Crestron electronic 3.5, 2.5, 1.5 service manual Hydronic piping

Page 30

Installation & Operation Manual

5 Hydronic piping

Figure 5-5Multiple Boilers - Alternate - Common Header - Fixed or Variable Flow Primary

RELIEF

VALVE (TYPICAL)

BALL VALVE (TYPICAL)

FROM SYSTEM

BOILER DRAIN (TYPICAL)

SYSTEM RETURN

SENSOR

AIR SEPERATOR

DRAIN PORT (TYPICAL)

SYSTEM SUPPLY

SENSOR

SYSTEM

CIRCULATOR

Y-STRAINER (RECOMMENDED)

(TYPICAL)

EXPANSION

TANK PRESSURE

GAUGE

TO SYSTEM

MAKE UP

BACK FLOWWATER PREVENTER

PRESSURE

REDUCING VALVE

NOTICE

NOTICE

Please note that these illustrations are meant to show system piping concept only, the installer is responsible for all equipment and detailing required by local codes.

When installing multiple Crest boilers in fixed or variable flow primary applications, utilize a reverse-return or other piping method to ensure balanced flow through each boiler.

30

Image 30
Contents Save this manual for future reference Contents When servicing boiler Please read before proceedingCrest How it works BlowersCrest How it works Models 1.5 2.0 2.5 3.0 Ratings Crest Ahri RatingBefore locating the boiler, check Installation must comply withDetermine boiler location Provide clearancesVent and air piping Provide air openings to roomFlooring and foundation Prevent combustion air contaminationWhen using an existing vent system to install a new boiler Products to avoidAreas likely to have contaminants When removing a boiler from existing common vent system Remove boiler from wood pallet 7Combustion Air from Outside Single Opening Minimum Recommended Combustion AIR Supply to Equipment Room General venting Direct ventingOptional room air Install vent and combustion air piping Air inlet pipe materialsApproved Stainless Steel Vent Manufacturers Make Model Air intake/vent connectionsRemoving from existing vent Common venting Determine location Vertical direct ventingVent/air termination vertical Prepare roof penetrationsMultiple vent/air terminations 4Alternate Vertical Terminations with Multiple BoilersSidewall direct venting Vent/air termination sidewallPrepare wall penetrations 2Clearance to Doors and WindowsRoom air 4Multiple Vent Terminations must also comply with FigureHydronic piping Circulator sizing Model20F 40F 60F Near boiler piping components System Multiple Boilers Common Header Primary / Secondary Flow For all equipment and detailing required by local codes Hydronic piping Connecting gas supply piping Gas connectionsModel Gas Inlet Size Natural gas Propane GasGAS Piping Size Chart Check inlet gas supplyGas valve replacement Gas PressureField wiring Installation must comply withLine voltage connections Louver proving switch EnableOutdoor temperature sensor Low voltage connectionsWiring of the cascade Auxiliary switch 1Alarm contacts System supply sensorWiring FieldCondensate disposal Condensate drainCheck/control water chemistry Freeze protection when usedStart-up Fill and test water systemInspect condensate system Check for gas leaksCheck thermostat circuits Inspect/check condensate lines and fittingsIf boiler does not start correctly Final checks before starting the boilerStart the boiler Check system and boilerFor Your Safety Read Before Operating Set space heating operation Gas Natural Gas Propane ValveVerify HWG circulator mode Set HWG target temperature Configuration of the cascadeSet clock Operating information GeneralProtection features Boiler temperature regulation Outdoor reset operation, if usedCascade Sequence of operation Crest control module Home Screen2Main Menu Screen Owner maintenance Maintenance Maintenance and annual startupService technician See the Crest User’s Information Manual for InstructionsMaintenance Check expansion tank Flue vent system and air pipingCheck water system Check boiler relief valveCheck control settings Check ignition ground wiringCheck all boiler wiring Check flame signalHandling ceramic fiber materials Cleaning boiler heat exchangerReview with owner Niosh stated First AidDiagrams Integrated Control2Wiring Diagram