BOILER OPERATING INSTRUCTIONS
TO SHUT DOWN:
1.Close manual main
2.Turn off main electric switch.
TO START UP:
1.Make sure that both the main manual and the pilot valve(s) have been off for at least five minutes.
2.Turn room thermostat and all operating controls to lowest setting.
3.Remove burner access panel(s).
4.Open manual pilot valve(s).
NOTE:
Item (5) applies only to boilers with standing pilot safety switch(es).
5.Depress button on standing pilot safety switch and hold lighted match to pilot, holding button in for at least one minute or until pilot remains lighted after button is released. Repeat for remaining standing pilots.
6.Turn on main electric switch.
7.Reset safety switch on flame safeguard relay.
8.Immediately light constant burning rectification pilot(s)
Q179D with a lighted match. If pilot is not lighted in 15 seconds, Step (7) must be repeated. Electric pilot valve(s) are automatic, opening after Step (7). (“OP” System).
8a. Intermittent electric ignition rectification pilot(s) Q179C light up automatically when thermostat or operating control calls for heat. (“EP” System).
9.Replace burner access panel(s).
10.Open manual main
11.Adjust room thermostat and operating controls to desired setting.
Figure 47: Lighting / Operating Instructions (OP/EP-CSD-1)
57