For Vertical Runs

The flue system must be supported every eight (8) feet (2.4 M) above the heater flue outlet by wall brackets.

To install support brackets for vertical runs:

• Attach wall brackets to the flue pipe and secure the wall bracket to the framing members with nails or screws.

WALL BRACKET

WALL STUD

8 FT.

(2.4m)

FLUE

OUTLET

1 INCH MIN.

(25mm)

Figure 23. Installing Support Brackets

4. Install Firestops

For Horizontal Runs - Firestops are REQUIRED on both sides of a combustible wall through which the flue passes.

To install firestops (heat shield) for horizontal runs that pass through either interior or exterior walls:

Cut a 10-inch by 12-inch (254 mm X 305 mm) hole through the wall.

Position the firestops on both sides of the hole pre- viously cut and secure the firestops with nails or screws.

The pipe opening of the firestops MUST BE placed towards the bottom of the firestop.

Continue the flue run through the firestop.

 

10" (254mm)

INTERIOR

 

WALL SHIELD

 

 

12" (305mm)

Figure 24.

Flue Pipe & Firestop

For Vertical Runs - One firestop is REQUIRED at the hole in each ceiling through which the flue passes.

To install firestops for vertical runs that pass through ceilings:

Position a plumb bob directly over the center of the vertical flue component.

Mark the ceiling to establish the centerpoint of the flue.

Drill a hole or drive a nail through this center point.

Check the floor above for any obstructions, such as wiring or plumbing runs.

Reposition the heater and flue system, if neces- sary, to accommodate the ceiling joists and/or ob- structions.

Cut a 10-inch X 10-inch (254mm X 305mm) hole through the ceiling, using the firestop pipe opening as a guide.

Frame the hole with framing lumber the same size as the ceiling joists.

10" (254mm)

 

10” (254mm)

 

 

 

 

CHIMNEY

 

 

HOLE

 

NEW

EXISTING CEILING

 

JOISTS

 

FRAMING

 

MEMBERS

 

CEILING

 

 

Figure 25. Hole and New Framing Members

20

Heat & Glo • SL-550TRSI-AUE2079-902 Rev. B • 7/06

Image 20
Contents Model SL-550TRSI-AUE Kensington Boulevard, Lakeville, MN 55044 USAHeat & Glo Quality Systems registered by SGS ICS Table of Contents Diagram of SL-550TRSI-AUE Rear Flue Installation InstructionsTop Flue Framing Dimensions IntroductionSpace heaters Identifying Flue Components Flue System ApprovalsModel Flue Termination Approvals DVP90ST Heat & Glo SL-550TRSI-AUE 2079-902 Rev. B 7/06 Vertical Flueing Maximum 10.97MUSE SL D-SERIES USE DVP-SERIES Components onlyUSE SL D-SERIES Components Only Flueing with ONE 1 90 Elbow USE DVP-SERIES ComponentsFT. V M FT. HM Flueing with TWO 2 90 Elbows+ H FT. M Flueing with TWO 2 90 Elbows Flueing with Three 3 90 Elbows + H1 FT. MFlueing with Three 3 90 Elbows Installing Flue Components Nent and the Outer Heater Wrap Assembling Flue ComponentsInstall Support Brackets Continue Adding Flue ComponentsInstalling Support Brackets Hole and New Framing MembersFlue Termination Connecting the GAS Supply Gas Supply LineIgnition System Wiring Shock RiskBlower FAN Finishing CeilingPilot Assembly Installer TestingInstalling the Trim 3 4 5 6 7 Heat & Glo SL-550TRSI-AUE 2079-902 Rev. B 7/06 Heat & Glo SL-550TRSI-AUE 2079-902 Rev. B 7/06 Trol Wiring System of this Unit Operating InstructionsOperating This Appliance MAY Exhibit a Slight Carbon DepositionSafety & Lighting Information Do not Connect 220/240 VAC to the Control ValveFAN Operation Servicing and MaintenanceGlass Door When IT is HOT Removal of Components for Service Parts ReplacementAdjustments and Replacement Parts Removal of Covers for ServicingMaintenance Tasks Doors Inspect Maintenance TasksTroubleshooting Electronic Ignition SystemPan beneath the burne Log set assembly SL-550TRSI-AUESL-550TRSI-AUE Service Parts List Heat & Glo SL-550TRSI-AUE 2079-902 Rev. B 7/06 Melbourne