II.Boiler Assembly
A.Remove Crate
1.Remove all fasteners at crate skid.
2.Lift outside container and remove with all other inside protective spacers and bracing.
B.Remove boiler from skid. See Figure 2. Exercise care to avoid dropping boiler.
1.Place boiler in approximate location. Refer to Section I:
2.Using pry bar under rear corner of Base End Panel, raise boiler and install 1½” wood blocks under rear corners. Install ¾” pipe roller between Base and skid.
3.Remove 1½” wood blocks. Place 3” pipe roller on floor behind skid.
4.Roll boiler off skid. Move skid out of way.
5.Roll boiler until 3” roller is located as shown. Use pry bar to install wood blocks under front corners of
base. Remove 3” roller. | Figure 2: Skid Removal |
|
Figure 3: Tapping Locations
Table 3: Purpose of Tappings
Tapping | Size | Purpose |
A | 2” | Supply |
B | 2” | Return |
C | 3/4” | Relief Valve |
D | 3/4” | Limit |
E | 3/4” | Auxiliary Limit |
F | 3/4” | Washout |
G | 3/4” | Drain |