Heatiator BH60 manual Bh105

Page 43

Service Parts

bh105

 

 

bioflow hydronic 105k Pellet boiler

beginning manufacturing date: july 2009

Ending manufacturing date: Active

 

1

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

3

28

27

 

 

 

 

 

 

 

 

 

 

 

 

4

 

26

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

6

 

25

24

23

 

22

 

 

 

 

 

21

 

 

 

 

 

7

 

 

 

 

 

 

8

 

 

 

 

 

20

 

9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

 

 

 

19

 

 

11

 

 

 

 

 

 

 

 

 

 

 

 

 

12

 

 

 

 

 

 

 

 

 

 

 

 

18

 

 

13

 

14

 

 

 

 

 

 

 

 

15

 

17

 

 

 

 

 

 

16

 

 

 

 

 

 

 

IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement

 

Stocked

parts for your appliance please provide model number and serial number. All parts listed

 

in this manual may be ordered from an authorized dealer.

 

 

at depot

ITEm

dESCrIPTION

COmmENTS

PArT NumbEr

 

1

Hopper Assembly

 

1-10-72140A

 

 

Gasket, Hopper Throat

 

3-44-677185

Y

 

Hopper Lid Spring Latch

 

3-31-00927

Y

2

Control Board Plate, Studded w/label

 

1-10-07330

 

3

Control Board

 

1-00-06143

Y

 

Control Knob/Shaft

25 Sets

1-00-015605

Y

 

Fuse, 6 AMP

Pkg of 5

3-20-49447-5

Y

4

Feeder Cover Assembly

 

2-00-72158B

 

5

Differential Switch

 

3-20-6866

Y

6

Red Nylon Knob

 

3-31-72196

 

7

Swing Plate Assembly

 

1-10-72153A

 

Additional service part numbers appear on following page.

04/12

Image 43
Contents Bio-Flow BH60 Pellet Boiler Installation & Operating ManualPage BH60 Parts Table of Contents Bulk Storage Hopper OptionsPreparation For Installation InstallationBoiler Kit Materials Refer to Minimum non-combustible floor protection area Minimum Clearances To Combustible Materials Requirements for Terminating the Venting VentingVent Pipe VentingVenting Into An Existing Chimney Ventingti gVenting Installation Outside Air Negative Pressure and Electrical Power FailureDomestic HOT Water Zone Installation-PlumbingExtremely Important That this Boiler be Existing Controls and Safety Devices areBoiler Associated Piping and Controls That should Example of Piping in Series withAN Existing Operational Boiler Existing BoilerInstallingInstallationDuct/Air-PlumbingConditioning Dipswitch #6 must be on Example of a Typical Forced HOT AIR Heating System Installation With a Hot Air System R1 Relay SpliceR2 Relay Installation With a Hot Air System fan only capableOverheat Safety Zone With a 2-wire hot air systemBlue Violet Connection with a wireless thermostatDraft Draft Test ProcedureLow Draft Adjustment Pot High altitude kit #1-00-232059 TestExplanation and Importance of the OverHeat Safety Zone Status light error messagesOperation Control Board Operation Pellet Boiler Outdoor Air Reset Operation Clean Burnpot with scraper Turn Mode Selector to OFFMAX. Temp Flip the Igniter Switch up into the Auto positionType of Fuel Lighting a Fire ManuallyOperation Fines area Feeder cover Fig MaintenanceCleanout cover Burnp otAsh Removal Inner Refractory LiningOpen The Firebox Door Firebox Baffle Removal CleaningBoiler Must be OFF at the circuit breaker, Combustion Blower CleaningTo Normal Heating Demand Special Insructions/ Power FailureHelpful Hints TroubleshootingFuel BTU Input Range= 0, and 9350 to 60,000 SpecificationsElectrical VAC 60 Hz Plug Diagram PIN ECO-CHOICE Limited Warranty WarrantyEFE Testing LabelBh105 Bh60 Stocked #11 Feeder Assembly Page Quick Reference Auto-Light Signature of Boxer