Burnham 8H manual VIII. System Start-Up

Page 52

VIII. System Start-Up

 

 

WARNING

9.

Close purge valve, continue filling the system

 

 

 

 

until the pressure gauge reads the desired cold fill

Completely read, understand and follow all

 

 

pressure. Close fill valve.

 

instructions in this manual before attempting

 

 

(Note - If make-up water line is equipped with

start-up.

 

 

pressure reducing valve, adjust pressure reducing

A. Safe operation and other performance criteria were met

 

 

valve to desired cold fill pressure. Follow fill valve

 

 

manufacturer’s instructions).

 

 

with the gas manifold and control assembly provided

 

 

 

 

10.

Open isolation valve in boiler supply piping.

 

on boiler when boiler underwent tests specified in

 

American National Standard for Gas-Fired Low-

11.

Remove hose from purge valve.

 

 

Pressure Steam and Hot Water Boilers, ANSI Z21.13.

 

F. Confirm that the boiler and system have no water

B.

 

 

 

Check Main Burners. Main burners must be properly

 

leaks.

 

 

 

 

located on support bracket in Base Rear Panel, seated

 

G. Prepare to check operation.

 

 

on Main Burner Orifices, and secured with hitch pin

 

 

 

1.

Obtain gas heating value (in Btu per cubic foot)

 

clips.

C. Verify that the venting, water piping, gas piping

 

 

from gas supplier.

 

2.

Connect manometer to pressure tap on gas valve.

 

and electrical system are installed properly. Refer to

 

 

 

Use 1/8 NPT tapping provided.

 

 

installation instructions contained in this manual.

 

 

 

 

3.

Temporarily turn off all other gas-fired appliances.

D. Confirm all electrical, water and gas supplies

4.

Turn on gas supply to the boiler gas piping.

 

are turned off at the source and that vent is clear of

 

obstructions.

5.

Confirm that the supply pressure to the gas valve is

E. FILL ENTIRE HEATING SYSTEM WITH WATER

 

 

14 in. w.c. or less.

 

6.

Open the field installed manual gas shut-off valve

 

and vent air from system. Use following procedure on

 

a Series Loop or multi-zoned system installed as per

 

 

located upstream of the gas valve on the boiler.

 

Figure 23 to remove air from system when filling.

7.

Using soap solution, or similar non-combustible

 

 

 

 

 

solution, electronic leak detector or other approved

 

 

WARNING

 

 

 

 

 

 

method. Check that boiler gas piping, valves, and

 

 

 

 

 

all other components are leak free. Eliminate any

The maximum operating pressure of this boiler is

 

 

 

 

leaks.

 

 

 

50 psig. Never exceed this pressure. Do not plug

 

 

 

 

 

8.

Purge gas line of air.

 

or modify pressure relief valve.

 

 

1. Close full port ball valve in boiler supply piping.

 

H. Follow Lighting or Operating Instructions to place

 

 

boiler in operation. Refer to label on inside of Front

 

2. Isolate all zones by closing zone valves or shut-off

 

 

 

Removable Panel or appropriate Figure as listed in

 

 

valves in supply and return of each zone(s).

 

Table 11.

 

 

 

 

3. Attach a hose to the vertical purge valve located

 

 

 

 

 

 

 

 

 

 

DANGER

 

 

 

 

prior to the full port ball valve in the system supply

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

piping. (Note - Terminate hose in five gallon bucket

 

 

 

 

 

 

 

 

 

Do not use matches, candles, open flames or

 

 

at a suitable floor drain or outdoor area).

 

 

 

 

other ignition source to check for leaks.

 

4. Starting with one circuit at a time, open zone valve

 

 

 

 

 

 

 

 

 

 

or shut-off valve in system supply and return piping.

 

Table 11: Lighting and Operating Instructions

 

5.

Open purge valve.

 

 

 

 

 

 

 

 

 

6.

Open fill valve (Make-up water line should be

 

 

 

Lighting or

Pilot Flame

 

 

Ignition System

Operating

 

 

located directly after full port ball valve in system

 

Illustration

 

 

 

 

 

Instructions

 

 

supply piping between air scoop and expansion

 

 

 

 

 

 

 

Standing Pilot (24)

Figure 43

Figure 48

 

 

tank).

