Hearth and Home Technologies CD4236MLR After Fireplace is Lit, Frequently Asked Questions

Page 12

K. After Fireplace is Lit

Initial Break-in Procedure

The fireplace should be run three to four hours continuously on high.

Turn the fireplace off and allow it to completely cool.

Remove fixed glass assembly. See Section 14.K.

Clean fixed glass assembly. See Section 3.A.

Replace the fixed glass assembly and run continuously on high an additional 12 hours.

This cures the materials used to manufacture the fire- place.

NOTICE! Open windows for air circulation during fireplace break-in.

Some people may be sensitive to smoke and odors.

Smoke detectors may activate.

L.Frequently Asked Questions

ISSUE

SOLUTIONS

 

 

Condensation on the glass

This is a result of gas combustion and temperature variations. As the fireplace warms, this

condensation will disappear.

 

 

 

Blue flames

This is a result of normal operation and the flames will begin to yellow as the fireplace is al-

lowed to burn for 20 to 40 minutes.

 

 

 

 

When first operated, this fireplace may release an odor for the first several hours. This is

Odor from fireplace

caused by the curing of materials from manufacturing. Odor may also be released from

finishing materials and adhesives used near the fireplace. These circumstances may require

 

 

additional curing related to the installation environment.

 

 

Film on the glass

This is a normal result of the curing process of the paint and logs. Glass should be cleaned

within 3 to 4 hours of initial burning. A non-abrasive cleaner such as gas appliance glass

 

 

cleaner may be necessary. See your dealer.

 

 

 

Noise is caused by metal expanding and contracting as it heats up and cools down, similar to

Metallic noise

the sound produced by a furnace or heating duct. This noise does not affect the operation or

 

longevity of the fireplace.

 

 

12

Heatilator • Caliber Mesh CD Series-SIT Valve • 4040-849 Rev J • 06/08

Image 12
Contents Installation and Operation Models CD4236MR CD4842MRDirect Vent Gas Appliance What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents Installer GuideUser Guide Appliance Setup TroubleshootingReference Materials Gas Appliance Fireplace Limited Lifetime Warranty Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massachusetts Gas Fireplace Safety Operating InstructionsYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceFor Your Safety Read Before Lighting Lighting Instructions IPILighting StandingPilot Frequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerRemote Control Doors, Surrounds, FrontsMaintenance Tasks-Qualified Service Technician Getting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Framing and Clearances Select Appliance LocationModel # Construct the Appliance Chase ClearancesMantel and Wall Projections MantelsMantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesMinimum Clearances for Termination Vent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal TerminationOne Elbow Two 45 Elbows replacing One 90 Elbow Two ElbowsInstalled Vertically Three ElbowsTop Vent Vertical Termination No Elbow12 ft 3.66 m min 60 ft 18.29 m max Rear Vent Horizontal Termination One 45 ElbowTwo Elbows Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min 60 ft 18.29 m max Install Vertical Termination Baffle 17 Flat BaffleVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Installing Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Convert from Top Vent to Rear VentOuter Collar, Remove Four Screws 11 Place Outer Collar on Rear of Appliance 16 Cover Plate-Replace Secure and Level the Appliance 20 Proper Positioning, Leveling And Securing Of AnInstall Vent Pipe Attach Pipe to the Firebox AssemblyAssemble Pipe Sections DVP Only Assemble Pipe SectionsAssemble Vent Sections SLP Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall RF4-8 SLP-FSInstall Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap InteriorGas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Standing Pilot Ignition System WiringIntellifire Ignition System Wiring Optional Accessories RequirementsElectrical Service and Repair WSK-MLT-HTLJunction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialCombustible Appliance Setup Install the Log Assembly Removing Fixed Glass AssemblyReplacing Fixed Glass Assembly Install Trim Install Clean Face ComponentsInstall Hood Install Top Latch CoverAir Shutter Setting Install Bottom Latch CoverInstall Firescreen Assembly Troubleshooting Standing Pilot Ignition SystemSymptom Possible Cause Corrective Action Intellifire Ignition System Will not ignite. If the pilot Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP Vent ComponentsBEK DVP-BEK2 DVP-TVHW DVP-TRAP DVP-HRC-SS Effective SL-2DVP AdapterService #22 Log/Grate AssemblyParts CD4842M Series Parts Service CD4842M SeriesOptional Components Model # Description Contact Information