Hearth and Home Technologies SL-550TRSI-AUE manual Finishing, Ceiling

Page 25

1.6 FINISHING

The minimum clearance to combustibles are 0 from the sides, floor, back and top (these clearances are defined by the standoffs). The minimum distance to the perpendicular side wall extending past the appliance front is 2-inches (51mm). Clearance to a mantelpiece is shown in Figure 33.

IF JOINTS BETWEEN THE FINISHED WALLS AND THE FIREPLACE SURROUND (TOP AND SIDES) ARE SEALED, A 300° F (149°C). MINIMUM SEAL-

ANT MATERIAL MUST BE USED. THESE JOINTS ARE NOT REQUIRED TO BE SEALED. ONLY NON- COMBUSTIBLE MATERIAL (USING 300° F. (149°C)

MINIMUM ADHESIVE, IF NEEDED) CAN BE AP- PLIED AS FACING TO THE FIREPLACE SUR- ROUND. SEE FIGURE 33.

 

 

 

 

 

 

 

CEILING

 

 

 

 

 

 

 

 

31”

 

 

 

 

 

12” (305mm)

(787mm)

 

 

 

 

 

 

 

 

 

 

 

11” (279mm)

 

 

 

 

 

 

10” (254mm)

 

 

 

 

 

 

9” (229mm)

 

 

 

 

 

8” (203mm)

 

 

 

 

 

7” (178mm)

 

 

 

9”

 

 

 

 

 

 

 

 

 

6” (152mm)

 

 

(229mm)

 

5” (127mm)

 

 

 

 

 

10”

 

 

 

 

 

 

6”

 

 

4” (102mm)

 

 

 

 

(254mm)

 

 

 

(152mm)

 

 

 

3” (76mm)

 

 

 

7”

11”

 

2” (51mm)

 

 

 

5”

(178mm)

(279mm)

 

 

 

 

 

 

 

 

 

 

 

4”

(127mm)

 

8”

12”

 

2”

3”

 

(102mm)

 

(203mm)

(305mm)

 

(76mm)

 

 

 

 

 

 

(51mm)

 

 

 

 

 

 

 

TOP FRONT EDGE

 

 

 

 

 

OF FIREPLACE

 

 

 

 

 

NON-COMBUSTIBLE

 

 

FINISH MATERIAL

 

 

 

BOARD

 

 

 

MAY BE COMBUSTIBLE

 

 

 

 

 

 

 

 

- TOP AND SIDES

 

 

 

 

TOP SEAL

 

 

OF UNIT

 

 

 

 

 

 

 

 

 

 

 

JOINT

 

 

 

 

 

 

 

SIDE SEAL

 

 

 

 

 

 

 

JOINT

 

 

 

 

 

 

 

 

 

 

 

0”

 

 

 

 

 

 

1/2”

 

 

 

 

 

 

 

(13mm)

 

 

Figure 33.

 

 

 

 

 

 

 

 

Heat & Glo • SL-550TRSI-AUE2079-902 Rev. B • 7/06

25

Image 25
Contents Kensington Boulevard, Lakeville, MN 55044 USA Model SL-550TRSI-AUEHeat & Glo Quality Systems registered by SGS ICS Table of Contents Diagram of SL-550TRSI-AUE Top Flue Installation InstructionsRear Flue Introduction Framing DimensionsSpace heaters Model Flue Termination Approvals Flue System ApprovalsIdentifying Flue Components DVP90ST Heat & Glo SL-550TRSI-AUE 2079-902 Rev. B 7/06 Maximum 10.97M Vertical FlueingUSE SL D-SERIES USE DVP-SERIES Components onlyUSE DVP-SERIES Components USE SL D-SERIES Components Only Flueing with ONE 1 90 Elbow+ H FT. M Flueing with TWO 2 90 ElbowsFT. V M FT. HM Flueing with TWO 2 90 Elbows + H1 FT. M Flueing with Three 3 90 ElbowsFlueing with Three 3 90 Elbows Installing Flue Components Assembling Flue Components Nent and the Outer Heater WrapContinue Adding Flue Components Install Support BracketsHole and New Framing Members Installing Support BracketsFlue Termination Gas Supply Line Connecting the GAS SupplyShock Risk Ignition System WiringBlower FAN Ceiling FinishingInstalling the Trim Installer TestingPilot Assembly 3 4 5 6 7 Heat & Glo SL-550TRSI-AUE 2079-902 Rev. B 7/06 Heat & Glo SL-550TRSI-AUE 2079-902 Rev. B 7/06 Operating Instructions Trol Wiring System of this UnitOperating This Appliance MAY Exhibit a Slight Carbon DepositionDo not Connect 220/240 VAC to the Control Valve Safety & Lighting InformationGlass Door When IT is HOT Servicing and MaintenanceFAN Operation Parts Replacement Removal of Components for ServiceAdjustments and Replacement Parts Removal of Covers for ServicingDoors Inspect Maintenance Tasks Maintenance TasksElectronic Ignition System TroubleshootingPan beneath the burne SL-550TRSI-AUE Log set assemblySL-550TRSI-AUE Service Parts List Heat & Glo SL-550TRSI-AUE 2079-902 Rev. B 7/06 Melbourne