B. Assemble Vent Sections (SLP Only)

To attach the first vent component to the starting collars of the appliance

Attach an SLP-DVP24 adapter to the starting collar of the appliance.

Lock the vent components into place by sliding the pipe section onto the collar.

Align the seam of the pipe and seam of collar to allow engagement. Rotate the vent component to lock into place. Use this procedure for all vent components. See Figure 10.5.

Slide the gasket over the first vent section and place it flush to the appliance. This will prevent cold air infiltration. High temperature caulk may be used to hold the part in place.

Continue adding vent components, locking each succeeding component into place.

Ensure that each succeeding vent component is securely fitted and locked into the preceding component.

Commercial, Multi-family (Multi-level exceeding two stories), or High-Rise Applications

For installation into a commercial, multi-family (multi-level exceeding two stories) or high-rise applications: All outer pipe joints must be sealed with high temperature silicone, including the slip section that connects directly to the horizontal termination cap.

Apply a bead of silicone sealant inside the female outer pipe joint prior to joining sections. See Figure 10.1

Only outer pipes need to be sealed. All unit collar, pipe, slip section, elbow and cap outer flues shall be sealed in this manner, unless otherwise stated.

WARNING! Risk of Fire or Explosion! DO NOT break silicone seals on slip sections. Use care when removing termination cap from slip pipe. If slip section seals are bro- ken during removal of the termination cap, vent may leak.

2 - Rotate

1 - Align Seams

Figure 10.5 Adding Venting Components

C. Assemble Slip Sections

WARNING! Risk of Fire or Asphyxiation! Overlap pipe sections at least 1 1/2 in. (38 mm). Secure slip sections with two screws which must not exceed 1/2 in. (13 mm) in length. Use the pilot holes. Pipe could separate if not properly joined.

Slide the inner flue of the slip section into the inner flue of the pipe section and the outer flue of the slip section over the outer flue of the pipe section. See Figure 10.6.

Slide together to the desired length.

Figure 10.6 Slip Section Pilot Holes

Maintain a 1-1/2 in. (38 mm) overlap between the slip section and the pipe section.

Secure the pipe and slip section with two screws no longer than 1/2 in. (13 mm), using the pilot holes in the slip section. See Figure 10.7.

Figure 10.7 Screws into Slip Section

Continue adding pipe as necessary following instructions in “Assembling Pipe Sections.”

NOTICE: If slip section is too long, the inner and outer flues of the slip section can be cut to the desired length.

NOTICE: When installing a vent system with an HRC termination cap, all pipe system joints shall be sealed using a high temperature silicone sealant.

Apply a bead of silicone sealant inside the female outer pipe joint prior to joining sections.

Only outer pipes are sealed, sealing the inner flue is not required.

All unit collar, pipe, slip section, elbow and cap outer flues shall be sealed.

Heatilator • Caliber CD Series • 4040-263 Rev N • 11/08

43

Image 43
Contents What to do if you smell gas Installation and OperationModels CD4236R CD4842R CD4236LR CD4842LR CD4236IR CD4842IR Direct Vent Gas ApplianceHomeowner Reference Information CongratulationsInstaller Guide Table of ContentsUser Guide Reference Materials Appliance SetupTroubleshooting FinishingCONDITIONS, Exclusions & Limitation of Liability Warranty Hearth & Home Technologies Limited WarrantyWarranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Operating Instructions Gas Fireplace SafetyYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalLighting Instructions IPI For Your Safety Read Before LightingStanding LightingPilot After Fireplace is Lit Frequently Asked QuestionsDoors, Surrounds, Fronts Maintenance and ServiceMaintenance Tasks-Homeowner Remote ControlMaintenance Tasks-Qualified Service Technician Typical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsSelect Appliance Location Framing and ClearancesModel # Clearances Construct the Appliance ChaseRough Opening Model Width Height Depth Mantels Mantel and Wall ProjectionsMantel Legs or Wall Projections Vent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Use of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyTop Vent Horizontal Termination Vent DiagramsOne Elbow Two Elbows Two 45 Elbows replacing One 90 ElbowMin Max +H 2 max +H 2+H 3 max Three Elbows Installed VerticallyNo Elbow Top Vent Vertical Termination12 ft 3.66 m min 60 ft 18.29 m max One 45 Elbow Rear Vent Horizontal TerminationTwo Elbows Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min 60 ft 18.29 m max 17 Flat Baffle Install Vertical Termination BaffleCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingInstalling Ceiling Firestop Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Convert from Top Vent to Rear Vent Appliance PreparationOuter Collar, Remove Four Screws 11 Place Outer Collar on Rear of Appliance 16 Cover Plate-Replace 20 Proper Positioning, Leveling And Securing Of An Secure and Level the ApplianceAssemble Pipe Sections Install Vent PipeAttach Pipe to the Firebox Assembly Assemble Pipe Sections DVP OnlyAssemble Slip Sections Assemble Vent Sections SLP OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingCaulk SLP-FS Install RF4-8Install Decorative Wall Components SLP only Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Interior Install Horizontal Termination CapGas Connection Gas InformationFuel Conversion Gas PressureOptional Accessories Requirements Wiring RequirementsStanding Pilot Ignition System Wiring Intellifire Ignition System WiringWSK-MLT-HTL Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingCombustible Appliance Setup Removing Fixed Glass Assembly Install Trim and/or SurroundInstall Hood Air Shutter SettingSymptom Possible Causes Corrective Action TroubleshootingStanding Pilot Ignition System Symptom Possible Cause Corrective Action Intellifire Ignition System Will not ignite. If the pilot Reference Materials Appliance Dimension DiagramDVP Vent Components Vent Components DiagramsBEK DVP-BEK2 DVP-TVHW Horizontal Termination Cap DVP-TRAPDVP-HRC-SS Effective Adapter SL-2DVPCD4236IR, CD4236ILR Service PartsCD4236R, CD4236LR ServiceIPI Valve Assembly CD4842IR, CD4842ILR CD4842R, CD4842LR IPI Valve Assembly Optional Components FFCM36BN Model # DescriptionThis page intentionally left blank This page intentionally left blank This page intentionally left blank Contact Information