Heatiator
BH60
manual
Troubleshooting
Specifications
Install
Error codes
Diagram
With a 2-wire hot air system
Warranty
Maintenance
#11 Feeder Assembly
Draft Test Procedure
Page 47
Notes
Page 46
Page 48
Image 47
Page 46
Page 48
Contents
Bio-Flow BH60 Pellet Boiler
Installation & Operating Manual
Page
BH60 Parts
Table of Contents
Bulk Storage Hopper
Options
Boiler Kit Materials Refer to
Installation
Preparation For Installation
Minimum non-combustible floor protection area
Minimum Clearances To Combustible Materials
Requirements for Terminating the Venting
Venting
Vent Pipe
Venting
Venting Into An Existing Chimney
Ventingti g
Venting Installation
Outside Air
Negative Pressure and Electrical Power Failure
Domestic HOT Water Zone
Installation-Plumbing
Boiler
Existing Controls and Safety Devices are
Extremely Important That this Boiler be
Associated Piping and Controls That should
Example of Piping in Series with
AN Existing Operational Boiler
Existing Boiler
InstallingInstallationDuct/Air-PlumbingConditioning
Dipswitch #6 must be on
Example of a Typical Forced HOT AIR Heating System
Installation With a Hot Air System
R1 Relay
Splice
R2 Relay
Installation With a Hot Air System fan only capable
Overheat Safety Zone
With a 2-wire hot air system
Blue Violet
Connection with a wireless thermostat
Draft
Draft Test Procedure
Low Draft Adjustment Pot High altitude kit #1-00-232059
Test
Operation
Status light error messages
Explanation and Importance of the OverHeat Safety Zone
Control Board Operation
Pellet Boiler Outdoor Air Reset Operation
Clean Burnpot with scraper
Turn Mode Selector to OFF
MAX. Temp
Flip the Igniter Switch up into the Auto position
Type of Fuel
Lighting a Fire Manually
Operation
Fines area Feeder cover Fig
Maintenance
Cleanout cover
Burnp ot
Open The Firebox Door
Inner Refractory Lining
Ash Removal
Firebox Baffle Removal
Cleaning
Boiler Must be OFF at the circuit breaker,
Combustion Blower Cleaning
To Normal Heating Demand
Special Insructions/ Power Failure
Fuel
Troubleshooting
Helpful Hints
Electrical VAC 60 Hz
Specifications
BTU Input Range= 0, and 9350 to 60,000
PIN
Diagram
Plug
ECO-CHOICE Limited Warranty
Warranty
EFE
Testing Label
Bh105
Bh60
Stocked
#11 Feeder Assembly
Page
Quick Reference Auto-Light
Signature of Boxer
Top
Page
Image
Contents