Hearth and Home Technologies SAPPH-D-CWL, 839-1390, 839-1440, 839-1460 owner manual Cathedral Ceiling

Page 18

2. Cathedral Ceiling

Step 1.

Follow installation Steps 1 and 2 under vertical installation section, page 15.

Step 2.

Using the plumb-bob, mark the center line of the venting system on the ceiling, and drill a small hole through the ceiling and roof at this point. From the roof, locate the drill hole and mark the outline of the cathedral ceiling support box.

Step 3.

Remove shingles or other roof covering as necessary to cut the rectangular hole for the support box. Cut the hole 1/8 in. (3mm) larger than the support box outline.

Step 4.

Lower the support box through the hole in the roof until the bottom of the support box protrudes at least 2 in. (51mm) below the ceiling (Figure 5.16). Align the support box both vertically and horizontally with a level. Temporarily tack the support box in place through the inside walls and into the roof sheathing.

Level

Cathedral Ceiling

Support Box

2 in. (51mm) Min. below finished ceiling

Cut hole 1/8 in. (3mm) greater in size than pattern of support box as it is projected onto roof line

Figure 5.16

Step 5.

Using tin snips, cut the support box from the top corners down to the roofline, and fold the resulting flaps over the roof sheathing (Figure 5.17). Before nailing it to the roof, run a bead of non-hardening mastic around the top edges of the support box to make a seal between it and the roof. Clean out any combustible material from inside the support box.

Figure 5.17

Step 6.

Complete the cathedral ceiling installation by following the same procedures outlined in steps 4 through 8 for vertical installations, page 16.

Step 7.

Place the support clamp (provided with the support box) inside the support box (at the bottom), and secure to the pipe section. The clamp allows the support box to support the weight of the pipe sections. Continue to add pipe sections until you are above the roofline.

Step 8.

Install the black trim collar around the outside of the cathedral ceiling support box (Figure 5.18). The two pieces of the trim collar slide over one another to allow for easy adjustment around the support box. Using the six screws provided, secure the four corners and the overlapping sections of the trim collar to the ceiling. You may want to predrill the holes for the overlapped sections for ease of installation.

Trim Collar

Cathedral

Ceiling

Support Screws

Box

Figure 5.18

Page 18

Quadra-Fire · Sapphire · 250-7233H

September 1, 2008

Image 18
Contents What to do if you smell gas Do not Discard this ManualDo Discardnot Welcome to the Quadra-Fire Family Table of Contents 1Listing and Code Approvals Requirements for the Commonwealth of Massachusetts BELOW. Keep Clear of ALL ObstructionsManufacturer Requirements Getting Started Design & Installation ConsiderationsTools will apply to every installation Tools and Supplies NeededSelecting Appliance Location ClearancesTermination Locations 4Vent Termination Minimum ClearancesAlcove Applications Use of Elbows Vent InformationVenting Components Measuring StandardsHow to Use the Vent Graph Venting Guidelines Exception for Rear Vent KIT, Horizontal InstallationType B Rear Installations for Use with Rear Vent Kit Horizontal TerminationType a Up & Out For installations requiring a vertical rise on the exterior 203mm Vertical Termination Direct Vent PipeStep Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Type a Up & Out Installations for Top Vent Configurations Existing Masonry ChimneyCut and bend flashing as needed to fit Sealant adhesive Flex Liner Flex Coupler Sheet Metal Screws Gas Information Fuel ConversionsConverting to LP Gas Propane Natural GAS Gas Pressures PressureGas Connection Check for GAS LeaksStanding Pilot Ignition System Wiring Recommendation for WireConnecting to the Appliance Wire Size Max. LengthON/OFF Top and Rear Vent Conversion Appliance SetupRemove Shipping Materials At the TOP of the appliance, with exceptions notedReplace Burner Orifice for Horizontal Vent Configurations Grille Cover Plate Installation Accessories059 53 DMS 096 41DMS For Both Quartet and Solitaire Fronts Front InstallationFronts are shipped attached to the face Quartet Door AlignmentHearth Legs Installation Positioning the LogsQty Description Glass Door Assembly Installation Blower Installation Mineral WoolBlower from front Page Blower For TOP or Rear Vent Installations Damper AdjustmentShutter Adjustment Make adjustmentOperating Instructions Before Lighting ApplianceControls For Your Safety Read Before Lighting Lighting ApplianceFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Troubleshooting Symptom Possible Cause Corrective ActionBe Placed in this Opening Maintaining and Servicing Appliance After servicingMaintenance Tasks Inspect Necessary. USE Caution When CLEANING/HANDLING Ceramic BurnerAppliance Dimension Diagram Reference MaterialsVent Components Diagram Mm inner pipe 6-5/8 in mm outer pipeQuadra-Fire · Sapphire · 250-7233H September 1 Vent Components List HHT SL-PTermination Caps & Kits Sapphire Item # DescriptionService Parts cont’d Hinge Assembly Accessories Cast Parts Individual PiecesService and Maintenance Log Date of Service Performed By Description of ServiceWarranty Policy Hearth & Home Technologies Limited Warranty CONDITIONS, Exclusions & Limitation of LiabilityHearth & Home Technologies Limited Warranty Cont’d Sapphire Contact InformationDealer Telephone