Burnham 8H manual Heat Anticipator Settings

Page 35

E.Alliance SL™ Water Heater (if used). May be used with Intermittent Circulation only.

Refer to Alliance SL™ Installation, Operating and Service Instructions for wiring, piping and additional information.

F.Vent Damper Sequence of Operation. See Figure 28 for schematic wiring diagram.

1.The Vent Damper is continuously powered at Terminal 1.

2.When there is a call for heat, the damper relay coil is energized through Terminal 5 if all limits ahead of the damper are satisfied.

3.The relay coil closes contacts which energize the damper motor, causing the damper to open.

4.When the damper blade reaches the fully open position, power is sent back to the ignition circuit

Table 9: Heat Anticipator Settings

through Terminal 2 and the damper motor is de- energized.

5.When the call for heat is satisfied, the damper relay coil is de-energized - closing contacts which energize the damper motor. This causes the damper to close. When the damper blade reaches the fully closed position, the damper motor is de-energized.

POWER FAILURE - The damper blade will stop in the position it was in when power failed. (Combustion can never take place unless the damper blade is in the fully open position).

G.Sequence of Operation and Wiring. Refer to Table 10 for the appropriate control system.

H.Optional Low-Water Cut-Off Wiring. See Figures 45 through 48.

Control System

Heat Anticipator Setting *

Continuous Circulation

Intermittent Circulation

 

24V Standing Pilot

1.1

0.3

24V Electronic Ignition

USA: 0.9

0.3

Canada: 1.2

 

 

* If room is heated above thermostat temperature setting, reduce heat anticipator setting by 0.1 or

0.2 amps. If boiler short cycles without room reaching desired temperature, increase heat anticipator by 0.1 or 0.2 amps.

35

Image 35
Contents 81416021R3-6/10 Price $5.00 Series 8HImportant Information Read Carefully Page Table of Contents Dimensional Data Boiler Model Special Base Part Number Pre-InstallationPage Remove Crate II. Boiler AssemblyDo not use air to leak test boiler Installation of Special Base for Combustible FlooringGeneral Assembly Knockdown Boilers Flame Roll-out Switch Installation Install Jacket. See Figure Jacket Assembly EP/OP Control Installation III. Gas Control System Assembly Knockdown Boilers Page Schematic Gas Piping, 24V Standing Pilot, 806H & 807H Main Gas Piping, Intermittent Ignition EI Schematic Pilot Piping Honeywell EI, USA Page Schematic Gas Piping, OP Control System, 806H 810H Schematic Gas Piping, OP-CSD-1 Control System, 808H 810H Page Schematic Gas Piping, EP-CSD-1 Control System, 808H 810H IV. Water Trim and Piping Flow Rate, Temperature Rise, and Pressure DropDrain Piping Installation Page Page Connect boiler gas valve to gas supply system Gas PipingRated Input Specific Gravity Correction Factors Equivalent Lengths of Standard Pipe Fittings & ValvesVI. Venting Blocked Vent Switch Installation Boiler Equipped With Vent Damper. See Figure Vent Damper InstallationTypical Vent System If an Existing Boiler is RemovedVII. Electrical Install Boiler WiringHeat Anticipator Settings Sequence of Operation and Wiring Diagrams Page Page Page Page Page Page Wiring Diagram, Honeywell EI, USA, Continuous Circulation Wiring Diagram, Honeywell EI, USA, Intermittent Circulation Wiring Diagram, Honeywell EI, Canada, Continuous Circulation Page Page Page Page Page Page VIII. System Start-Up Lighting Instructions 24V Standing Pilot Operating Instructions EI Lighting Instructions OP Operating Instructions EP Boiler Operating Instructions To Shut Down Honeywell Q314 Pilot Flame 24V Standing Pilot Input Rate Adjust gas input rate to boiler. Natural GasCheck Limits Combustion Chamber Burn-Off Adjust gas input rate to boiler. LP/PropaneClean Heating System Install Front Removable PanelClean Boiler Flueways. See Figure IX. ServiceAvoid Breathing Fiber Particulates and Dust Pilot Burner Location Boiler Flueway CleaningHoneywell EI Ignition Module Yellow LED Flame Codes OFF Honeywell EI Ignition Module Green LED Status CodesHoneywell EI Trouble Shooting Guide Repair Parts Heat Exchanger Assembly Canopy Base Assembly Manifold and Main Burners Description Size Quantity Description Quantity Gas Valve, Robertshaw 7000DERHC, Natural Gas, 1 NPT 81660151 Solenoid Gas Valve, Honeywell V8295A1024, ¾ NPT 81660235 Description Quantity Natural Gas Only Pilot Burner, Honeywell Q348A1002, Natural Gas Pilot Burner, Honeywell Q348A1010, LP Gas 8236081 Pipe Tee, 1/8 NPT, Malleable 806601005 Description Size Quantity Brass Compression Coupling, 1/4 OD Tube 8236008 Description Size Quantity Page Jacket Jacket Front Removable Panel Trim and Miscellaneous Controls Draft Hood and Automatic Vent Damper Service Record Service Record Service Record