11 Maintenance (continued)

Installation & Operation Manual

Flue vent system and air piping

1.Visually inspect the entire flue gas venting system and air piping for blockage, deterioration or leakage. Repair any joints that show signs of leakage. Verify that air inlet pipe is connected and properly sealed.

2.Verify that boiler vent discharge and air intake are clean and free of obstructions.

￿WARNING Failure to inspect for the above conditions and have them repaired can result in

severe personal injury or death.

Check water system

1.Verify all system components are correctly installed and operational.

2.Check the cold fill pressure for the system. Verify it is correct (must be a minimum of 12 psi (82.7 kPa)).

3.Watch the system pressure as the boiler heats up (during testing) to ensure pressure does not rise too high. Excessive pressure rise indicates expansion tank sizing or performance problem.

4.Inspect automatic air vents and air separators. Remove air vent caps and briefly press push valve to flush vent. Replace caps. Make sure vents do not leak. Replace any leaking vents.

Check expansion tank

1.Expansion tanks provide space for water to move in and out as the heating system water expands due to temperature increase or contracts as the water cools. Tanks may be open, closed or diaphragm or bladder type. See Section 5 - Hydronic Piping for suggested best location of expansion tanks and air eliminators.

￿WARNING

￿WARNING

Safety relief valves should be re-inspected

AT LEAST ONCE EVERY THREE YEARS, by a licensed plumbing contractor or authorized inspection agency, to ensure that the product has not been affected by corrosive water conditions and to ensure that the valve and discharge line have not been altered or tampered with illegally. Certain naturally occurring conditions may corrode the valve or its components over time, rendering the valve inoperative. Such conditions are not detectable unless the valve and its components are physically removed and inspected. This inspection must only be conducted by a plumbing contractor or authorized inspection agency – not by the owner. Failure to re-inspect the boiler relief valve as directed could result in unsafe pressure buildup, which can result in severe personal injury, death, or substantial property damage.

Following installation, the valve lever must be operated AT LEAST ONCE A YEAR to ensure that waterways are clear. Certain naturally occurring mineral deposits may adhere to the valve, rendering it inoperative. When manually operating the lever, water will discharge and precautions must be taken to avoid contact with hot water and to avoid water damage. Before operating lever, check to see that a discharge line is connected to this valve directing the flow of hot water from the valve to a proper place of disposal. Otherwise severe personal injury may result. If no water flows, valve is inoperative. Shut down the boiler until a new relief valve has been installed.

Check boiler relief valve

1.Inspect the relief valve and lift the lever to verify flow. Before operating any relief valve, ensure that it is piped with its discharge in a safe area to avoid severe scald potential. Read Section 5 - Hydronic Piping before proceeding further.

2.After following the above warning directions, if the relief valve weeps or will not seat properly, replace the relief valve. Ensure that the reason for relief valve weeping is the valve and not over-pressurization of the system due to expansion tank waterlogging or undersizing.

55

Image 55
Contents Save this manual for future reference Contents Please read before proceeding When servicing boilerBlowers Crest How it worksCrest How it works Models 1.5 2.0 2.5 3.0 Crest Ahri Rating RatingsProvide clearances Installation must comply withDetermine boiler location Before locating the boiler, checkPrevent combustion air contamination Provide air openings to roomFlooring and foundation Vent and air pipingProducts to avoid When using an existing vent system to install a new boilerAreas likely to have contaminants When removing a boiler from existing common vent system Remove boiler from wood pallet 7Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room Direct venting General ventingOptional room air Air inlet pipe materials Install vent and combustion air pipingAir intake/vent connections Approved Stainless Steel Vent Manufacturers Make ModelRemoving from existing vent Common venting Prepare roof penetrations Vertical direct ventingVent/air termination vertical Determine location4Alternate Vertical Terminations with Multiple Boilers Multiple vent/air terminationsVent/air termination sidewall Sidewall direct venting2Clearance to Doors and Windows Prepare wall penetrations4Multiple Vent Terminations must also comply with Figure Room airHydronic piping Model Circulator sizing20F 40F 60F Near boiler piping components System Multiple Boilers Common Header Primary / Secondary Flow For all equipment and detailing required by local codes Hydronic piping Gas connections Connecting gas supply pipingModel Gas Inlet Size Propane Gas Natural gasCheck inlet gas supply GAS Piping Size ChartGas Pressure Gas valve replacementInstallation must comply with Field wiringLine voltage connections Low voltage connections EnableOutdoor temperature sensor Louver proving switchSystem supply sensor Auxiliary switch 1Alarm contacts Wiring of the cascadeField WiringCondensate drain Condensate disposalFill and test water system Freeze protection when usedStart-up Check/control water chemistryInspect/check condensate lines and fittings Check for gas leaksCheck thermostat circuits Inspect condensate systemCheck system and boiler Final checks before starting the boilerStart the boiler If boiler does not start correctlyFor Your Safety Read Before Operating Gas Natural Gas Propane Valve Set space heating operationConfiguration of the cascade Verify HWG circulator mode Set HWG target temperatureSet clock General Operating informationProtection features Outdoor reset operation, if used Boiler temperature regulationCascade Sequence of operation Home Screen Crest control module2Main Menu Screen See the Crest User’s Information Manual for Instructions Maintenance Maintenance and annual startupService technician Owner maintenanceMaintenance Check boiler relief valve Flue vent system and air pipingCheck water system Check expansion tankCheck flame signal Check ignition ground wiringCheck all boiler wiring Check control settingsNiosh stated First Aid Cleaning boiler heat exchangerReview with owner Handling ceramic fiber materialsIntegrated Control Diagrams2Wiring Diagram