Heatiator BH60 manual With a 2-wire hot air system, Overheat Safety Zone

Page 23

23

OVERHEAT SAFETY ZONE

With this wiring schematic, the overheat

control will energize the circulator but not the fan relay.The existing fan control

New T'stat

Existing T'stat

EXISTING BURNER / FAN SYSTEM

( GAS, OIL, ELECTRIC)

Existing T'stat Wire

Connection

will power the fan on temperature rise.

LOW VOLTAGE 24 VAC COIL

( by installer )

 

 

 

 

8

 

7

 

 

 

 

HIGH VOLTAGE ( L1 )

L

 

6 5

 

( by installer )

 

 

4

3

 

N

 

 

 

1

 

 

 

 

R2 RELAY

 

 

 

 

Grainger#2XC01

( by installer )

 

to circulator outlet

factory wiring

Omron LY2F 24V

HIGH VOLTAGE ( N )

 

 

 

 

 

 

HIGH VOLTAGE ( ORANGE)

 

 

from the control

 

8

7

SPLICE

( by installer )

 

 

6

5

 

 

 

 

 

 

 

 

4

3

 

 

 

 

 

1

 

 

 

 

R1 RELAY

 

 

 

 

Grainger#2XC02

INSIDE the CONTROL

 

 

Omron LY2F 120V

 

 

EXISTING HEAT CONTROL WIRING

 

New T'stat Wire

120 VAC FAN WIRING

 

( by installer )

New T'stat Wire

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

( by installer )

 

ENLARGED VIEW

through grommet

 

 

 

 

 

to fan control

 

 

 

 

 

Hot

Return

G

R

C

 

Hot

 

 

 

24 VAC

 

 

 

 

input 120 VAC

 

 

 

 

 

 

 

 

 

 

 

Neut

 

120 VAC

 

 

Neut

 

 

 

Hot

 

N.O. CONTACT

Return

 

Return

 

 

 

 

Neut

 

 

J BOX MOUNTED RELAY

 

Hot

 

WHITE ROGERS # 90-113

 

 

 

 

 

HONEYWELL # R8285A1048

 

to fan motor

 

 

 

 

 

 

( GAS, OIL, ELECTRIC)

EXISTING BURNER / FAN

 

SYSTEM

with a 2-wire hot air system

Image 23
Contents Bio-Flow BH60 Pellet Boiler Installation & Operating ManualPage BH60 Parts Table of Contents Bulk Storage Hopper OptionsBoiler Kit Materials Refer to InstallationPreparation For Installation Minimum non-combustible floor protection area Minimum Clearances To Combustible Materials Requirements for Terminating the Venting VentingVent Pipe VentingVenting Into An Existing Chimney Ventingti gVenting Installation Outside Air Negative Pressure and Electrical Power FailureDomestic HOT Water Zone Installation-PlumbingBoiler Existing Controls and Safety Devices areExtremely Important That this Boiler be Associated Piping and Controls That should Example of Piping in Series withAN Existing Operational Boiler Existing BoilerInstallingInstallationDuct/Air-PlumbingConditioning Dipswitch #6 must be on Example of a Typical Forced HOT AIR Heating System Installation With a Hot Air System R1 Relay SpliceR2 Relay Installation With a Hot Air System fan only capableOverheat Safety Zone With a 2-wire hot air systemBlue Violet Connection with a wireless thermostatDraft Draft Test ProcedureLow Draft Adjustment Pot High altitude kit #1-00-232059 TestOperation Status light error messagesExplanation and Importance of the OverHeat Safety Zone Control Board Operation Pellet Boiler Outdoor Air Reset Operation Clean Burnpot with scraper Turn Mode Selector to OFFMAX. Temp Flip the Igniter Switch up into the Auto positionType of Fuel Lighting a Fire ManuallyOperation Fines area Feeder cover Fig MaintenanceCleanout cover Burnp otOpen The Firebox Door Inner Refractory LiningAsh Removal Firebox Baffle Removal CleaningBoiler Must be OFF at the circuit breaker, Combustion Blower CleaningTo Normal Heating Demand Special Insructions/ Power FailureFuel TroubleshootingHelpful Hints Electrical VAC 60 Hz SpecificationsBTU Input Range= 0, and 9350 to 60,000 PIN DiagramPlug ECO-CHOICE Limited Warranty WarrantyEFE Testing LabelBh105 Bh60 Stocked #11 Feeder Assembly Page Quick Reference Auto-Light Signature of Boxer