Burnham 8H manual Boiler Flueway Cleaning, Pilot Burner Location

Page 63

Figure 53: Boiler Flueway Cleaning

F.Clean Combustion Chamber by vacuuming. Exercise care to avoid damaging Base Insulation.

G.Install Burners by reversing procedures used to remove burners. Verify Main Burners are properly located on support bracket in Base Rear Panel, seated on Main Burner Orifices, and secured with hitch pin clips. Verify Main Burner with Pilot Bracket is in proper location. See Table 13.

H.Lubrication. Manufacturers Instruction should be followed on all parts installed on boiler requiring lubrication. This includes type of lubricant to be used, frequency of lubrication, and points to lubricate.

I.Check operation. Refer to Section VIII: System Start- up.

Table 13: Pilot Burner Location

Boiler Model

Pilot Located Between Burners*

805H

4 & 5

806H

5 & 6

807H

6 & 7

808H

6 & 7

809H

7 & 8

810H

8 & 9

*Burners numbered left to right as viewed from front of boiler.

63

Image 63
Contents 81416021R3-6/10 Price $5.00 Series 8HImportant Information Read Carefully Page Table of Contents Dimensional Data Boiler Model Special Base Part Number Pre-InstallationPage Remove Crate II. Boiler AssemblyDo not use air to leak test boiler Installation of Special Base for Combustible FlooringGeneral Assembly Knockdown Boilers Flame Roll-out Switch Installation Install Jacket. See Figure Jacket Assembly EP/OP Control Installation III. Gas Control System Assembly Knockdown Boilers Page Schematic Gas Piping, 24V Standing Pilot, 806H & 807H Main Gas Piping, Intermittent Ignition EI Schematic Pilot Piping Honeywell EI, USA Page Schematic Gas Piping, OP Control System, 806H 810H Schematic Gas Piping, OP-CSD-1 Control System, 808H 810H Page Schematic Gas Piping, EP-CSD-1 Control System, 808H 810H IV. Water Trim and Piping Flow Rate, Temperature Rise, and Pressure DropDrain Piping Installation Page Page Gas Piping Rated InputConnect boiler gas valve to gas supply system Specific Gravity Correction Factors Equivalent Lengths of Standard Pipe Fittings & ValvesVI. Venting Blocked Vent Switch InstallationBoiler Equipped With Vent Damper. See Figure Vent Damper InstallationTypical Vent System If an Existing Boiler is RemovedVII. Electrical Install Boiler WiringHeat Anticipator Settings Sequence of Operation and Wiring Diagrams Page Page Page Page Page Page Wiring Diagram, Honeywell EI, USA, Continuous Circulation Wiring Diagram, Honeywell EI, USA, Intermittent Circulation Wiring Diagram, Honeywell EI, Canada, Continuous Circulation Page Page Page Page Page Page VIII. System Start-Up Lighting Instructions 24V Standing Pilot Operating Instructions EI Lighting Instructions OP Operating Instructions EP Boiler Operating Instructions To Shut Down Honeywell Q314 Pilot Flame 24V Standing Pilot Adjust gas input rate to boiler. Natural Gas Check LimitsInput Rate Combustion Chamber Burn-Off Adjust gas input rate to boiler. LP/Propane Clean Heating System Install Front Removable PanelClean Boiler Flueways. See Figure IX. ServiceAvoid Breathing Fiber Particulates and Dust Pilot Burner Location Boiler Flueway CleaningHoneywell EI Ignition Module Yellow LED Flame Codes OFF Honeywell EI Ignition Module Green LED Status CodesHoneywell EI Trouble Shooting Guide Repair Parts Heat Exchanger Assembly Canopy Base Assembly Manifold and Main Burners Description Size Quantity Description Quantity Gas Valve, Robertshaw 7000DERHC, Natural Gas, 1 NPT 81660151 Solenoid Gas Valve, Honeywell V8295A1024, ¾ NPT 81660235 Description Quantity Natural Gas Only Pilot Burner, Honeywell Q348A1002, Natural Gas Pilot Burner, Honeywell Q348A1010, LP Gas 8236081 Pipe Tee, 1/8 NPT, Malleable 806601005 Description Size Quantity Brass Compression Coupling, 1/4 OD Tube 8236008 Description Size Quantity Page Jacket Jacket Front Removable Panel Trim and Miscellaneous Controls Draft Hood and Automatic Vent Damper Service Record Service Record Service Record