Hearth and Home Technologies SL-550TRSI-AUE manual Introduction, Framing Dimensions

Page 6

Framing should be constructed

of 2 X 4 lumber or heavier.

The framing headers

may rest on the

fireplace stand-offs.

B

FLUE

 

D

 

 

FRAMING

E

WALL STUD

 

HOLE

 

 

 

 

 

38mm

A

B

C

D*

E*

37 in.

33-1/4 in.

16-1/2 in.

43-3/4 in.

23-3/8 in.

(940mm)

(845mm)

(420mm)

(1111mm)

(594mm)

 

 

 

 

 

*NOTE: The center of the framing hole is one inch (254mm) above the center of the horizontal flue pipe.

C

A

76mm

NON-COMBUSTIBLE ZONE

IS DEFINED BY 76MM ABOVE THE ELBOW FOR THE ENTIRE WIDTH AND DEPTH (BEHIND THE FRONT HEADER) OF THE FIREBOX.

Figure 3. Framing Dimensions

CAUTION: Measure heater dimensions, and verify framing methods and wall covering details be- fore framing construction begins.

1.1 INTRODUCTION

This model is designed to operate with all com- bustion air being siphoned from the outside of the building and all exhaust gases expelled to the outside of the building.

WARNING: THIS UNIT IS NOT FOR USE WITH SOLID FUEL.

These units MUST use the flue termination described in the flueing section of the manual.

The control system for this model is an electronic igni- tion type. It consists of a gas control valve/variable regu- lator, a pilot/sensor/electrode and an ON/OFF switch. The controls are located behind the access door. Ro- tate the door down to open. See Figure 1.

Minimum inlet gas supply pressure for purpose of input adjustment is 4.5 inches w.c. (1.13kPa) for natural gas and 11 inches w.c. (2.75kPa) for propane. Manifold (out- let) pressures should be set at 3.5 inches w.c. (.8kPa) for natural gas models and 9.5 inches w.c. (2.36kPa) for propane models.

6

Heat & Glo • SL-550TRSI-AUE2079-902 Rev. B • 7/06

Image 6
Contents Model SL-550TRSI-AUE Kensington Boulevard, Lakeville, MN 55044 USAHeat & Glo Quality Systems registered by SGS ICS Table of Contents Diagram of SL-550TRSI-AUE Installation Instructions Top FlueRear Flue Framing Dimensions IntroductionSpace heaters Flue System Approvals Model Flue Termination ApprovalsIdentifying Flue Components DVP90ST Heat & Glo SL-550TRSI-AUE 2079-902 Rev. B 7/06 USE SL D-SERIES Vertical FlueingMaximum 10.97M USE DVP-SERIES Components onlyUSE SL D-SERIES Components Only Flueing with ONE 1 90 Elbow USE DVP-SERIES ComponentsFlueing with TWO 2 90 Elbows + H FT. MFT. V M FT. HM Flueing with TWO 2 90 Elbows Flueing with Three 3 90 Elbows + H1 FT. MFlueing with Three 3 90 Elbows Installing Flue Components Nent and the Outer Heater Wrap Assembling Flue ComponentsInstall Support Brackets Continue Adding Flue ComponentsInstalling Support Brackets Hole and New Framing MembersFlue Termination Connecting the GAS Supply Gas Supply LineIgnition System Wiring Shock RiskBlower FAN Finishing CeilingInstaller Testing Installing the TrimPilot Assembly 3 4 5 6 7 Heat & Glo SL-550TRSI-AUE 2079-902 Rev. B 7/06 Heat & Glo SL-550TRSI-AUE 2079-902 Rev. B 7/06 Operating Trol Wiring System of this UnitOperating Instructions This Appliance MAY Exhibit a Slight Carbon DepositionSafety & Lighting Information Do not Connect 220/240 VAC to the Control ValveServicing and Maintenance Glass Door When IT is HOTFAN Operation Adjustments and Replacement Parts Removal of Components for ServiceParts Replacement Removal of Covers for ServicingMaintenance Tasks Doors Inspect Maintenance TasksTroubleshooting Electronic Ignition SystemPan beneath the burne Log set assembly SL-550TRSI-AUESL-550TRSI-AUE Service Parts List Heat & Glo SL-550TRSI-AUE 2079-902 Rev. B 7/06 Melbourne