Hearth and Home Technologies CD4842MLR Assemble Vent Sections SLP Only, Assemble Slip Sections

Page 42

B. Assemble Vent Sections (SLP Only)

To attach the first vent component to the starting collars of the appliance

Attach an SLP-DVP24 adapter to the starting collar of the appliance.

Lock the vent components into place by sliding the pipe section onto the collar.

Align the seam of the pipe and seam of collar to allow engagement. Rotate the vent component to lock into place. Use this procedure for all vent components. See Figure 10.5.

Slide the gasket over the first vent section and place it flush to the appliance. This will prevent cold air infiltration. High temperature caulk may be used to hold the part in place.

Continue adding vent components, locking each succeeding component into place.

Ensure that each succeeding vent component is securely fitted and locked into the preceding component.

Commercial, Multi-family (Multi-level exceeding two stories), or High-Rise Applications

For Installation into a commercial, multi-family (multi-level exceeding two stories) or high-rise applications: All outer pipe joints must be sealed with high temperature silicone, including the slip section that connects directly to the horizontal termination cap.

Apply a bead of silicone sealant inside the female outer pipe joint prior to joining sections. See Figure 10.1

Only outer pipes need to be sealed. All unit collar, pipe, slip section, elbow and cap outer flues shall be sealed in this manner, unless otherwise stated.

WARNING! Risk of Fire or Explosion! DO NOT break silicone seals on slip sections. Use care when removing termination cap from slip pipe. If slip section seals are bro- ken during removal of the termination cap, vent may leak.

2 - Rotate

1 - Align Seams

Figure 10.5 Adding Venting Components

C. Assemble Slip Sections

WARNING! Risk of Fire or Asphyxiation! Overlap pipe sections at least 1 1/2 in. (38 mm). Secure slip sections with two screws which must not exceed 1/2 in. (13 mm) in length. Use the pilot holes. Pipe could separate if not properly joined.

Slide the inner flue of the slip section into the inner flue of the pipe section and the outer flue of the slip section over the outer flue of the pipe section. See Figure 10.6.

Slide together to the desired length.

Figure 10.6 Slip Section Pilot Holes

Maintain a 1-1/2 in. (38 mm) overlap between the slip section and the pipe section.

Secure the pipe and slip section with two screws no longer than 1/2 in. (13 mm), using the pilot holes in the slip section. See Figure 10.7.

Figure 10.7 Screws into Slip Section

Continue adding pipe as necessary following instructions in “Assembling Pipe Sections.”

NOTICE: If slip section is too long, the inner and outer flues of the slip section can be cut to the desired length.

NOTICE: When installing a vent system with an HRC termination cap, all pipe system joints shall be sealed using a high temperature silicone sealant.

Apply a bead of silicone sealant inside the female outer pipe joint prior to joining sections.

Only outer pipes are sealed, sealing the inner flue is not required.

All unit collar, pipe, slip section, elbow and cap outer flues shall be sealed.

42

Heatilator • Caliber Mesh CD Series-SIT Valve • 4040-849 Rev J • 06/08

Image 42
Contents Direct Vent Gas Appliance Installation and OperationModels CD4236MR CD4842MR What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents Installer GuideUser Guide Appliance Setup TroubleshootingReference Materials Gas Appliance Fireplace Limited Lifetime Warranty Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massachusetts Gas Fireplace Safety Operating InstructionsYour Fireplace Fan Kit optional Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceFor Your Safety Read Before Lighting Lighting Instructions IPILighting StandingPilot Frequently Asked Questions After Fireplace is LitRemote Control Maintenance and ServiceMaintenance Tasks-Homeowner Doors, Surrounds, FrontsMaintenance Tasks-Qualified Service Technician Getting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Framing and Clearances Select Appliance LocationModel # Construct the Appliance Chase ClearancesMantel and Wall Projections MantelsMantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesMinimum Clearances for Termination Vent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsVent Diagrams Top Vent Horizontal TerminationOne Elbow Two 45 Elbows replacing One 90 Elbow Two ElbowsInstalled Vertically Three ElbowsTop Vent Vertical Termination No Elbow12 ft 3.66 m min 60 ft 18.29 m max Rear Vent Horizontal Termination One 45 ElbowTwo Elbows Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min 60 ft 18.29 m max Install Vertical Termination Baffle 17 Flat BaffleWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Installing Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Convert from Top Vent to Rear VentOuter Collar, Remove Four Screws 11 Place Outer Collar on Rear of Appliance 16 Cover Plate-Replace Secure and Level the Appliance 20 Proper Positioning, Leveling And Securing Of AnAssemble Pipe Sections DVP Only Install Vent PipeAttach Pipe to the Firebox Assembly Assemble Pipe SectionsAssemble Vent Sections SLP Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall RF4-8 SLP-FSInstall Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap InteriorGas Pressure Gas InformationFuel Conversion Gas ConnectionIntellifire Ignition System Wiring Wiring RequirementsStanding Pilot Ignition System Wiring Optional Accessories RequirementsElectrical Service and Repair WSK-MLT-HTLJunction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialCombustible Appliance Setup Install the Log Assembly Removing Fixed Glass AssemblyReplacing Fixed Glass Assembly Install Hood Install TrimInstall Clean Face Components Install Top Latch CoverAir Shutter Setting Install Bottom Latch CoverInstall Firescreen Assembly Troubleshooting Standing Pilot Ignition SystemSymptom Possible Cause Corrective Action Intellifire Ignition System Will not ignite. If the pilot Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP Vent ComponentsBEK DVP-BEK2 DVP-TVHW DVP-TRAP DVP-HRC-SS Effective SL-2DVP AdapterService #22 Log/Grate AssemblyParts CD4842M Series Parts Service CD4842M SeriesOptional Components Model # Description Contact Information