8 Vent Clearances and Framing

A. Pipe Clearances to Combustibles

WARNING! Risk of Fire! Maintain air space clearance to vent. DO NOT pack insulation or other combustibles:

Between ceiling firestops

Between wall shield firestops

Around vent system

Failure to keep insulation or other material away from vent pipe may cause over heating and fire.

Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm).

DVP heat shield - designed to be used on a wall 4 in. to 7-1/4 in. (102 mm to 184

mm)thick.

If wall thickness is less than 4 in. the existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. an extended heat shield will be required.

SLP heat shield - designed to be used on a wall 4-3/8 in. to 7-5/8 in. (111 mm to 194 mm thick).

If wall thickness is less than 4-3/8 the existing heat shields must be field trimmed. If wall thickness is greater than 7-5/8 in. an extended heat shield will be required.

(DVP Pipe Shown)

B. Wall Penetration Framing

Combustible Wall Penetration

Whenever a combustible wall is penetrated, you must frame a hole for the wall shield firestop(s). The wall shield firestop maintains minimum clearances and prevents cold air infiltration.

The opening must be framed on all four sides using the same size framing materials as those used in the wall construction.

SLP pipe - A wall shield firestop must be placed on each side of an interior wall. A minimum 1 1/2 in. (38 mm) overlap of attached heat shields must be maintained.

DVP pipe - A wall shield firestop is required on one side only on interior walls. If your local inspector requires a wall shield firestop on both sides, then both wall shield firestops must have a heat shield attached to them.

See Section 10.L. for information for regarding the installation of a horizontal termination cap.

3 in. (76 mm) top clearance

1 in. (25 mm) clearance around vertical sections

Heat

Shield

Wall

Shield

Firestop

3 in. (76 mm) top clearance *

Heat

Shield

1 in. (25 mm) clearance bottom & sides

Non-Combustible Wall Penetration

If the hole being penetrated is surrounded by noncombus- tible materials such as concrete, a hole with diameter one in. greater than the pipe is acceptable.

Whenever a non-combustible wall is penetrated, the wall shield firestop is only required on one side and no heat shield is necessary.

WALL

Heat

Shield

Wall

Shield

Firestop

3 in. (76 mm) top clearance *

Heat

Shield

1 in. (25 mm) clearance bottom & sides

 

10 in.

Vent framing hole.

 

 

12 in.

 

DO NOT PACK WITH

 

INSULATION OR OTHER

MATERIAL.

The center of the framing hole is

1 in. (25mm) above the center of the horizontal vent pipe.

WALL

* When using SLP pipe, minimum clearances from the vent pipe to combustible materi-

als at inside wall firestops are:Top: 2-1/2 in. (64 mm) Bottom: 1/2 in. (13 mm) Sides: 1 in. (25 mm)

Figure 8.1 Horizontal Venting Clearances To Combustible Materi- als

A*

B*

Framing should be constructed of 2 X 4 lumber or heavier.

*Measured to center of pipe.

 

 

D

E

Model

 

Top Vent

Rear Vent

CD4236M

inches

42 1/4

27 1/4

mm

1073

692

 

 

 

 

 

CD4842M

inches

48 1/4

27 1/4

 

 

 

mm

1226

692

 

Figure 8.2 Wall Penetration

Heatilator • Caliber Mesh CD Series-SIT Valve • 4040-849 Rev J • 06/08

33

Image 33
Contents Models CD4236MR CD4842MR Installation and OperationDirect Vent Gas Appliance What to do if you smell gasHomeowner Reference Information CongratulationsTable of Contents Installer GuideUser Guide Appliance Setup TroubleshootingReference Materials Limited Lifetime Warranty Gas Appliance Fireplace Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massachusetts Gas Fireplace Safety Operating InstructionsYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Clear SpaceLighting Instructions IPI For Your Safety Read Before LightingLighting StandingPilot After Fireplace is Lit Frequently Asked QuestionsMaintenance Tasks-Homeowner Maintenance and ServiceRemote Control Doors, Surrounds, FrontsMaintenance Tasks-Qualified Service Technician Typical Appliance System Getting StartedDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Framing and Clearances Select Appliance LocationModel # Clearances Construct the Appliance ChaseMantel and Wall Projections MantelsMantel Legs or Wall Projections Vent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Approved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal TerminationOne Elbow Two Elbows Two 45 Elbows replacing One 90 ElbowThree Elbows Installed VerticallyNo Elbow Top Vent Vertical Termination12 ft 3.66 m min 60 ft 18.29 m max One 45 Elbow Rear Vent Horizontal TerminationTwo Elbows Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min 60 ft 18.29 m max 17 Flat Baffle Install Vertical Termination BafflePipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationInstalling Ceiling Firestop Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Convert from Top Vent to Rear Vent Appliance PreparationOuter Collar, Remove Four Screws 11 Place Outer Collar on Rear of Appliance 16 Cover Plate-Replace 20 Proper Positioning, Leveling And Securing Of An Secure and Level the ApplianceAttach Pipe to the Firebox Assembly Install Vent PipeAssemble Pipe Sections DVP Only Assemble Pipe SectionsAssemble Slip Sections Assemble Vent Sections SLP OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingSLP-FS Install RF4-8Install Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Interior Install Horizontal Termination CapFuel Conversion Gas InformationGas Pressure Gas ConnectionStanding Pilot Ignition System Wiring Wiring RequirementsIntellifire Ignition System Wiring Optional Accessories RequirementsWSK-MLT-HTL Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFinishing Facing MaterialCombustible Appliance Setup Install the Log Assembly Removing Fixed Glass AssemblyReplacing Fixed Glass Assembly Install Clean Face Components Install TrimInstall Hood Install Top Latch CoverAir Shutter Setting Install Bottom Latch CoverInstall Firescreen Assembly Standing Pilot Ignition System TroubleshootingSymptom Possible Cause Corrective Action Intellifire Ignition System Will not ignite. If the pilot Reference Materials Appliance Dimension DiagramDVP Vent Components Vent Components DiagramsBEK DVP-BEK2 DVP-TVHW DVP-TRAP DVP-HRC-SS Effective Adapter SL-2DVPService #22 Log/Grate AssemblyParts CD4842M Series Parts CD4842M Series ServiceOptional Components Model # Description Contact Information