Burnham 8H manual Honeywell EI Ignition Module Green LED Status Codes, Off

Page 65

Honeywell EI Ignition Module Green LED Status Codes

Green LED

 

 

 

Flash Code

Indicates

Next System Action

Recommended Service Action

(X + Y)a

 

 

 

OFF

No “Call for Heat”

N/A

None

Flash Fast

Startup - Flame sense

N/A

None

calibration

 

 

 

Heartbeat

Normal operation

N/A

None

 

 

 

If system fails to light on next trial for

 

5 minute Retry Delay-

Initiate new trial for ignition after

ignition check gas supply, pilot burner,

2

Pilot flame not detected

spark and flame sense wiring, flame rod

retry delay completed.

 

during trial for ignition

contamination or out of position, burner

 

 

 

 

 

ground connection.

 

 

Initiate new trial for ignition. Flash

If system fails to light on next trial

 

Recycle- Flame failed

for ignition check gas supply, pilot

3

code will remain through the ignition

during run

burner, flame sense wiring, flame rod

 

 

trial until flame is proved.

contamination, burner ground connection.

 

 

 

 

 

If situation self corrects within 10

 

 

 

seconds, control returns to normal

Check for pilot flame. Replace gas valve

4

Flame sensed out of

sequence. If flame out of sequence

if pilot flame present. If no pilot flame,

sequence

remains longer than 10 seconds,

cycle “Call for Heat.” If error repeats,

 

 

 

control goes to Flash code 6+4 (see

replace control.

 

 

below)

 

 

 

Control remains in wait mode.

Check flame sense lead wire for damage

7

Flame sense leakage to

When the fault corrects, control

or shorting. Check that flame rod is in

ground

resumes normal operation after a

proper position. Check flame rod ceramic

 

 

 

one minute delay.

for cracks, damage or tracking.

 

 

Control remains in wait mode.

Check transformer and AC line for proper

 

Low secondary voltage

When the fault corrects, control

8

input voltage to the control. Check with

supply- (below 15.5 Vac)

resumes normal operation after one

 

full system load on the transformer.

 

 

minute delay.

 

 

5 minute Retry Delay-

 

Check gas supply, pilot burner, spark

 

Initiate new trial for ignition after

and flame sense wiring, flame rod

6 + 2

On every third retry on

retry delay completed.

contamination or out of position, burner

 

same “Call for Heat”

 

 

ground connection.

 

 

 

 

On every 6th flame

5 minute retry delay, then initiate

Check gas supply, pilot burner, flame

6 + 3

failure during run on the

sense wiring, contamination of flame rod,

new trial for ignition.

 

same “Call for Heat”

burner ground connection.

 

 

 

 

Control waits until flame is no

Check for pilot flame. Replace gas valve

 

Flame sensed out of

longer sensed and then goes to

 

if pilot flame present. If no pilot flame,

6 + 4

sequence- longer than

soft lockout. Flash code continues.

cycle “Call for Heat.” If error repeats,

 

10 seconds

Control auto resets from soft

 

replace control.

 

 

lockout after one hour.

 

 

 

 

Soft lockout due to error

Control auto resets from soft

Reset by cycling “Call for Heat.” If error

ON

detected during self

lockout after one hour.

repeats, replace the control

 

check sequences

 

 

 

aFlash Code Descriptions:

 

 

-Flash Fast: rapid blinking

-Heartbeat: Constant ½ second bright, ½ second dim cycles.

-A single flash code number signifies that the LED flashes X times at 2Hz, remains off for two seconds, and then repeats the sequence.

-X + Y flash codes signify that the LED flashes X times at 2Hz, remains off for two seconds, flashes Y times at

2 Hz, remains off for three seconds, and then repeats the sequence.

65

Image 65
Contents 81416021R3-6/10 Price $5.00 Series 8HImportant Information Read Carefully Page Table of Contents Dimensional Data Boiler Model Special Base Part Number Pre-InstallationPage Remove Crate II. Boiler AssemblyDo not use air to leak test boiler Installation of Special Base for Combustible FlooringGeneral Assembly Knockdown Boilers Flame Roll-out Switch Installation Install Jacket. See Figure Jacket Assembly EP/OP Control Installation III. Gas Control System Assembly Knockdown Boilers Page Schematic Gas Piping, 24V Standing Pilot, 806H & 807H Main Gas Piping, Intermittent Ignition EI Schematic Pilot Piping Honeywell EI, USA Page Schematic Gas Piping, OP Control System, 806H 810H Schematic Gas Piping, OP-CSD-1 Control System, 808H 810H Page Schematic Gas Piping, EP-CSD-1 Control System, 808H 810H IV. Water Trim and Piping Flow Rate, Temperature Rise, and Pressure DropDrain Piping Installation Page Page Connect boiler gas valve to gas supply system Gas PipingRated Input Specific Gravity Correction Factors Equivalent Lengths of Standard Pipe Fittings & ValvesVI. Venting Blocked Vent Switch InstallationBoiler Equipped With Vent Damper. See Figure Vent Damper InstallationTypical Vent System If an Existing Boiler is RemovedVII. Electrical Install Boiler WiringHeat Anticipator Settings Sequence of Operation and Wiring Diagrams Page Page Page Page Page Page Wiring Diagram, Honeywell EI, USA, Continuous Circulation Wiring Diagram, Honeywell EI, USA, Intermittent Circulation Wiring Diagram, Honeywell EI, Canada, Continuous Circulation Page Page Page Page Page Page VIII. System Start-Up Lighting Instructions 24V Standing Pilot Operating Instructions EI Lighting Instructions OP Operating Instructions EP Boiler Operating Instructions To Shut Down Honeywell Q314 Pilot Flame 24V Standing Pilot Input Rate Adjust gas input rate to boiler. Natural GasCheck Limits Clean Heating System Adjust gas input rate to boiler. LP/PropaneInstall Front Removable Panel Combustion Chamber Burn-OffClean Boiler Flueways. See Figure IX. ServiceAvoid Breathing Fiber Particulates and Dust Pilot Burner Location Boiler Flueway CleaningHoneywell EI Ignition Module Yellow LED Flame Codes OFF Honeywell EI Ignition Module Green LED Status CodesHoneywell EI Trouble Shooting Guide Repair Parts Heat Exchanger Assembly Canopy Base Assembly Manifold and Main Burners Description Size Quantity Description Quantity Gas Valve, Robertshaw 7000DERHC, Natural Gas, 1 NPT 81660151 Solenoid Gas Valve, Honeywell V8295A1024, ¾ NPT 81660235 Description Quantity Natural Gas Only Pilot Burner, Honeywell Q348A1002, Natural Gas Pilot Burner, Honeywell Q348A1010, LP Gas 8236081 Pipe Tee, 1/8 NPT, Malleable 806601005 Description Size Quantity Brass Compression Coupling, 1/4 OD Tube 8236008 Description Size Quantity Page Jacket Jacket Front Removable Panel Trim and Miscellaneous Controls Draft Hood and Automatic Vent Damper Service Record Service Record Service Record