Hearth and Home Technologies SAPPH-D-CSB, 839-1390, 839-1440, 839-1460 Alcove Applications

Page 9

 

 

 

 

G

 

 

R

 

 

 

 

v

 

 

 

D

 

 

 

A

H

 

 

 

 

 

 

 

 

 

v

E

 

 

 

 

 

 

 

 

 

 

 

 

 

L

B

 

 

 

U.S.

 

 

 

 

 

 

 

v

 

B

 

 

 

v

B

(3 FT)

 

 

v

 

 

 

 

 

 

 

F

v

 

v

I

M

 

 

 

 

 

 

v

X

 

 

 

 

 

 

 

 

 

 

A

 

 

J or K

M

N

P

Q

(See Note 2)

V

T

V

S

Electrical

S

V

 

Service

 

 

 

 

 

 

 

 

 

 

D*

V

V

= VENT TERMINAL

X = AIR SUPPLY INLET

= AREA WHERE TERMINAL IS NOT PERMITTED

A

=

12 inches

clearances above grade, veran-

K

 

=

3 ft. (U.S.A.)

 

 

 

 

 

 

 

(See Note 1)

da, porch, deck or balcony

 

 

 

6 ft. (Canada)

clearance to a mechanical

 

B

=

12 inches

clearances to window or door

 

 

 

 

 

 

(powered) air supply inlet

 

L**

=

7 ft

clearance

above paved

 

 

 

 

that may be opened, or to per-

 

 

 

 

 

 

 

 

(See Note 1)

sidewalkor a paved driveway

 

 

 

 

manently closed window. (Glass)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

located on public property

 

D*

=

18 inches

vertical clearance to unventilat-

M*** =

18 inches

clearance

under veranda,

 

 

 

 

ed soffit or to ventilated soffit lo-

 

 

 

 

 

 

porch, deck, balcony or over-

 

 

 

 

cated above the terminal

 

 

 

 

 

 

hang

 

 

 

 

 

*30 inches

for vinyl clad soffits and below

 

 

 

42 inches

vinyl

 

 

 

 

 

 

electrical service

S

=

 

6 inches

clearance from sides of

 

 

 

 

 

 

 

F

=

9 inches

clearance to outside corner

 

 

 

 

(See Note 3)

electrical service

 

G

=

6 inches

clearance to inside corner

T

=

 

12 inches

clearance above electrical

 

H

=

3 ft. (Canada)

not to be installed above a gas

 

 

 

 

(See Note 3)

service

 

 

 

 

 

 

meter/regulatorassemblywithin 3

 

Alcove Applications

 

 

 

 

 

 

feet (90cm) horizontally from the

 

N

 

=

6 inches ................. non-vinyl sidewalls

 

 

 

 

center-line of the regulator

 

 

 

 

 

 

 

 

 

 

12 inches ............... vinyl sidewalls

 

 

 

 

 

 

 

 

 

 

I

=

3 ft

clearance to gas service regula-

 

P

 

=

8 ft.

 

 

 

 

 

 

 

 

 

 

 

QMIN

 

RMAX

 

 

 

 

 

tor vent outlet

 

 

 

 

 

 

 

 

 

J

=

9 inches (U.S.A.)

 

 

1 cap

 

3 feet

 

2 x Q ACTUA L

 

 

 

 

 

 

 

 

 

 

 

12 inches (Canada)clearance to non-mechanical air

 

 

2 caps

 

6 feet

 

1 x Q ACTUA L

 

 

 

 

 

supply inlet to building or the

 

 

3 caps

 

9 feet

 

2/3 x Q ACTUA L

 

 

 

 

 

combustion air inlet to any other

 

 

 

 

 

 

 

 

 

 

 

4 caps

 

12 feet

 

1/2 x Q ACTUA L

 

 

 

 

 

appliance

 

 

 

 

 

 

 

 

 

 

 

QMIN = # termination caps x 3 RMAX = (2 / # termination caps) x QACTUAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

**a vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings.

***only permitted if veranda, porch, deck or balcony is fully open on a minimum of 2 sides beneath the floor, or meets Note 2.

NOTE: Local codes or regulations may require different clearances.

NOTE: Termination caps may be hot. Consider their proximity to doors or other traffic areas.

NOTE 1: On private property where termination is less than 7 feet above a sidewalk, driveway, deck, porch, veranda or balcony, use of a listed cap is suggested. (See vents components pages.)

