F.
Install Gas Control System. All components are located in Combination Boiler Parts and Control Carton.
1.Install Gas Control Assembly on Manifold. See Figure 17.
2.Install pilot burner piping and controls. See Figure 17.
3.Install Ignition Transformer.
a.Attach Ignition Transformer to Jacket Vestibule Panel using four (4) #8 x ½” lg. sheet metal screws.
b.Connect Ignition Lead from Pilot to Ignition Transformer.
4.Mount Transformer (continuous circulation) or Control Center (intermittent circulation) to Junction Box.
a.Canada only - loop 4” nylon cable tie between junction box and transformer/control center.
b.Attach transformer/control center to junction box.
16