Heatiator BH60 manual Operation

Page 32

Operation

Fig. 15

NOTE: Stirring the starting gel into the pellets usually allows the fire to become established quicker.

CAUTION: A vapor flash could occur if too much time is allowed to pass before lighting the starting gel.

CAUTION: Care must be taken not to get starting gel on your hands or clothing. Serious burns could occur during the lighting process.

CAUTION: Never try to apply more starting gel to an already burning fire, or a fire with smoldering pellets.

“NEVER USE GASOLINE, GASOLINE-TYPE LANTERN FUEL, KEROSENE, CHARCOAL LIGHTER FLUID, OR SIMILAR LIQUIDS TO START OR “FRESHEN UP “ A FIRE IN THIS BOILER. KEEP ALL SUCH LIQUIDS WELL AWAY FROM THE UNIT WHILE IN USE”.

Fig. 16

11. Apply starting gel as shown in Fig.15

12.Light The Starting Gel With A Match.

13.Close The Doors

The fire will light and the control will adjust the rate of burn to the proper level, according to the MAX TEMP dial setting.

NOTICE: When burning the boiler in the manual ignition mode, there must be an overheat dump zone incorporated into the plumbing system.

If heating demand stops during manual operation, the control will take the unit to low burn. If no heat is used during this time, the water temperature may continue to rise to the point at which the feeder will be turned off and the fire will go out. This will require a manual re-start of the system. (see page 26 “7 Blinks”)

Solid-fuel burning appliances need to be cleaned frequently because soot, creosote, and ash may accumulate. If you suspect a chimney/vent pipe fire do the following:

1.Call the fire department.

2.Remove fuel from the burn pot using the burnpot scraping tool to scrape the pellets into the ash pan.

3.Remove the ash pan from the unit and take outside. Do not place the ash pan on a combustible material.

4.Turn off circuit breaker at unit.

5.Do not use the unit until a qualified person has inspected your appliance and venting.

32

Image 32
Contents Installation & Operating Manual Bio-Flow BH60 Pellet BoilerPage BH60 Parts Table of Contents Options Bulk Storage HopperBoiler Kit Materials Refer to InstallationPreparation For Installation Minimum non-combustible floor protection area Minimum Clearances To Combustible Materials Venting Requirements for Terminating the VentingVenting Vent PipeVentingti g Venting Into An Existing ChimneyVenting Installation Negative Pressure and Electrical Power Failure Outside AirInstallation-Plumbing Domestic HOT Water ZoneBoiler Existing Controls and Safety Devices areExtremely Important That this Boiler be Example of Piping in Series with AN Existing Operational BoilerExisting Boiler Associated Piping and Controls That shouldInstallingInstallationDuct/Air-PlumbingConditioning Dipswitch #6 must be on Example of a Typical Forced HOT AIR Heating System Installation With a Hot Air System Splice R1 RelayInstallation With a Hot Air System fan only capable R2 RelayWith a 2-wire hot air system Overheat Safety ZoneConnection with a wireless thermostat Blue VioletDraft Test Procedure Low Draft Adjustment Pot High altitude kit #1-00-232059Test DraftOperation Status light error messagesExplanation and Importance of the OverHeat Safety Zone Control Board Operation Pellet Boiler Outdoor Air Reset Operation Turn Mode Selector to OFF Clean Burnpot with scraperFlip the Igniter Switch up into the Auto position MAX. TempLighting a Fire Manually Type of FuelOperation Maintenance Cleanout coverBurnp ot Fines area Feeder cover FigOpen The Firebox Door Inner Refractory LiningAsh Removal Cleaning Firebox Baffle RemovalCombustion Blower Cleaning Boiler Must be OFF at the circuit breaker,Special Insructions/ Power Failure To Normal Heating DemandFuel TroubleshootingHelpful Hints Electrical VAC 60 Hz SpecificationsBTU Input Range= 0, and 9350 to 60,000 PIN DiagramPlug Warranty ECO-CHOICE Limited WarrantyTesting Label EFEBh105 Bh60 Stocked #11 Feeder Assembly Page Quick Reference Auto-Light Signature of Boxer