 

 

7. Allow water to overflow from bucket until discharge

 

Honeywell EI

Figure 44

Figure 49

 

 

 

OP

Figure 45

Figure 50

 

 

from hose is bubble free for 30 seconds.

 

 

 

8. Close the open zone valve or shut-off valve for the

 

 

EP

Figure 46

Figure 51

 

 

OP-CSD-1

 

 

Figure 50

 

 

zone being purged of air, then open the zone valve

 

Figure 47

 

 

 

EP-CSD-1

Figure 51

 

 

or shut-off valve for the next zone to be purged.

 

 

 

 

 

Repeat this step until all zones have been purged. At

 

 

 

 

 

 

52completion, open all zone valves or shut-off valves.

Image 52
Contents Series 8H 81416021R3-6/10 Price $5.00Important Information Read Carefully Page Table of Contents Dimensional Data Pre-Installation Boiler Model Special Base Part NumberPage II. Boiler Assembly Remove CrateInstallation of Special Base for Combustible Flooring Do not use air to leak test boilerGeneral Assembly Knockdown Boilers Flame Roll-out Switch Installation Install Jacket. See Figure Jacket Assembly EP/OP Control Installation III. Gas Control System Assembly Knockdown Boilers Page Schematic Gas Piping, 24V Standing Pilot, 806H & 807H Main Gas Piping, Intermittent Ignition EI Schematic Pilot Piping Honeywell EI, USA Page Schematic Gas Piping, OP Control System, 806H 810H Schematic Gas Piping, OP-CSD-1 Control System, 808H 810H Page Schematic Gas Piping, EP-CSD-1 Control System, 808H 810H Flow Rate, Temperature Rise, and Pressure Drop IV. Water Trim and PipingDrain Piping Installation Page Page Rated Input Gas PipingConnect boiler gas valve to gas supply system Equivalent Lengths of Standard Pipe Fittings & Valves Specific Gravity Correction FactorsBlocked Vent Switch Installation VI. VentingVent Damper Installation Boiler Equipped With Vent Damper. See FigureIf an Existing Boiler is Removed Typical Vent SystemInstall Boiler Wiring VII. ElectricalHeat Anticipator Settings Sequence of Operation and Wiring Diagrams Page Page Page Page Page Page Wiring Diagram, Honeywell EI, USA, Continuous Circulation Wiring Diagram, Honeywell EI, USA, Intermittent Circulation Wiring Diagram, Honeywell EI, Canada, Continuous Circulation Page Page Page Page Page Page VIII. System Start-Up Lighting Instructions 24V Standing Pilot Operating Instructions EI Lighting Instructions OP Operating Instructions EP Boiler Operating Instructions To Shut Down Honeywell Q314 Pilot Flame 24V Standing Pilot Check Limits Adjust gas input rate to boiler. Natural GasInput Rate Adjust gas input rate to boiler. LP/Propane Clean Heating SystemInstall Front Removable Panel Combustion Chamber Burn-OffIX. Service Clean Boiler Flueways. See FigureAvoid Breathing Fiber Particulates and Dust Boiler Flueway Cleaning Pilot Burner LocationHoneywell EI Ignition Module Yellow LED Flame Codes Honeywell EI Ignition Module Green LED Status Codes OFFHoneywell EI Trouble Shooting Guide Repair Parts Heat Exchanger Assembly Canopy Base Assembly Manifold and Main Burners Description Size Quantity Description Quantity Gas Valve, Robertshaw 7000DERHC, Natural Gas, 1 NPT 81660151 Solenoid Gas Valve, Honeywell V8295A1024, ¾ NPT 81660235 Description Quantity Natural Gas Only Pilot Burner, Honeywell Q348A1002, Natural Gas Pilot Burner, Honeywell Q348A1010, LP Gas 8236081 Pipe Tee, 1/8 NPT, Malleable 806601005 Description Size Quantity Brass Compression Coupling, 1/4 OD Tube 8236008 Description Size Quantity Page Jacket Jacket Front Removable Panel Trim and Miscellaneous Controls Draft Hood and Automatic Vent Damper Service Record Service Record Service Record