For Vertical Terminations - To locate the flue and install the flue sections:

Locate and mark the flue centerpoint on the under- side of the roof, and drive a nail through the centerpoint.

Make the outline of the roof hole around the centerpoint nail.

The size of the roof hole framing dimensions depend on the pitch of the roof. There MUST BE a 1-inch (25mm) clearance from the vertical flue pipe to com- bustible materials.

Mark the roof hole accordingly.

Cover the opening of the installed flue pipes.

Cut and frame the roof hole.

Use framing lumber the same size as the roof rafters and install the frame securely. Flashing anchored to the frame must withstand heavy winds.

Continue to install concentric flue sections up through the roof hole and up past the roof line until you reach the appropriate distance above the roof.

CAUTION: FOLLOW THE REQUIREMENTS OF THE AGA GAS INSTALLATION CODE FOR MINIMUM HEIGHT REQUIREMENTS ABOVE THE ROOF.

To seal the roof hole, and to divert rain and snow from the flue system:

Attach a flashing to the roof using nails, and use a non-hardening mastic around the edges of the flash- ing base where it meets the roof.

Attach a storm collar over the flashing joint to form a water-tight seal. Place non-hardening mastic around the joint, between the storm collar and the vertical pipe.

Slide the termination cap over the end of the flue pipe and rotate the pipe clockwise 1/4 turn.

GAS ACCESS

Figure 29. Gas Supply Line

1.3 CONNECTING THE GAS SUPPLY

The gas is introduced to the appliance on the left hand side. See Figure 29. After the gas pipe installation is complete, check carefully all gas connections for leaks with a commercially-available, non-corrosive leak check solution. Be sure to rinse off all leak check solution following testing. DO NOT USE AN OPEN FLAME.

NOTE: THE GAS SUPPLY LINE SHOULD BE PURGED OF ANY TRAPPED AIR PRIOR TO THE FIRST FIR- ING OF THE UNIT.

22

Heat & Glo • SL-550TRSI-AUE2079-902 Rev. B • 7/06

Image 22
Contents Model SL-550TRSI-AUE Kensington Boulevard, Lakeville, MN 55044 USAHeat & Glo Quality Systems registered by SGS ICS Table of Contents Diagram of SL-550TRSI-AUE Top Flue Installation InstructionsRear Flue Framing Dimensions IntroductionSpace heaters Model Flue Termination Approvals Flue System ApprovalsIdentifying Flue Components DVP90ST Heat & Glo SL-550TRSI-AUE 2079-902 Rev. B 7/06 USE SL D-SERIES Vertical FlueingMaximum 10.97M USE DVP-SERIES Components onlyUSE SL D-SERIES Components Only Flueing with ONE 1 90 Elbow USE DVP-SERIES Components+ H FT. M Flueing with TWO 2 90 ElbowsFT. V M FT. HM Flueing with TWO 2 90 Elbows Flueing with Three 3 90 Elbows + H1 FT. MFlueing with Three 3 90 Elbows Installing Flue Components Nent and the Outer Heater Wrap Assembling Flue ComponentsInstall Support Brackets Continue Adding Flue ComponentsInstalling Support Brackets Hole and New Framing MembersFlue Termination Connecting the GAS Supply Gas Supply LineIgnition System Wiring Shock RiskBlower FAN Finishing CeilingInstalling the Trim Installer TestingPilot Assembly 3 4 5 6 7 Heat & Glo SL-550TRSI-AUE 2079-902 Rev. B 7/06 Heat & Glo SL-550TRSI-AUE 2079-902 Rev. B 7/06 Operating Trol Wiring System of this UnitOperating Instructions This Appliance MAY Exhibit a Slight Carbon DepositionSafety & Lighting Information Do not Connect 220/240 VAC to the Control ValveGlass Door When IT is HOT Servicing and MaintenanceFAN Operation Adjustments and Replacement Parts Removal of Components for ServiceParts Replacement Removal of Covers for ServicingMaintenance Tasks Doors Inspect Maintenance TasksTroubleshooting Electronic Ignition SystemPan beneath the burne Log set assembly SL-550TRSI-AUESL-550TRSI-AUE Service Parts List Heat & Glo SL-550TRSI-AUE 2079-902 Rev. B 7/06 Melbourne