3 Vertical direct venting
3.The vent piping must terminate in an
4.Maintain the required dimensions of the finished termination piping as shown in FIG.
5.Do not extend exposed vent pipe outside of building more than shown in this document. Condensate could freeze and block vent pipe.
Multiple vent/air terminations
1.When terminating multiple Crest boilers, terminate each vent/air connection as described in this manual (FIG.
WARNING Terminate all vent pipes at the same height and all air pipes at the same height to
avoid recirculation of flue products and the possibility of severe personal injury, death, or substantial property damage.
2.Place roof penetrations to obtain minimum clearance of 12 inches (305 mm) between edge of air intake elbow and adjacent vent pipe of another boiler for U.S. installations (see FIG.
3.The air inlet of a Crest boiler is part of a direct vent connection. It is not classified as a forced air intake with regard to spacing from adjacent boiler vents.
Figure 3-4 Alternate Vertical Terminations with Multiple Boilers
36” (914 MM)
12”
(305 MM) 36” (914 MM)
12”
(305 MM)
Figure 3-3 Vertical Terminations with Multiple Boilers
36” (914 MM)
12” 12”(305 MM)
12” (305 MM) (305 MM)
36” (914 MM)
12”
12”(305 MM) 12”(305 MM)
(305 MM)