D. Install Attic Insulation Shield

WARNING! Fire Risk. DO NOT allow loose materials or insulation to touch vent. Hearth & Home Technologies Inc. requires the use of an attic shield.

The National Fuel Gas Code ANSI Z223.1 and NFPA 54 requires an attic shield constructed of 26 gauge minimum metal that extends at least 2 in. (51 mm) above insulation.

Attic shields must meet specified clearance and be se- cured in place.

Flat Ceiling Installation

Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

Wrap shield around pipe if pipe is already installed in area to be insulated.

Match the three holes in each side and fasten with three screws to form a tube.

Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90° to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop.

Bend all tabs inward 90° around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance.

Vaulted Ceiling Installation

The attic insulation shield has been laser-etched with ceiling pitch cut lines to make field trimming easier.

Remove one shield from box.

NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield.

Cut the attic insulation shield (if application is for vaulted ceiling) using a laser-etched cut line, to fit your ceiling pitch. Snip cut edge to recreate 1 in. bend tabs all the way around the bottom.

Wrap shield around pipe if pipe is already installed in area to be insulated.

Match the three holes in each side and fasten with three screws to form a tube.

Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop.

Bend the remaining bottom tabs inward 90° to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop.

Bend all tabs inward 90° around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance.

 

Laser-etched

Bend all tabs inward

cut lines

Insert 3

90° to maintain

screws

clearance and

 

 

Bend 4 tabs

prevent insulation

 

 

from falling inside

 

 

inward 90°

 

 

 

to maintain

 

 

 

clearance

Figure 8.5 Attic Insulation Shield

Heatilator • Caliber Mesh CD Series-SIT Valve • 4040-849 Rev J • 06/08

35

Image 35
Contents What to do if you smell gas Installation and OperationModels CD4236MR CD4842MR Direct Vent Gas ApplianceHomeowner Reference Information CongratulationsUser Guide Table of ContentsInstaller Guide Reference Materials Appliance SetupTroubleshooting Limited Lifetime Warranty Gas Appliance Fireplace Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massachusetts Your Fireplace Gas Fireplace SafetyOperating Instructions Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalLighting Instructions IPI For Your Safety Read Before LightingPilot LightingStanding After Fireplace is Lit Frequently Asked QuestionsDoors, Surrounds, Fronts Maintenance and ServiceMaintenance Tasks-Homeowner Remote ControlMaintenance Tasks-Qualified Service Technician Typical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Model # Framing and ClearancesSelect Appliance Location Clearances Construct the Appliance ChaseMantel Legs or Wall Projections Mantel and Wall ProjectionsMantels Vent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Use of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyOne Elbow Vent DiagramsTop Vent Horizontal Termination Two Elbows Two 45 Elbows replacing One 90 ElbowThree Elbows Installed VerticallyNo Elbow Top Vent Vertical Termination12 ft 3.66 m min 60 ft 18.29 m max One 45 Elbow Rear Vent Horizontal TerminationTwo Elbows Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min 60 ft 18.29 m max 17 Flat Baffle Install Vertical Termination BaffleCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingInstalling Ceiling Firestop Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Convert from Top Vent to Rear Vent Appliance PreparationOuter Collar, Remove Four Screws 11 Place Outer Collar on Rear of Appliance 16 Cover Plate-Replace 20 Proper Positioning, Leveling And Securing Of An Secure and Level the ApplianceAssemble Pipe Sections Install Vent PipeAttach Pipe to the Firebox Assembly Assemble Pipe Sections DVP OnlyAssemble Slip Sections Assemble Vent Sections SLP OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingSLP-FS Install RF4-8Heat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only Interior Install Horizontal Termination CapGas Connection Gas InformationFuel Conversion Gas PressureOptional Accessories Requirements Wiring RequirementsStanding Pilot Ignition System Wiring Intellifire Ignition System WiringWSK-MLT-HTL Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationCombustible FinishingFacing Material Appliance Setup Replacing Fixed Glass Assembly Install the Log AssemblyRemoving Fixed Glass Assembly Install Top Latch Cover Install TrimInstall Clean Face Components Install HoodInstall Firescreen Assembly Air Shutter SettingInstall Bottom Latch Cover Standing Pilot Ignition System TroubleshootingSymptom Possible Cause Corrective Action Intellifire Ignition System Will not ignite. If the pilot Reference Materials Appliance Dimension DiagramDVP Vent Components Vent Components DiagramsBEK DVP-BEK2 DVP-TVHW DVP-TRAP DVP-HRC-SS Effective Adapter SL-2DVPParts Service#22 Log/Grate Assembly CD4842M Series Parts CD4842M Series ServiceOptional Components Model # Description Contact Information