Heatiator BH60 manual Minimum Clearances To Combustible Materials

Page 8

Installation

C

B

 

A

 

D

Minimum Clearances To Combustible Materials

 

Sidewall To Appliance

A

6”

(152 mm)

Mur Latéral à l’Appareil

 

Backwall To Appliance

B

6”

(152 mm)

Mur Arrière à l’Appareil

 

 

 

 

 

 

 

Stove Top To Ceiling

C

16” (406 mm)

Haut du Poêle au Plafond

 

 

Stove Front To Combustibles D

48”

(1219 mm)

Des Combustibles au Devant du Poêle

 

Combustibles To Pellet Vent

3” (76 mm)

Matériaux Combustibles au Conduit de Fumée

 

Minimum Alcove Height

72”

(1829 mm)

Hauteur de l’Alcôve

 

 

 

 

 

 

Minimum Alcove Width

48”

(1219 mm)

Largeur de l’Alcôve

 

 

 

 

 

 

 

Minimum Alcove Depth

60”

(1524 mm)

Profondeur de l’Alcôve

 

 

 

 

 

 

 

WARNING! RISK OF FIRE! Hearth & Home Technologies disclaims any responsibility for, and the warranty and agency listing will be voided by the following actions:

DO NOT:

Install or operate a damaged appliance

Modify the appliance

Install other than as instructed by Hearth & Home Technologies

Operate the appliance without fully assembling all components

Overfire the appliance

Install any component or part not approved by Hearth & Home Technologies

Improper installation, adjustment, alteration, service, or maintenance can cause injury or property damage. For assistance or additional information, consult a qualified installer, service agency or your dealer.

8

Image 8
Contents Installation & Operating Manual Bio-Flow BH60 Pellet BoilerPage BH60 Parts Table of Contents Options Bulk Storage HopperBoiler Kit Materials Refer to InstallationPreparation For Installation Minimum non-combustible floor protection area Minimum Clearances To Combustible Materials Venting Requirements for Terminating the VentingVenting Vent PipeVentingti g Venting Into An Existing ChimneyVenting Installation Negative Pressure and Electrical Power Failure Outside AirInstallation-Plumbing Domestic HOT Water ZoneBoiler Existing Controls and Safety Devices areExtremely Important That this Boiler be Example of Piping in Series with AN Existing Operational BoilerExisting Boiler Associated Piping and Controls That shouldInstallingInstallationDuct/Air-PlumbingConditioning Dipswitch #6 must be on Example of a Typical Forced HOT AIR Heating System Installation With a Hot Air System Splice R1 RelayInstallation With a Hot Air System fan only capable R2 RelayWith a 2-wire hot air system Overheat Safety ZoneConnection with a wireless thermostat Blue VioletDraft Test Procedure Low Draft Adjustment Pot High altitude kit #1-00-232059Test DraftOperation Status light error messagesExplanation and Importance of the OverHeat Safety Zone Control Board Operation Pellet Boiler Outdoor Air Reset Operation Turn Mode Selector to OFF Clean Burnpot with scraperFlip the Igniter Switch up into the Auto position MAX. TempLighting a Fire Manually Type of FuelOperation Maintenance Cleanout coverBurnp ot Fines area Feeder cover FigOpen The Firebox Door Inner Refractory LiningAsh Removal Cleaning Firebox Baffle RemovalCombustion Blower Cleaning Boiler Must be OFF at the circuit breaker,Special Insructions/ Power Failure To Normal Heating DemandFuel TroubleshootingHelpful Hints Electrical VAC 60 Hz SpecificationsBTU Input Range= 0, and 9350 to 60,000 PIN DiagramPlug Warranty ECO-CHOICE Limited WarrantyTesting Label EFEBh105 Bh60 Stocked #11 Feeder Assembly Page Quick Reference Auto-Light Signature of Boxer