Safety Alert Key:
•DANGER! Indicates a hazardous situation which, if not avoided will result in death or serious injury.
•WARNING! Indicates a hazardous situation which, if not avoided could result in death or serious injury.
•CAUTION! Indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.
•NOTICE: Used to address practices not related to personal injury.
Table of Contents
A. | Congratulations | 2 |
B. | Warranty | 5 |
1 Listing and Code Approvals
A. | Appliance Certification | 7 |
B. | Tempered Glass Specifications | 7 |
C. | BTU Specifications | 7 |
D. | High Altitude Installations | 7 |
E. | 7 | |
F. | Combustible Materials Specification | 7 |
G. | Electrical Codes | 7 |
H. | Requirements for |
|
| the Commonwealth of Massachusetts | 8 |
User Guide
2 Operating Instructions
A. | Gas Fireplace Safety | 9 |
B. | Your Fireplace | 9 |
C. | Fan Kit (optional) | 10 |
D. | Clear Space | 10 |
E. | Decorative Doors and Fronts | 10 |
F. | Fixed Glass Assembly | 10 |
G. | Remote Controls, Wall Controls and |
|
| Wall Switches | 10 |
H. | Before Lighting Fireplace | 10 |
I. | Lighting Instructions (IPI) | 11 |
J. | Lighting Instructions (Standing Pilot) | 12 |
K. | After Fireplace is Lit | 13 |
L. | Frequently Asked Questions | 13 |
3 Maintenance and Service
A. | Maintenance | 14 |
B. | Maintenance | 15 |
Installer Guide
4 Getting Started
A. | Typical Appliance System | 16 |
B. | Design and Installation Considerations | 17 |
C. Tools and Supplies Needed | 17 | |
D. Inspect Appliance and Components | 17 |
5 Framing and Clearances
A. | Select Appliance Location | 18 |
B. | Construct the Appliance Chase | 19 |
C. | Clearances | 19 |
D. | Mantel and Wall Projections | 20 |
6 Termination Locations
A. Vent Termination Minimum Clearances | 21 |
7 Vent Information and Diagrams
A. | Approved Pipe | 23 |
B. | Vent Table Key | 23 |
C. | Use of Elbows | 23 |
D. | Measuring Standards | 23 |
E. | Vent Diagrams | 24 |
F. | Install Vertical Termination Baffle | 33 |
8 Vent Clearances and Framing
A. | Pipe Clearances to Combustibles | 34 |
B. | Wall Penetration Framing | 34 |
C. | Install the Ceiling Firestop | 35 |
D. | Install Attic Insulation Shield | 36 |
9 Appliance Preparation
A. | Convert from Top Vent to Rear Vent | 37 |
B. | Secure and Level the Appliance | 41 |
10 Install Vent Pipe
A. Assemble Pipe Sections (DVP Only) | 42 | |
B. | Assemble Vent Sections (SLP Only) | 43 |
C. Assemble Slip Sections | 43 | |
D. Secure the Vent Sections | 44 | |
E. | Disassemble Vent Sections | 44 |
F.Install Decorative Ceiling Components (SLP only) 45
G. | Install Metal Roof Flashing | 46 |
H. | Assemble and Install Storm Collar | 46 |
I. | Install | 47 |
J. | Install Vertical Termination Cap | 48 |
K. | Install Decorative Wall Components (SLP only) | 48 |
L. | Heat Shield Requirements for |
|
| Horizontal Termination | 48 |
M. | Install Horizontal Termination Cap | 49 |
11 Gas Information
A. | Fuel Conversion | 50 |
B. | Gas Pressure | 50 |
C. | Gas Connection | 50 |
D. | High Altitude Installations | 50 |
12 Electrical Information
A. | Wiring Requirements | 51 |
B. | Standing Pilot Ignition System Wiring | 51 |
C. | Intellifire Ignition System Wiring | 51 |
D. | Optional Accessories Requirements | 51 |
E. | Electrical Service and Repair | 52 |
F. | Junction Box Installation | 53 |
G. | Wall Switch Installation for Fan (Optional) | 53 |
Heatilator • Caliber CD Series • | 3 |