Baxi Potterton BBU 15 HE manual Site Requirements, Builders Opening Fig, Location

Page 15

 

Builders

 

 

 

 

 

Opening

 

 

(575mm max Valour Dimension

 

5570mm min

Fireplace

560mm min

595mm max

Regalia ONLY )

Opening

 

390mm min

490mm max

584mm min

SURROUND OR FINISHED

WALL FACE

570mm minimum

560mm minimum 590mm maximum

Solid, non combustible hearth

HEARTH

 

 

 

to support the boiler,

 

 

 

as specified in BS 5871.

LEVEL

305mm minimum

Fig. 9

5.0Site Requirements

5.1Builders Opening (Fig. 9)

1.The boiler unit is designed to fit within a standard builders opening, the minimum dimensions of which are as shown.

Height 570mm

Width 584mm

Depth 305mm

2.The opening should be soundly constructed of brick, pre-cast concrete or be a proprietary builders opening.

3.The base of the opening should be sound and non- combustible and must be flat and level.

4.The base of the builders opening should be at the same height as the finished level of the hearth.

IMPORTANT: If a false chimney breast is intended to house the boiler, a simulated builders opening, within the breast, must be provided.

5.The builders opening must not communicate with voids, pipe ducts or spaces other than the room in which the appliance is situated.

5.2Location

1.The appliance must be installed in the living space of a dwelling. It is recommended that it is a ground floor location.

2.Restrictions to the siting of the appliance are covered by BS 5546. The appliance may not be installed in bathrooms or shower rooms. bedrooms or bed sitting rooms.

5.3Fireplace Opening & Surround

1.If a fireplace surround is to be used, it must be centrally placed and have opening sizes as shown in Fig. 9.

5.4Firefont Frame Extension Kit

1.To accommodate the firefront there must be at least 95mm from the surround or finished face to the front of the boiler.

2.If necessary this can be increased by the use of Frame Extension Kits. Each extension increases the effective depth of the opening by 50mm.

3.See the instructions supplied with the firefront for full details.

© Baxi Heating UK Ltd 2009

15

Image 15 Contents
Baxi Bermuda BBU 15 HE 0086 Scheme Members only Installer Notification GuidelinesImportant Installation, Commissioning, Service & Repair LegislationCodes of Practice, most recent version should be used Safe Manual Handling Contents Contents IntroductionDescription Layout Fig General LayoutFlue Kit 10m & 12.5m a Bermuda HE Cbbu 15 HE Technical DataThere is a drain cock supplied in the plumbing kit System DetailsWater Circulating Systems Treatment of Water Circulating SystemsPipework System ControlsStorage Systems Sealed Systems Figs , 7 Sealed Systems Fireplace Opening & Surround Site RequirementsBuilders Opening Fig LocationNo Horizontal Runs are Permitted FlueElectrical Connection Gas Connection VentilationGas Supply Fig Electrical Supply FigCondensate Disposal Fig Condensate Drain GeneralFrom Boiler 500mm Min Total volume of the sump is 1.5 litresCondensate Disposal Condensate Pump OperationBoiler Internal Illustrated Wiring Diagram Boiler Internal WiringInstallation Initial PreparationFlue System Barb ‘C’ Clip Air Cowl Air Duct Collar Ribs Terminal Cap Electrical Connection Siting the BoilerWater Connections Gas ConnectionCompletion & Commissioning CompletionCommissioning the Boiler Test Point Annual Servicing Annual ServicingAnnual Servicing Inspection Spark Generator Fig Electrode Assembly FigChanging Components Changing ComponentsBurner Spark Generator Plug Gas Feed Pipe Injector Fan FigBurner Fig Spark Generator Plug Electrode Fan InjectorGas Valve Fig Injector Gas Valve Earth WireNTC Fig Safety Thermostat FigFloat Switches Fig PCB FigSetting the Gas Valve Setting the Gas Valve CO2 checkFlue Sampling Point Display Control Knobs Fault Finding Initial Fault Finding ChecksError Codes Go to section ‘A’ Error 110 flashingBurner lights Press the Service Reset Switch for 5 secondsSpark gap and position Check wiring Clean condensate drain systemX2 connector, is 230V AC across Terminals 1 Voltage at PCB X2 connector isReplace flame sensing electrode Replace Safety ThermostatShort Parts List 13.0 Short Parts ListPage Page Page GAS Boiler System Commissioning Checklist Date Energy Efficiency Checklist completed? Service RecordAfter Sales Service 0844 871 Warranty & ServiceSerial Number Date of Installation Installer Details name, address and contact numbers