Crestron electronic 3.5, 2.5, 1.5 Final checks before starting the boiler, Start the boiler

Page 42

9 Start-up

Final checks before starting the boiler

Read the Crest Service Manual to familiarize yourself with SMART TOUCH control module operation. Read this manual, page 43 for proper steps to start boiler.

Verify the boiler and system are full of water and all system components are correctly set for operation.

Verify the preparation procedures of Section 9, pages 40 and 41 have been completed.

Verify electrical connections are correct and securely attached.

Inspect vent piping and air piping for signs of deterioration from corrosion, physical damage or sagging. Verify air piping and vent piping are intact and correctly installed per this manual.

Start the boiler

1.Read and follow the Operating instructions in FIG. 9-2, page 43.

If boiler does not start correctly

1.Check for loose connections, blown fuse or service switch off?

2.Is external limit control (if used) open? Is boiler water temperature above 200°F (93°C)?

3.Is the boiler receiving a call for heat?

4.Is gas turned on at meter and boiler?

5.Is incoming gas pressure less than 4 inches w.c. (.99 kPa)?

If none of the above corrects the problem, refer to the Troubleshooting Section of the Crest Service Manual.

Check system and boiler

Check water piping

1.Check system piping for leaks. If found, shut down the boiler and repair immediately. (See WARNINGS on pages 40 and 41 (startup) regarding failure to repair leaks.)

2.Vent any remaining air from the system using manual vents. Air in the system will interfere with circulation and cause heat distribution problems and noise.

Installation & Operation Manual

Check vent piping and air piping

1.Check for gastight seal at every connection, seam of air piping, and vent piping.

￿WARNING Venting system must be sealed gastight to prevent flue gas spillage and carbon

monoxide emissions, which will result in severe personal injury or death.

Check gas piping

1.Check around the boiler for gas odor following the procedure on page 31 of this manual (connecting gas supply piping).

￿WARNING If you discover evidence of any gas leak, shut down the boiler at once. Find the

leak source with a bubble test and repair immediately. Do not start the boiler again until corrected. Failure to comply could result in severe personal injury, death, or substantial property damage.

Check flame and combustion

NOTICE

For dual fuel models, reference the Crest

Dual Fuel Supplemental Manual.

 

1.Turn the main power off to the boiler by placing the “On/Off” switch in the OFF position.

2.Remove the flue temperature sensor from the flue collector. Note: Combustion measurements will be made at this point.

3.Turn the main power on to the boiler by placing the “On/Off” switch in the ON position.

42

Image 42
Contents Save this manual for future reference Contents When servicing boiler Please read before proceedingCrest How it works BlowersCrest How it works Models 1.5 2.0 2.5 3.0 Ratings Crest Ahri RatingBefore locating the boiler, check Installation must comply withDetermine boiler location Provide clearancesVent and air piping Provide air openings to roomFlooring and foundation Prevent combustion air contaminationWhen using an existing vent system to install a new boiler Products to avoidAreas likely to have contaminants When removing a boiler from existing common vent system Remove boiler from wood pallet 7Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room General venting Direct ventingOptional room air Install vent and combustion air piping Air inlet pipe materialsApproved Stainless Steel Vent Manufacturers Make Model Air intake/vent connectionsRemoving from existing vent Common venting Determine location Vertical direct ventingVent/air termination vertical Prepare roof penetrationsMultiple vent/air terminations 4Alternate Vertical Terminations with Multiple BoilersSidewall direct venting Vent/air termination sidewallPrepare wall penetrations 2Clearance to Doors and WindowsRoom air 4Multiple Vent Terminations must also comply with FigureHydronic piping Circulator sizing Model20F 40F 60F Near boiler piping components System Multiple Boilers Common Header Primary / Secondary Flow For all equipment and detailing required by local codes Hydronic piping Connecting gas supply piping Gas connectionsModel Gas Inlet Size Natural gas Propane GasGAS Piping Size Chart Check inlet gas supplyGas valve replacement Gas PressureField wiring Installation must comply withLine voltage connections Louver proving switch EnableOutdoor temperature sensor Low voltage connectionsWiring of the cascade Auxiliary switch 1Alarm contacts System supply sensorWiring FieldCondensate disposal Condensate drainCheck/control water chemistry Freeze protection when usedStart-up Fill and test water systemInspect condensate system Check for gas leaksCheck thermostat circuits Inspect/check condensate lines and fittingsIf boiler does not start correctly Final checks before starting the boilerStart the boiler Check system and boilerFor Your Safety Read Before Operating Set space heating operation Gas Natural Gas Propane ValveVerify HWG circulator mode Set HWG target temperature Configuration of the cascadeSet clock Operating information GeneralProtection features Boiler temperature regulation Outdoor reset operation, if usedCascade Sequence of operation Crest control module Home Screen2Main Menu Screen Owner maintenance Maintenance Maintenance and annual startupService technician See the Crest User’s Information Manual for InstructionsMaintenance Check expansion tank Flue vent system and air pipingCheck water system Check boiler relief valveCheck control settings Check ignition ground wiringCheck all boiler wiring Check flame signalHandling ceramic fiber materials Cleaning boiler heat exchangerReview with owner Niosh stated First AidDiagrams Integrated Control2Wiring Diagram