preferred Gas Line LocationElectrical Connection required Wall Switch or Thermostat Installation Wiring Diagram Millivolt SystemWall Switch Installation Vent Requirements Vent ClearancesAltitude Considerations Approved Vent Vent InstallationApproved Vent Configurations Exhaust Restrictor AdjustmentRestrictor Position Intake Restrictor Adjustment Diffuser Side View Diffuser Plate AdjustmentExhaust Restrictor Removal 0feet 5feet 22 max Feet 10feet 15feet Rear Vent Configuration with Vertical Termination Feet 21 max 5feet 10feet 15feet Top Vent Configuration with Horizontal TerminationMay use 8 or 6-5/8 Diameter vent see page for Details Top Vent Configuration with Vertical TerminationTermination Requirements Floor Mounted Fireplaces Hearth RequirementsFacing Requirements Drywall InstallationFacing Overview Optional Faceplates Sizing ChartFront View Raised Fireplace with no Hearth Front View Thick Facing with Fireplace Xtrordinair FPX Arched Faces Floor-Mounted Fireplace with Hearth Thick Facing Installation SideMantel Requirements Side View Horizontal Termination Section Firestop Installation Example Build-In with Horizontal TerminationSteps for Finalizing the Installation Starting the Pilot FlamePilot Flame Inspection Air Shutter Adjustment Finalizing the Installation for qualified installers onlyBased upon the face being used, either Glass Frame Removal and InstallationFinalizing the Installation for qualified installers only Fireback and Grate Installation Log Set Installation Rear Log InstallationRight Log Installation Left Log Installation Verify Rear LOG Position Right Twig InstallationCenter Twig Installation Front Twigs InstallationEmber Installation LP Conversion Instructions Follow the directions below to replace the orifices Slotted Screwdriver Or T-20 Torx Upper Grill Installation Grill InstallationRemote Control Receiver Installation 2 Options Option # 1 Remote ThermostatOption # 2 Remote Thermostat Extra Room Power Heat Duct sku New Wire Hook-UpSpecial Instructions for 864 HH Length = Installation OverviewLength Duct Installation InstructionsFloor Mounting Attach the grill and wall adapter, if necessary Wiring Diagram -864TRV OFF Operating InstructionsAccent Light Installation sku Optional Equipment for qualified installers only Accent Light Operation Optional Wall-Mounted RheostatOptional Equipment for qualified installers only Index 68Index