Baxi Potterton BBU 15 HE manual 0086

Page 2

Natural Gas

Baxi Bermuda BBU 15 HE

G.C.No. 44 075 09

For use with the following electric firefronts:

Valor Dimension Classica Brass, Pewter or Black BBU Firefront

Valor Dimension Dream Gold, Chrome or Black BBU Firefront

Valor Dimension Innova BBU Firefront

Valor Dimension Regalia BBU Firefront

Valor Dimension Nano Chrome BBU Firefront

Valor Dimension Lyrica BBU Firefront

The Benchmark Scheme

Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure that customers are provided with the correct equipment for their needs, that it is installed, commissioned and serviced in accordance with the manufacturer’s instructions by competent persons and that it meets the requirements of the appropriate Building Regulations. The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and should be provided to the customer for future reference.

Installers are required to carry out installation, commissioning and servicing work in accordance with the Benchmark Code of Practice which is available from the Heating and Hotwater Industry Council who manage and promote the Scheme. Visit www.centralheating.co.uk for more information.

©Baxi Heating UK Ltd 2009 All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, or stored in any retrieval system of any nature (including in any database), in each case whether electronic, mechanical, recording or otherwise, without the prior written permission of the copyright owner, except for permitted fair dealing under Copyrights, Designs and Patents Act 1988.

Applications for the copyright owner’s permission to reproduce or make other use of any part of this publication should be made, giving details of the proposed use, to the following address:

The Company Secretary, Baxi Heating UK Ltd, The Wyvern Business Park, Stanier Way, Derby, DE21 6BF.

Full acknowledgement of author and source must be given.

WARNING: Any person who does any unauthorised act in relation to a copyright work may be liable to criminal prosecution and civil claims for damages.

Building Regulations and the Benchmark Commissioning Checklist

Building Regulations (England & Wales) require notification of the installation of a heating appliance to the relevant Local Authority Building Control Department. From 1 April 2005 this can be achieved via a Competent Persons Self Certification Scheme as an option to notifying the Local Authority directly. Similar arrangements will follow for Scotland and will apply in Northern Ireland from 1 January 2006.

The Health &Safety Executive operates the ‘Gas Safe Register’, a self-certification scheme for gas heating appliances.

These arrangements represent a change from the situation whereby compliance with Building Regulations was accepted as being demonstrated by completion of the Benchmark Logbook (which was then left on site with the customer).

With the introduction of Self Certification Schemes, the Benchmark Logbook is being withdrawn. However, a similar document in the form of a commissioning checklist and service interval record is incorporated at the back of these instructions.

This company is a member of the Benchmark initiative and fully supports the aims of the programme. Its aim is to improve the standards of installation and commissioning of central heating systems in the UK and to encourage the regular servicing of all central heating systems to ensure safety and efficiency.

Building Regulations require that installations should comply with manufacturer's instructions. It is therefore important that the commissioning checklist is completed by the installer. The relevant section of Building Regulations only relates to dwellings. Therefore the checklist only applies if the appliance is being installed in a dwelling or some related structure.

The flowchart opposite gives guidance for installers on the process necessary to ensure compliance with Building Regulations.

0086

ISO 9001

FM 00866

This product has an energy rating (A) on a scale of A to G.

For more information see www.boilers.org.uk. This is a certification mark.

2© Baxi Heating UK Ltd 2009

Image 2 Contents
Baxi Bermuda BBU 15 HE 0086 Installer Notification Guidelines Scheme Members onlyCodes of Practice, most recent version should be used Important Installation, Commissioning, Service & RepairLegislation Safe Manual Handling Contents Description ContentsIntroduction General Layout Layout FigFlue Kit 10m & 12.5m a Technical Data Bermuda HE Cbbu 15 HETreatment of Water Circulating Systems System DetailsWater Circulating Systems There is a drain cock supplied in the plumbing kitStorage Systems PipeworkSystem Controls Sealed Systems Figs , 7 Sealed Systems Location Site RequirementsBuilders Opening Fig Fireplace Opening & SurroundFlue No Horizontal Runs are PermittedElectrical Supply Fig VentilationGas Supply Fig Electrical Connection Gas ConnectionCondensate Drain General Condensate Disposal FigCondensate Pump Operation Total volume of the sump is 1.5 litresCondensate Disposal From Boiler 500mm MinBoiler Internal Wiring Boiler Internal Illustrated Wiring DiagramFlue System InstallationInitial Preparation Barb ‘C’ Clip Air Cowl Air Duct Collar Ribs Terminal Cap Gas Connection Siting the BoilerWater Connections Electrical ConnectionCommissioning the Boiler Completion & CommissioningCompletion Test Point Annual Servicing Annual ServicingAnnual Servicing Inspection Changing Components Electrode Assembly FigChanging Components Spark Generator FigSpark Generator Plug Electrode Fan Injector Fan FigBurner Fig Burner Spark Generator Plug Gas Feed Pipe InjectorInjector Gas Valve Earth Wire Gas Valve FigPCB Fig Safety Thermostat FigFloat Switches Fig NTC FigFlue Sampling Point Display Control Knobs Setting the Gas ValveSetting the Gas Valve CO2 check Error Codes Fault FindingInitial Fault Finding Checks Switch for 5 seconds Error 110 flashingBurner lights Press the Service Reset Go to section ‘A’Terminals 1 Voltage at PCB X2 connector is Clean condensate drain systemX2 connector, is 230V AC across Spark gap and position Check wiringReplace Safety Thermostat Replace flame sensing electrode13.0 Short Parts List Short Parts ListPage Page Page GAS Boiler System Commissioning Checklist Service Record Date Energy Efficiency Checklist completed?Installer Details name, address and contact numbers Warranty & ServiceSerial Number Date of Installation After Sales Service 0844 871