Heatiator
BH60
manual
Troubleshooting
Specifications
Install
Error codes
Diagram
With a 2-wire hot air system
Warranty
Maintenance
#11 Feeder Assembly
Draft Test Procedure
Page 2
Page 1
Page 3
Image 2
Page 1
Page 3
Contents
Installation & Operating Manual
Bio-Flow BH60 Pellet Boiler
Page
BH60 Parts
Table of Contents
Options
Bulk Storage Hopper
Boiler Kit Materials Refer to
Installation
Preparation For Installation
Minimum non-combustible floor protection area
Minimum Clearances To Combustible Materials
Venting
Requirements for Terminating the Venting
Venting
Vent Pipe
Ventingti g
Venting Into An Existing Chimney
Venting Installation
Negative Pressure and Electrical Power Failure
Outside Air
Installation-Plumbing
Domestic HOT Water Zone
Boiler
Existing Controls and Safety Devices are
Extremely Important That this Boiler be
Existing Boiler
Example of Piping in Series with
AN Existing Operational Boiler
Associated Piping and Controls That should
InstallingInstallationDuct/Air-PlumbingConditioning
Dipswitch #6 must be on
Example of a Typical Forced HOT AIR Heating System
Installation With a Hot Air System
Splice
R1 Relay
Installation With a Hot Air System fan only capable
R2 Relay
With a 2-wire hot air system
Overheat Safety Zone
Connection with a wireless thermostat
Blue Violet
Test
Draft Test Procedure
Low Draft Adjustment Pot High altitude kit #1-00-232059
Draft
Operation
Status light error messages
Explanation and Importance of the OverHeat Safety Zone
Control Board Operation
Pellet Boiler Outdoor Air Reset Operation
Turn Mode Selector to OFF
Clean Burnpot with scraper
Flip the Igniter Switch up into the Auto position
MAX. Temp
Lighting a Fire Manually
Type of Fuel
Operation
Burnp ot
Maintenance
Cleanout cover
Fines area Feeder cover Fig
Open The Firebox Door
Inner Refractory Lining
Ash Removal
Cleaning
Firebox Baffle Removal
Combustion Blower Cleaning
Boiler Must be OFF at the circuit breaker,
Special Insructions/ Power Failure
To Normal Heating Demand
Fuel
Troubleshooting
Helpful Hints
Electrical VAC 60 Hz
Specifications
BTU Input Range= 0, and 9350 to 60,000
PIN
Diagram
Plug
Warranty
ECO-CHOICE Limited Warranty
Testing Label
EFE
Bh105
Bh60
Stocked
#11 Feeder Assembly
Page
Quick Reference Auto-Light
Signature of Boxer
Top
Page
Image
Contents