NOTE 2: Termination in an alcove space (spaces only open on one side and without an overhang) are permitted with the dimensions specified for vinyl or non-vinyl siding and soffits. 1. There must be at least 3 feet minimum between termination caps. 2. All mechanical air intakes within 10 feet of a termination cap must be a minimum of 3 feet below the termination cap. 3. All gravity air intakes within 3 feet of a termination cap must be a minimum of 1 foot below the termination cap.

NOTE 3: Location of the vent termination must not interfere with access to the electrical service.

Figure 4.4

WARNING: In the U.S.: Vent system termination is NOT permitted in screened porches. You must follow side wall, overhang and ground clearances as slated in the instructions.

In Canada: Vent system termination is NOT permitted in screened porches. Vent system termination is permitted in porch areas with two or more sides open. You must follow side wall, overhang and ground clearances as stated in the instructions.

Quadra-Fire assumes no responsibility for the improper perfor- mance of the appliance when the venting system does not meet these requirements.

CAUTION: IF EXTERIOR WALLS ARE FINISHED WITH VINYL SIDING, IT IS SUGGESTED THAT A VINYL PROTECTOR KIT BE INSTALLED (part #VPK- DV).

September 1, 2008

Quadra-Fire · Sapphire · 250-7233H

Page 9

Image 9
Contents What to do if you smell gas Do not Discard this ManualDo Discardnot Welcome to the Quadra-Fire Family Table of Contents 1Listing and Code Approvals Requirements for the Commonwealth of Massachusetts BELOW. Keep Clear of ALL ObstructionsManufacturer Requirements Tools will apply to every installation Design & Installation ConsiderationsGetting Started Tools and Supplies NeededClearances Selecting Appliance Location4Vent Termination Minimum Clearances Termination LocationsAlcove Applications Venting Components Vent InformationUse of Elbows Measuring StandardsException for Rear Vent KIT, Horizontal Installation How to Use the Vent Graph Venting GuidelinesType B Rear Installations for Use with Rear Vent Kit Horizontal TerminationType a Up & Out For installations requiring a vertical rise on the exterior 203mm Direct Vent Pipe Vertical TerminationStep Twist-lock the vent cap and seal Cathedral Ceiling Class a Metal Chimney Existing Masonry Chimney Type a Up & Out Installations for Top Vent ConfigurationsCut and bend flashing as needed to fit Sealant adhesive Flex Liner Flex Coupler Sheet Metal Screws Gas Information Fuel ConversionsConverting to LP Gas Propane Natural GAS Pressure Gas PressuresCheck for GAS Leaks Gas ConnectionConnecting to the Appliance Recommendation for WireStanding Pilot Ignition System Wiring Wire Size Max. LengthON/OFF Remove Shipping Materials Appliance SetupTop and Rear Vent Conversion At the TOP of the appliance, with exceptions notedReplace Burner Orifice for Horizontal Vent Configurations Grille Cover Plate Installation Accessories059 53 DMS 096 41DMS Fronts are shipped attached to the face Front InstallationFor Both Quartet and Solitaire Fronts Quartet Door AlignmentHearth Legs Installation Positioning the LogsQty Description Glass Door Assembly Installation Blower Installation Mineral WoolBlower from front Page Blower Shutter Adjustment Damper AdjustmentFor TOP or Rear Vent Installations Make adjustmentOperating Instructions Before Lighting ApplianceControls Lighting Appliance For Your Safety Read Before LightingFrequently Asked Questions Initial Break-in ProcedureAfter Appliance is Lit Symptom Possible Cause Corrective Action TroubleshootingBe Placed in this Opening After servicing Maintaining and Servicing ApplianceNecessary. USE Caution When CLEANING/HANDLING Ceramic Burner Maintenance Tasks InspectReference Materials Appliance Dimension DiagramVent Components Diagram Mm inner pipe 6-5/8 in mm outer pipeQuadra-Fire · Sapphire · 250-7233H September 1 HHT SL-P Vent Components ListTermination Caps & Kits Item # Description SapphireService Parts cont’d Hinge Assembly Cast Parts Individual Pieces AccessoriesDate of Service Performed By Description of Service Service and Maintenance LogCONDITIONS, Exclusions & Limitation of Liability Warranty Policy Hearth & Home Technologies Limited WarrantyHearth & Home Technologies Limited Warranty Cont’d Sapphire Contact InformationDealer Telephone