Crestron electronic 1.5, 3.5, 2.5 Vertical direct venting, Vent/air termination vertical

Page 19

3 Vertical direct venting

Vent/air termination – vertical

￿WARNING Follow instructions below when determining vent location to avoid possibility of severe

personal injury, death or substantial property damage.

Installation & Operation Manual

Figure 3-2Vertical Termination of Air and Vent w/Rain Cap

￿WARNING Do not connect any other appliance to the vent pipe or multiple boilers to a common

vent pipe except as noted in Section 2 on page 18. Failure to comply could result in severe personal injury, death, or substantial property damage.

NOTICE

Installation must comply with local

requirements and with the National Fuel

 

 

Gas Code, NFPA 54 / ANSI Z223.1 - latest

 

edition for U.S. installations or CSA B149.1

 

Installation Code for Canadian installations.

Determine location

VENT OUTLET

36" [914 MM] MINIMUM ABOVE AIR INLET

BIRD SCREEN [TYPICAL]

12" [305 MM] MINIMUM ABOVE ROOF / SNOW LINE

Locate the vent/air terminations using the following guidelines:

1.The total length of piping for vent or air must not exceed the limits given in the General Venting Section on page 17 of this manual.

2.The vent must terminate at least 3 feet above the highest place in which the vent penetrates the roof and at least 2 feet above any part of a building within 10 horizontal feet.

3.The air piping must terminate in a down-turned 180° return pipe no further than 2 feet (.6 m) from the center of the vent pipe. This placement avoids recirculation of flue products into the combustion air stream.

4.The vent piping must terminate in an up-turned coupling as shown in FIG. 3-1. The top of the coupling or the rain cap must be at least 36" (914 mm) above the air intake. The air inlet pipe and vent pipe can be located in any desired position on the roof, but must always be no further than 2 feet (.6 m) apart and with the vent termination at least 36" (914 mm) above the air intake.

￿WARNING Rooftop vent and air inlet terminations must terminate in the same pressure zone,

unless vertical vent sidewall air is set up as shown in the General Venting - Vertical Vent, Sidewall Air Section.

Figure 3-1Vertical Termination of Air and Vent

 

BIRD SCREEN

 

[TYPICAL]

VENT OUTLET

VENT

 

36" MINIMUM

12" [305 MM] MINIMUM

ABOVE AIR INLET

ABOVE ROOF /

 

 

SNOW LINE

 

COMBUSTION AIR

5.Locate terminations so they are not likely to be damaged by foreign objects, such as stones or balls, or subject to buildup of leaves or sediment.

Prepare roof penetrations

1.Air pipe penetration:

a.Cut a hole for the air pipe. Size the air pipe hole as close as desired to the air pipe outside diameter.

2.Vent pipe penetration:

a.Cut a hole for the vent pipe. For either combustible or noncombustible construction, size the vent pipe hole per the vent manufacturer’s instructions.

b.Insert a galvanized metal thimble in the vent pipe hole (when required by local codes).

3.Space the air and vent holes to provide the minimum spacing shown in FIG. 3-1.

4.Follow all local codes for isolation of vent pipe when passing through floors, ceilings, and roofs.

5.Provide flashing and sealing boots sized for the vent pipe and air pipe.

Termination and fittings

1.Prepare the vent termination coupling and the air termination elbow (FIG. 3-1) by inserting bird screens. Bird screens should be obtained locally.

2.The air piping must terminate in a down-turned 180° return bend as shown in FIG. 3-1. Locate the air inlet pipe no further than 2 feet (.6 m) from the center of the vent pipe. This placement avoids recirculation of flue products into the combustion air stream.

19

Image 19
Contents Save this manual for future reference Contents Please read before proceeding When servicing boilerBlowers Crest How it worksCrest How it works Models 1.5 2.0 2.5 3.0 Crest Ahri Rating RatingsProvide clearances Installation must comply withDetermine boiler location Before locating the boiler, checkPrevent combustion air contamination Provide air openings to roomFlooring and foundation Vent and air pipingProducts to avoid When using an existing vent system to install a new boilerAreas likely to have contaminants When removing a boiler from existing common vent system Remove boiler from wood pallet 7Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room Direct venting General ventingOptional room air Air inlet pipe materials Install vent and combustion air pipingAir intake/vent connections Approved Stainless Steel Vent Manufacturers Make ModelRemoving from existing vent Common venting Prepare roof penetrations Vertical direct ventingVent/air termination vertical Determine location4Alternate Vertical Terminations with Multiple Boilers Multiple vent/air terminationsVent/air termination sidewall Sidewall direct venting2Clearance to Doors and Windows Prepare wall penetrations4Multiple Vent Terminations must also comply with Figure Room airHydronic piping Model Circulator sizing20F 40F 60F Near boiler piping components System Multiple Boilers Common Header Primary / Secondary Flow For all equipment and detailing required by local codes Hydronic piping Gas connections Connecting gas supply pipingModel Gas Inlet Size Propane Gas Natural gasCheck inlet gas supply GAS Piping Size ChartGas Pressure Gas valve replacementInstallation must comply with Field wiringLine voltage connections Low voltage connections EnableOutdoor temperature sensor Louver proving switchSystem supply sensor Auxiliary switch 1Alarm contacts Wiring of the cascadeField WiringCondensate drain Condensate disposalFill and test water system Freeze protection when usedStart-up Check/control water chemistryInspect/check condensate lines and fittings Check for gas leaksCheck thermostat circuits Inspect condensate systemCheck system and boiler Final checks before starting the boilerStart the boiler If boiler does not start correctlyFor Your Safety Read Before Operating Gas Natural Gas Propane Valve Set space heating operationConfiguration of the cascade Verify HWG circulator mode Set HWG target temperatureSet clock General Operating informationProtection features Outdoor reset operation, if used Boiler temperature regulationCascade Sequence of operation Home Screen Crest control module2Main Menu Screen See the Crest User’s Information Manual for Instructions Maintenance Maintenance and annual startupService technician Owner maintenanceMaintenance Check boiler relief valve Flue vent system and air pipingCheck water system Check expansion tankCheck flame signal Check ignition ground wiringCheck all boiler wiring Check control settingsNiosh stated First Aid Cleaning boiler heat exchangerReview with owner Handling ceramic fiber materialsIntegrated Control Diagrams2Wiring Diagram