Installation
Draft |
|
Testing Port | Fig. 9 |
|
“Test”
Low Draft
Adjustment Pot
Fig. 10
High altitude kit #1-00-232059.
Install this ring to increase draft in higher altitude installation locations.
T
Draft Test Procedure
After the venting is completed, the firebox draft will need to be checked and possibly adjusted. After removing the plug bolt from the draft hole (3/16” hex key wrench) shown in Fig. 9, insert the draft meter tube. The hopper lid must be latched during this test. (It is recommended that the draft meter have a scale of 0 to 1” WC.)
Turn the feed adjuster to “Test”. this will start the combustion blower and allow you to check and record the High Draft ______ - IWC date _______ The
maximum draft allowed is
After the first 60 seconds the “Test” mode lowers the combustion blower voltage to the Low Burn voltage. During this lowered voltage cycle, the Low Draft must be checked and adjusted if necessary. The recommended low draft setting should be between
There is a low draft voltage adjustment screw located through the small hole to the right of the Igniter Light. See Fig. 10. Adjusted Low Draft is __________
To increase the draft in higher altitudes, kit #
Don’t forget to turn the feed adjuster off of “Test”, and reinstall the draft test plug bolt into the boiler.
CAUTION: Hot While In Operation. Do Not Touch. Keep Children, Clothing And Furniture Away. Contact May Cause Skin Burns. See Nameplate And Instructions.
WARNING: Keep Doors Closed During Operation.
WARNING: Do Not Store Fuel or Other Combustible Material Within Installation Clearance Area.
WARNING: Risk of Fire - Do Not Operate With the Flue Draft Exceeding