Hearth and Home Technologies CD4236MILR Reference Materials, Appliance Dimension Diagram

Page 62

16 Reference Materials

A. Appliance Dimension Diagram

Dimensions are actual appliance dimensions. Use for reference only. For framing dimensions and clearances refer to Section 3.

Gas Line

Access

3 in.

(76 mm)

6-1/2 in.

(165 mm)

27-1/4 in.

(692 mm)

C

23 in.

(584 mm)

15-1/4 in.

(387 mm)

A

 

 

 

 

 

 

Alternative

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gas Line

 

 

 

 

 

 

 

 

 

 

 

Access

 

 

 

 

 

 

 

33-1/2 in.

Electrical

 

38-1/2 in.

 

 

(851 mm)

 

(978 mm)

 

 

Access

 

 

 

 

 

 

 

 

 

 

 

 

38-1/4 in.

 

 

 

 

 

 

 

 

(972 mm)

 

 

 

2 in.

 

 

 

 

 

 

 

 

 

 

(51 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B

1-1/2 in.

2-3/8 in.

(38 mm)

 

 

 

(60 mm)

5-7/8 in.

14-1/8 in.

(149 mm)

(365 mm)

 

Model #

A

B

C

CD4236M

in.

41

36

24

 

 

 

 

 

 

mm

1041

914

616

CD4842M

in.

47

42

30

 

 

 

 

 

 

mm

1194

1067

768

Figure 16.1 Appliance Dimensions

62

Heatilator • Caliber Mesh CD Series-SIT Valve • 4040-849 Rev J • 06/08

Image 62
Contents Direct Vent Gas Appliance Installation and OperationModels CD4236MR CD4842MR What to do if you smell gasCongratulations Homeowner Reference InformationUser Guide Table of ContentsInstaller Guide Reference Materials Appliance SetupTroubleshooting Gas Appliance Fireplace Limited Lifetime Warranty Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massachusetts Your Fireplace Gas Fireplace SafetyOperating Instructions Fan Kit optional Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceFor Your Safety Read Before Lighting Lighting Instructions IPIPilot LightingStanding Frequently Asked Questions After Fireplace is LitRemote Control Maintenance and ServiceMaintenance Tasks-Homeowner Doors, Surrounds, FrontsMaintenance Tasks-Qualified Service Technician Getting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Model # Framing and ClearancesSelect Appliance Location Construct the Appliance Chase ClearancesMantel Legs or Wall Projections Mantel and Wall ProjectionsMantels Termination Locations Vent Termination Minimum ClearancesMinimum Clearances for Termination Vent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsOne Elbow Vent DiagramsTop Vent Horizontal Termination Two 45 Elbows replacing One 90 Elbow Two ElbowsInstalled Vertically Three ElbowsTop Vent Vertical Termination No Elbow12 ft 3.66 m min 60 ft 18.29 m max Rear Vent Horizontal Termination One 45 ElbowTwo Elbows Rear Vent Vertical Termination Min Ft 1.83 m max 12 ft 3.66 m min 60 ft 18.29 m max Install Vertical Termination Baffle 17 Flat BaffleWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Installing Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Convert from Top Vent to Rear VentOuter Collar, Remove Four Screws 11 Place Outer Collar on Rear of Appliance 16 Cover Plate-Replace Secure and Level the Appliance 20 Proper Positioning, Leveling And Securing Of AnAssemble Pipe Sections DVP Only Install Vent PipeAttach Pipe to the Firebox Assembly Assemble Pipe SectionsAssemble Vent Sections SLP Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall RF4-8 SLP-FSHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only Install Horizontal Termination Cap InteriorGas Pressure Gas InformationFuel Conversion Gas ConnectionIntellifire Ignition System Wiring Wiring RequirementsStanding Pilot Ignition System Wiring Optional Accessories RequirementsElectrical Service and Repair WSK-MLT-HTLJunction Box Installation Wall Switch Installation for Fan OptionalCombustible FinishingFacing Material Appliance Setup Replacing Fixed Glass Assembly Install the Log AssemblyRemoving Fixed Glass Assembly Install Hood Install TrimInstall Clean Face Components Install Top Latch CoverInstall Firescreen Assembly Air Shutter SettingInstall Bottom Latch Cover Troubleshooting Standing Pilot Ignition System Symptom Possible Cause Corrective Action Intellifire Ignition System Will not ignite. If the pilot Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP Vent ComponentsBEK DVP-BEK2 DVP-TVHW DVP-TRAP DVP-HRC-SS Effective SL-2DVP AdapterParts Service#22 Log/Grate Assembly CD4842M Series Parts Service CD4842M SeriesOptional Components Model # Description Contact Information