Burnham
8H
manual
Install
Repair Parts
Dimension
II. Boiler Assembly
Heat Anticipator Settings
Clean Heating System
IX. Service
Page 48
Figure 37: Wiring Diagram,
EP/EP-CSD-1
Ignition System, USA, Continuous Circulation
48
Page 47
Page 49
Image 48
Page 47
Page 49
Contents
Series 8H
81416021R3-6/10 Price $5.00
Important Information Read Carefully
Page
Table of Contents
Dimensional Data
Pre-Installation
Boiler Model Special Base Part Number
Page
II. Boiler Assembly
Remove Crate
Installation of Special Base for Combustible Flooring
Do not use air to leak test boiler
General Assembly Knockdown Boilers
Flame Roll-out Switch Installation
Install Jacket. See Figure
Jacket Assembly
EP/OP Control Installation
III. Gas Control System Assembly Knockdown Boilers
Page
Schematic Gas Piping, 24V Standing Pilot, 806H & 807H
Main Gas Piping, Intermittent Ignition EI
Schematic Pilot Piping Honeywell EI, USA
Page
Schematic Gas Piping, OP Control System, 806H 810H
Schematic Gas Piping, OP-CSD-1 Control System, 808H 810H
Page
Schematic Gas Piping, EP-CSD-1 Control System, 808H 810H
Flow Rate, Temperature Rise, and Pressure Drop
IV. Water Trim and Piping
Drain Piping Installation
Page
Page
Gas Piping
Rated Input
Connect boiler gas valve to gas supply system
Equivalent Lengths of Standard Pipe Fittings & Valves
Specific Gravity Correction Factors
Blocked Vent Switch Installation
VI. Venting
Vent Damper Installation
Boiler Equipped With Vent Damper. See Figure
If an Existing Boiler is Removed
Typical Vent System
Install Boiler Wiring
VII. Electrical
Heat Anticipator Settings
Sequence of Operation and Wiring Diagrams
Page
Page
Page
Page
Page
Page
Wiring Diagram, Honeywell EI, USA, Continuous Circulation
Wiring Diagram, Honeywell EI, USA, Intermittent Circulation
Wiring Diagram, Honeywell EI, Canada, Continuous Circulation
Page
Page
Page
Page
Page
Page
VIII. System Start-Up
Lighting Instructions 24V Standing Pilot
Operating Instructions EI
Lighting Instructions OP
Operating Instructions EP
Boiler Operating Instructions To Shut Down
Honeywell Q314 Pilot Flame 24V Standing Pilot
Adjust gas input rate to boiler. Natural Gas
Check Limits
Input Rate
Adjust gas input rate to boiler. LP/Propane
Clean Heating System
Install Front Removable Panel
Combustion Chamber Burn-Off
IX. Service
Clean Boiler Flueways. See Figure
Avoid Breathing Fiber Particulates and Dust
Boiler Flueway Cleaning
Pilot Burner Location
Honeywell EI Ignition Module Yellow LED Flame Codes
Honeywell EI Ignition Module Green LED Status Codes
OFF
Honeywell EI Trouble Shooting Guide
Repair Parts
Heat Exchanger Assembly
Canopy
Base Assembly
Manifold and Main Burners
Description Size Quantity
Description Quantity
Gas Valve, Robertshaw 7000DERHC, Natural Gas, 1 NPT 81660151
Solenoid Gas Valve, Honeywell V8295A1024, ¾ NPT 81660235
Description Quantity
Natural Gas Only
Pilot Burner, Honeywell Q348A1002, Natural Gas
Pilot Burner, Honeywell Q348A1010, LP Gas 8236081
Pipe Tee, 1/8 NPT, Malleable 806601005
Description Size Quantity
Brass Compression Coupling, 1/4 OD Tube 8236008
Description Size Quantity
Page
Jacket
Jacket Front Removable Panel
Trim and Miscellaneous Controls
Draft Hood and Automatic Vent Damper
Service Record
Service Record
Service Record
Related pages
Chapter Troubleshooting for Kyocera DP-3600
Specifications for Oregon Scientific RMR182
Responding to Error Messages for Kyocera KM-2540
220V Wiring Diagram for Grizzly G0513X2BF
How to use FTP or SCP to retrieve log files for APC AP8886
Installing Additional Drives for HP dc5800
Parts List for Coleman 5040-761
Country Code List for Zenith XBS341
Remplacement DU Filtre Carburant DU Moteur Diesel for Nilfisk-ALTO RS 1300
To begin / Setting up for Philips 32PFL8605H
Where can I find troubleshooting tips for the
Black and Decker RP250 router
?
Top
Page
Image
Contents